You are on page 1of 5

MANDALIKA URBAN AND TOURISM INFRASTRUCTURE PROJECT

(MUTIP)
Construction Of Core Infrastructure Package 1 : West And Middle Side
PP – WIKA – BRL, KSO

Contractor : PP - WIKA - BRL, KSO Report No :


Location : Date :
Weather : Instrument : WP
STATIONING : Measured by :
CROSS SECTION
NO. Overal Back sight Fore sight ELEVATION DEFF
Distance
DETAIL REMARKS
of TOP TOP
POINT Midle Hair Midle Hair DESIGN ACTUAL ( + )/( - )
CL BOTTOM BOTTOM

SKECHED:

INDONESIA TOURISM DEVELOPMENT CORPORATION CONSTRUCTION MANAGEMENT CONSULTAN CONTRACTOR


( ITDC ) PT. JAYA CM PP - WIKA-BRL, KSO
(……………………...………………) (……………………...………………) (………………….…………………)
MANDALIKA URBAN AND TOURISM INFRASTRUCTURE PROJECT
(MUTIP)
Construction Of Core Infrastructure Package 1 : West And Middle Side
PP – WIKA – BRL, KSO

Contractor : PP - WIKA - BRL, KSO Report No :


Location : Date :
Weather : Instrument :
STATIONING : Measured by :

LEVELING (Cross Section)


TOP TOP Distance ELEVATION
STA DETAIL BACK SIDE FORE SIDE (+)/(-) REMARKS
BOTTOM BOTTOM From CL DESIGN ACTUAL

SKECHED:

CONSTRUCTION MANAGEMENT CONSULTAN CONTRACTOR


PT. JAYA CM PP - WIKA-BRL, KSO

(……………………...………………) (………………….…………………)
MANDALIKA URBAN AND TOURISM INFRASTRUCTURE PROJECT
(MUTIP)
Construction Of Core Infrastructure Package 1 : West And Middle Side
PP – WIKA – BRL, KSO

Contractor : PP - WIKA - BRL, KSO Report No :


Location : Date :
Weather : Instrument :
STATIONING : Measured by :

LEVELING (Cross Section)


DISTANCE DELTA H ELEVATION
DETAIL Back sight Fore sight
AVERAGE AVERAGE
NO. POINT
TOP TOP
POINT Midle Hair Midle Hair ACTUAL DESIGN
BOTTOM BOTTOM

REMARKS:

INDONESIA TOURISM DEVELOPMENT CORPORATION CONSTRUCTION MANAGEMENT CONSULTAN CONTRACTOR


( ITDC ) PT. JAYA CM PP - WIKA-BRL, KSO
(……………………...………………) (……………………...………………) (………………….…………………)

You might also like