Professional Documents
Culture Documents
Bu018 Marco CM Wir 005146 R1
Bu018 Marco CM Wir 005146 R1
5HYLVLRQ 1
'DWH 25 Sep 2023
3DJH RI
7\SHRI'LVFLSOLQH
&LYLO6WUXFWXUDO $UFKLWHFWXUDO 0HFKDQLFDO (OHFWULFDO ,QIUD 2WKHUV
$SSURYHG'UDZLQJ *ULG
:RUNWREH,QVSHFWHG 5HIHUHQFH &RRUGLQDWHV
/RFDWLRQ
Inspection for Floor & Wall Marble dry layout for building BU018-MRC-
$V
D Frist floor Toilet Room # 212 Crema Marfil ID-GEN-PL- F-G/13-14 KLJKOLJKW
ZZZ-01D-00030 HGLQ
1
WKH
GUDZLQJ
7UDGH
0$5&2 3DFNDJH
&RQWUDFWRU
1DPHRI$XWKRUL]HG5HS 'DWH
6HDOۄ6WDPS
Kalidas.M 25 Sep 2023 $XWKRUL]HG6LJQDWXUH
6LJQDWXUH 6LJQDWXUH
MIR No: %80$5&2&0W,55146
Revision: 01
Date: 25 Sep2023
Page: 2 of 2
Inspection Clearance:
Discipline Field Discipline Materials in accordance with Yes No
Role Site Inspector
Engineer Package PM contract documents
QA/QC Signature
Part 3 – Approval
A. Approved B. Approved with Comments C. Revise and Resubmit D. Rejected
Signature: Signature:
:,51R BU018-MARCO-CM-WIR- 005146
5HYLVLRQ
'DWH 10 Sep 2023
3DJH RI
7\SHRI'LVFLSOLQH
&LYLO6WUXFWXUDO $UFKLWHFWXUDO 0HFKDQLFDO (OHFWULFDO ,QIUD 2WKHUV
$SSURYHG'UDZLQJ *ULG
:RUNWREH,QVSHFWHG 5HIHUHQFH &RRUGLQDWHV
/RFDWLRQ
Inspection for Floor & Wall Marble dry layout for building BU018-MRC-
$V
D Frist floor Toilet Room # 212 Crema Marfil ID-GEN-PL- F-G/13-14 KLJKOLJKW
ZZZ-01D-00030 HGLQ
1
WKH
GUDZLQJ
7UDGH
0$5&2 3DFNDJH
&RQWUDFWRU
1DPHRI$XWKRUL]HG5HS 'DWH
6HDOۄ6WDPS
Kalidas.M 10Sep 2023 $XWKRUL]HG6LJQDWXUH
6LJQDWXUH 6LJQDWXUH
MIR No: %80$5&2&0W,55146
Revision: 00
Date: 10 Sep2023
Page: 2 of 2
1. Dry lay of 4 elevations and flooring of bathroom inspected on 11th Sep and flooring rejected, 4 elevations approved with comments.
2. Heavy white veins and dark patches on the flooring material is totally unacceptable.
3. Unimar must cut the approved inspected slabs, anything not complying within the approved range will be rejected.
4. Flooring and cladding must cut from same block materials.
5. Proper tag numbers as per the drawing to put prior to delivery.
6. Packing and delivery to follow as per the approved criteria.
7.120 Grit sandpaper to be used all around edges after cutting before packing. The sandpaper must run on the edge of the tile to the
bottom not on the edge to the top polished face.
8. Subject to final inspection WIR approval.
9. Contractor must comply the MS and material submittal comments prior to start any installation works.
10. Contractor must conduct the requested tests and provide the test reports prior to start any installation works.
Inspection Clearance:
Discipline Field Discipline Materials in accordance with Yes No
Role Site Inspector
Engineer Package PM contract documents
QA/QC Signature
Part 3 – Approval
A. Approved B. Approved with Comments C. Revise and Resubmit D. Rejected
Signature: Signature:
© Versatile International 1
© Versatile International 2
© Versatile International 3
© Versatile International 5
Flooring Rejected- Dark patches
© Versatile International 6
© Versatile International 7
ITP No: BU018-MARCO-CMG-ITP-000022
Revision: 00
Date: 08-May-22
Description of Type of Applicable Specification / Acceptance Responsible Inspection & Test Code Records to be
Act. No. Desctiption of Activity | Process Freq.
Inspection / Test Control Procedure Controlling Criteria Person Consultant
Generated
MARCO C&B/DGDA
1. Document Review
Project Specifications -
As per
Architectural & ID
Document approved Prior to start MARCO Approved Submittals
1.1 Tile/Marble Material Submittal Approval Review Specifications 093013 R R R
Approval Submittals work Technical Checklist
Ceramic tiling,096340 Stone
Code A/B
flooring
Project Specifications -
As per
Architectural & ID
Document approved Prior to start MARCO Approved Shop
1.2 Shop Drawings Review Specifications 093013 R R R
Approval Submittals work Technical Drawings
Ceramic tiling,096340 Stone
Code A/B
flooring
Project Specifications -
As per
Architectural & ID
Document approved Prior to start MARCO
1.3 Method Statement/ITP Review Specifications 093013 R R R Approved MS & ITP
Approval Submittals work Technical
Ceramic tiling,096340 Stone
Code A/B
flooring
2. Material Receiving
3. Mock Up
Project specs
Project Specifications -
093013
Architectural & ID 1 for each
Ceramic QA/QC Approved Mock up
3.1 Mock up will be applied as per project specification Measuring /Visual Inspection Specifications 093013 type of H H H
tiling,096340 Engineer Inspection request
and dry lay approval Ceramic tiling,096340 Stone
Stone flooring /
tile/marble
flooring
MDS
Page: 1 of 2
Project specs
Project Specifications -
093013
Architectural & ID Prior to start
Ceramic QA/QC
4.1 Surface Preparation/Pre Installation/MEP approval Visual Inspection Specifications 093013 Tile/Marble W P N/A Checklist
tiling,096340 Engineer
/Waterproofing and water leak test /Document approval
Ceramic tiling,096340 Stone
Stone flooring /
Layout
(where required) flooring
MDS
Project specs After
Project Specifications -
093013 Surface
Architectural & ID
Ceramic Preparation/ QA/QC Inspection Request/
4.3 Tile/Marble (setting out) Surveying Inspection Specifications 093013 H W N/A
tiling,096340 Pre Engineer Checklist
Ceramic tiling,096340 Stone
Stone flooring / Installation
flooring
MDS inspection
Project specs After
Project Specifications -
093013 Surface
Architectural & ID
Ceramic Preparation/ QA/QC
4.3 Tile/Marble Dry Lay Visual Inspection Specifications 093013 H P N/A Checklist
tiling,096340 Pre Engineer
Ceramic tiling,096340 Stone
Stone flooring / Installation
flooring
MDS inspection
Project specs
Project Specifications -
093013 After
Architectural & ID
Ceramic Tile/Marble QA/QC Inspection Request/
4.4 Tile/Marble Installation Visual /Measuring Inspection Specifications 093013 H H P
tiling,096340 Layout Engineer Checklist
Ceramic tiling,096340 Stone
Stone flooring / Inspection
flooring
MDS
Project specs
Project Specifications -
093013 After
Architectural & ID
Ceramic Tile/Marble QA/QC Inspection Request/
4.5 Grouting Visual Inspection Specifications 093013 H H P
tiling,096340 Layout Engineer Checklist
Ceramic tiling,096340 Stone
Stone flooring / Inspection
flooring
MDS
Drawing/Diagrams Attached? Yes No H (Hold Point) = 100% Control through Inspection Request for specified activity or work, shall be implemented, recorded and
documented. Hold Point requires minimum 8, hours written notification with Consultant. Work shall not proceed without approval
from Consultant.
Page: 2 of 2
IC No : BU018-MARCO-CMG-IC-000022
Revision : 00
NOTATION
Tiles/Marble Works
1. Document Review/Approval
3. Work Process
Tiles/Marble Pre installation
Is the surface preparation & surveying is done as per approved shop drawing/
3.2
MDS ?
3.6 Is the Tile/Marble layout Starting Point as per approved shop drawing ?
Tiles/Marble installation
Are the Tile/Marble Spacers installed with thickness as per approved Shop
3.8
Drawings?
Is the Zero Joint provided in Tile/Marble work wherever mentioned in the approved
3.9
Shop Drawings ?
3.12 Is the Tile/Marble sloped towards the floor drain as per approved Shop Drawings ?
3.13 Are all the Tile/Marble work dimension as per approved Shop Drawings?
Page: 1 of 2
IC No : BU018-MARCO-CMG-IC-000022
Revision : 00
3.14 Are all the Thresholds installed as per approved Shop Drawings?
3.16 Are all the Tile/Marble skirting installed as per approved Shop Drawings/ MDS ?
Are all the Tiles/Marble terminated properly around the floor drains/MEP/Sanitary
3.17
Fixtures ?
Name &
Signature:
Page: 2 of 2
VICINITY MAP
B-GS-04
B-CS-01 B-OS-02A
B-H-03
SHH
B-OS-02B B-PU-01
B-H-02
B-OS-01
B-OS-02C
100
100
2. ALL MATERIAL AND EQUIPMENT SHALL TAKE THE PRIOR APPROVAL OF THE CLIENT BEFORE
15mm SHADOW GAP CL 03 15mm SHADOW GAP CL 03
10 12.5mm THK MOISTURE 12.5mm THK MOISTURE CONSTRUCTION.
600
600
600
600
547 547 RESISTANCE GYPSUM BOARD RESISTANCE GYPSUM BOARD
3. DO NOT SCALE DWGS. ONLY FIGURED DIMENSIONS MUST BE CONSIDERED
1500
SW 18
600
600
600
600
TOWEL RAIL
SW 32 EQ 200 EQ
393
DEMISTER PAD SW 13
GR302 ROBE HOOK LEGEND
PENDANT LIGHT SW 20
CL FFL : FINISH FLOOR LEVEL
MAGNIFYING MIRROR
SSL : STRUCTURAL SLAB LEVEL
100 CL
JR-03 JR-03
SHAVER OUTLET
CODE B
135
2725
2725
2735
2735
SW 10
HAND SHOWER
Signature : Hala Soliman
150
TD02C
HERITAGE DOOR
600
600
600
600
ST-09 CALATTA ORO VOLUME CONTROL
SHOWER NICHE (REFER TO DOOR DETAIL) ST-09 CALATTA ORO
100
100
150
530
SW 09.C CL
150 150 SW 01
WATERPROOFING
WATERPROOFING
BODY JET WALL FAUCET
100 EQ 125 EQ TELEPHONE
1800
1800
1800
WATERPROOFING
SW 05
1700
150
1520
SHOWER MIXER SHOWER MIXER
1500
350
1375
475
200
ST 09 CALACATTA ORO
600
600
600
VANITY COUNTER TOP
1180
CL Add grab bar indication
1075
925
GLASS PARTITION
100 1400 PAPER ROLL HOLDER
850
850
VANITY
REFER TO JOINERY DETAILS
50
ST-04a
595
CREMA MARFIL 100
SW 04 ST-04a
460
JR-03 WALL HUNG WC CREMA MARFIL
325
325
335
BUILT-IN BENCH
SW19 DOOR STOPPER
WASTE BIN UNDER VANITY SHELVES
-0.10 FFL ±0.00 FFL ±0.00 FFL -0.10 FFL
10
10
100
100
90
90
NOTE :
1082 100 VARIES
REFER TO SEPARATE SHOP DRAWING FOR
(W7)
Update as per client selection Bottom of flush plate ALL FIXATION DETAILS AND ALL TYPICAL DETAILS
Top of toilet seat will to be aligned with tile
respectively be joint (aprox 20mm WHICH APPLICABLE FOR ALL TOILET ID SHOP
20mm higher height increase) DRAWINGS
1 INTERNAL ELEVATION - 01 2 INTERNAL ELEVATION - 02
000303 Scale: 1:10 000303 Scale: 1:10
REFERENCE DESIGN DRAWINGS
DRAWING No: DRAWING TITLE.
WALL FINISH LEGEND WALL FINISH LEGEND BU018-SIE-ID-GEN-PL-L00-00D-000104-02 BUILDING D GROUND FLOOR PLAN WALL FINISHES LAYOUT
ROOM NAME TOILET - TYPE 1 (10 TOILETS ) ROOM NAME TOILET - TYPE 1 (10 TOILETS )
SHOP DRAWINGS
GROUND FLOOR ROOM NUMBERS L00-00D-01-105_002 L00-00D-01-107_002 L00-00D-01-109_002 L00-00D-01-111_002 L00-00D-01-112_002 GROUND FLOOR ROOM NUMBERS L00-00D-01-105_002 L00-00D-01-107_002 L00-00D-01-109_002 L00-00D-01-111_002 L00-00D-01-112_002 DESCRIPTION DATE REMARK
REV. NO.
FIRST FLOOR ROOM NUMBERS L01-00D-01-205_002 L01-00D-01-207_002 L01-00D-01-209_002 L01-00D-01-211_002 L01-00D-01-212_002 FIRST FLOOR ROOM NUMBERS L01-00D-01-205_002 L01-00D-01-207_002 L01-00D-01-209_002 L01-00D-01-211_002 L01-00D-01-212_002 00 FOR APPROVAL APR.18, 2023
CODE DESCRIPTION CODE DESCRIPTION
ST04a 20mm THK POLISHED CREMA MARFIL STONE ST04a 20mm THK POLISHED CREMA MARFIL STONE
CLIENT
STONE WALL DIMENSION VANITY FACE STONE WALL DIMENSION AT DOOR FACE BENCH
ROOM NAME ROOM NAME 7747 UMRO ADHAMRY STREET, DIPLOMATIC QUARTER
W1 W2 REMARKS W3 W4 W5 W6 W7 REMARKS UNIT #2, RIYADH 12512, KINGDOM OF SAUDI ARABIA
WWW.DGDA.GOV.SA
CONSULTANT
EMAAR BUSINESS PARK,
L00-00D-01-107_002 510 mm 510 mm VERIFY ACTUAL AT SITE L00-00D-01-107_002 745 mm 634 mm 634 mm 214 mm 1114 mm VERIFY ACTUAL AT SITE 1ST FLOOR, BUILDING #3,
UNIT #103/104, DUBAI 77890,
UNITED ARAB EMIRATES
WWW.STUDIOI.AE
L00-00D-01-109_002 516 mm 516 mm VERIFY ACTUAL AT SITE L00-00D-01-109_002 772 mm 627 mm 627 mm 226 mm 1126 mm VERIFY ACTUAL AT SITE
SUB CONSULTANT
EMARAT ATRIUM BUILDING,
GROUND FLOOR, BLOCK A,
OFFICES 4-6, DUBAI 26739,
UNITED ARAB EMIRATES
L00-00D-01-111_002 523 mm 523 mm VERIFY ACTUAL AT SITE L00-00D-01-111_002 762 mm 639 mm 639 mm 254 mm 1154 mm VERIFY ACTUAL AT SITE
WWW.WMEGLOBAL.COM
PROJECT TITLE
FIRST FLOOR ROOM NUMBERS FIRST FLOOR ROOM NUMBERS MOHAMMED AL-RASHID
FOR TRADING & CONTRACTING CO. LTD.
P.O.BOX 16191, RIYADH 11464, SAUDI ARABIA
TEL: 474-2452, 474-0856 FAX: 476-2189
L01-00D-01-205_002 492 mm 492 mm VERIFY ACTUAL AT SITE L01-00D-01-205_002 648 mm 696 mm 696 mm 178 mm 1078 mm VERIFY ACTUAL AT SITE
SIGNATURE SIGNATURE SIGNATURE SIGNATURE SIGNATURE
L01-00D-01-207_002 510 mm 510 mm VERIFY ACTUAL AT SITE L01-00D-01-207_002 745 mm 634 mm 634 mm 214 mm 1114 mm VERIFY ACTUAL AT SITE
SHAM K. WARALE RUBEN ABRAR RIZWAN AL AMEEN
STANDARD GUESTROOM A
L01-00D-01-211_002 523 mm 523 mm VERIFY ACTUAL AT SITE L01-00D-01-211_002 762 mm 639 mm 639 mm 254 mm 1154 mm VERIFY ACTUAL AT SITE
TOILET TYPE 1
L01-00D-01-212_002 523 mm 523 mm VERIFY ACTUAL AT SITE L01-00D-01-212_002 628 mm 714 mm 714 mm 254 mm 1154 mm VERIFY ACTUAL AT SITE
INTERNAL ELEVATION 01 & 02
BUILDING - D
DRAWING NO. REV NO. :
BU018-MRC-ID-GEN-EV-ZZZ-00D-000303 00
CADD BY: CHECKED BY: APPROVED BY: SCALE : SHEET DATE :
HPM RUBEN RUBEN 1:10 3/4 18.Apr.2023
VICINITY MAP
B-GS-04
B-CS-01 B-OS-02A
B-H-03
SHH
B-OS-02B B-PU-01
B-H-02
B-OS-01
B-OS-02C
ADJUSTABLE HANGER
ADJUSTABLE HANGER
ORIENTATION DATUM
N
2058 SUSPENSION SYSTEM SUSPENSION SYSTEM GEODETIC DATUM: WGS-84
2. ALL MATERIAL AND EQUIPMENT SHALL TAKE THE PRIOR APPROVAL OF THE CLIENT BEFORE
15mm SHADOW GAP CL 03 CL 03
12.5mm THK MOISTURE CONSTRUCTION.
JR-03 12.5mm THK MOISTURE
600
600
600
600
RESISTANCE GYPSUM BOARD CONCEALED LED LIGHT RESISTANCE GYPSUM BOARD 3. DO NOT SCALE DWGS. ONLY FIGURED DIMENSIONS MUST BE CONSIDERED
125 350 125
420
4. ALL ARCHITECTURAL DWGS MUST BE READ IN CONJUNCTION WITH STRUCTURAL &
ST-09 CORNER LED STRIP LIGHT
EQ EQ ELECTRO-MECHANICAL DWGS & RELATED SPECIFICATIONS .
SW 09.A CALACATTA ORO NICHE
RAIN SHOWER 5. ALL DIMENSIONS MUST BE VERIFIED BY THE CONTRACTOR BEFORE PREPARATION OF SHOPDRAWINGS
Follow Stone 6. FINISH FLOOR ELEVATIONS AND FINISH CEILING HEIGHTS ARE INDICATED ON THE FLOOR AND REFLECTED
ST-04a
90
CREMA MARFIL calacatta oro profile CEILING PLANS RESPECTIVELY
ST-04a 7. FINISHING TREATEMENT OF FLOORS , WALLS AND CEILINGS AS PER SCHEDULE OF FINISHES
ST-04a ST-09
CREMA MARFIL
CREMA MARFIL CALACATTA ORO NICHE 125 350 125
600
600
420
600
600
ST-04a ARTWORK
CREMA MARFIL Bottom of flush plate
SW 10
HAND SHOWER to be aligned with tile LEGEND
SW 18 300 VARIES 300 SW 20 joint (aprox 20mm FFL : FINISH FLOOR LEVEL
TOWEL RAIL MAGNIFYING MIRROR height increase) SSL : STRUCTURAL SLAB LEVEL
(W14)
90
65
ST-09
CALACATTA ORO NICHE
125 350 125
CODE B
2735
2750
ST-04a
2725
2725
JR-03
CONCEALED LED LIGHT EQ. EQ CREMA MARFIL
Signature Hala Soliman
420
SW 01
EQ EQ
470
470
600
600
WALL FAUCET
600
600
SW 09.C
ST-09 CALATTA ORO BODY JET ST 09 CALACATTA ORO
250
TELEPHONE
SW 02
180
Grab Bar
180
UNDER COUNTER BASIN
EQ EQ
165
1800
1800
SW 09.B
SHOWER MIXER VANITY SW 05
REFER TO JOINERY DETAILS DUAL PUSH PLATE
1500
ST-04a 370 370 SW 03
160
CREMA MARFIL WD01 WALNUT VENEER CONCEALED CISTERN
170
380
600
600
BUILT - IN BENCH PULL OUT DRAWER
600
600
519
SW 14
1100
450
320 PAPER ROLL HOLDER
ST-04a
225
925
CREMA MARFIL SW 04
JR-03 WALL HUNG WC
CONCEALED LED LIGHTING
50
590
590
SW 15
400 SPARE ROLL HOLDER
410
335
340
325
325
300
SW 16
SHOWER CHANNEL
190
-0.010 FFL
SLOPE
-0.015 FFL -0.010 0.00
±0.00 FFL
85
90
NOTE :
REFER TO SEPARATE SHOP DRAWING FOR
ALL FIXATION DETAILS AND ALL TYPICAL DETAILS
UNDER VANITY SHEELVES SW 11
REFER TO JOINERY DETAILS SHATTAF WATER SPRAY
Top of toilet seat will
Threshold down 10mm as per EI27
WHICH APPLICABLE FOR ALL TOILET ID SHOP
respectively be
20mm higher DRAWINGS
WALL FINISH LEGEND WALL FINISH LEGEND BU018-SIE-ID-GEN-PL-L00-00D-000105-02 BUILDING D GROUND FLOOR PLAN FLOOR FINISHES
ROOM NAME TOILET - TYPE 1 (10 TOILETS ) ROOM NAME TOILET - TYPE 1 (10 TOILETS ) SHOP DRAWINGS
REV. NO. DESCRIPTION DATE REMARK
GROUND FLOOR ROOM NUMBERS L00-00D-01-105_002 L00-00D-01-107_002 L00-00D-01-109_002 L00-00D-01-111_002 L00-00D-01-112_002 GROUND FLOOR ROOM NUMBERS L00-00D-01-105_002 L00-00D-01-107_002 L00-00D-01-109_002 L00-00D-01-111_002 L00-00D-01-112_002
00 FOR APPROVAL APR.18, 2023
FIRST FLOOR ROOM NUMBERS L01-00D-01-205_002 L01-00D-01-207_002 L01-00D-01-209_002 L01-00D-01-211_002 L01-00D-01-212_002 FIRST FLOOR ROOM NUMBERS L01-00D-01-205_002 L01-00D-01-207_002 L01-00D-01-209_002 L01-00D-01-211_002 L01-00D-01-212_002
CODE DESCRIPTION CODE DESCRIPTION
ST04a 20mm THK POLISHED CREMA MARFIL STONE ST04a 20mm THK POLISHED CREMA MARFIL STONE
ST09 20mm THK CALACATTA ORO ST09 20mm THK CALACATTA ORO
CLIENT
STONE WALL DIMENSION AT SHOWER FACE STONE WALL DIMENSION AT TOILET FACE 7747 UMRO ADHAMRY STREET, DIPLOMATIC QUARTER
ROOM NAME ROOM NAME UNIT #2, RIYADH 12512, KINGDOM OF SAUDI ARABIA
WWW.DGDA.GOV.SA
SUB CONSULTANT
EMARAT ATRIUM BUILDING,
L00-00D-01-109_002 588 mm 588 mm 1475 mm VERIFY ACTUAL AT SITE L00-00D-01-109_002 180 mm 180 mm 395 mm 227 mm VERIFY ACTUAL AT SITE
GROUND FLOOR, BLOCK A,
OFFICES 4-6, DUBAI 26739,
UNITED ARAB EMIRATES
WWW.WMEGLOBAL.COM
PROJECT TITLE
L00-00D-01-111_002 588 mm 588 mm 1475 mm VERIFY ACTUAL AT SITE L00-00D-01-111_002 185 mm 185 mm 380 mm 230 mm VERIFY ACTUAL AT SITE
SAMHAN HISTORICAL HOTEL
PROJECT ADDRESS: OLD AD'DIRIYAH,
KINGDOM OF SAUDI ARABIA, PHASE 4-IMPLEMENTATION
L00-00D-01-112_002 588 mm 588 mm 1475 mm VERIFY ACTUAL AT SITE L00-00D-01-112_002 - 193 mm - 233 mm VERIFY ACTUAL AT SITE CONTRACTOR :
MOHAMMED AL-RASHID
FOR TRADING & CONTRACTING CO. LTD.
FIRST FLOOR ROOM NUMBERS FIRST FLOOR ROOM NUMBERS P.O.BOX 16191, RIYADH 11464, SAUDI ARABIA
TEL: 474-2452, 474-0856 FAX: 476-2189
L01-00D-01-205_002 572 mm 572 mm 1443 mm VERIFY ACTUAL AT SITE L01-00D-01-205_002 180 mm 180 mm 370 mm 229 mm VERIFY ACTUAL AT SITE SIGNATURE SIGNATURE SIGNATURE SIGNATURE SIGNATURE
L01-00D-01-207_002 579 mm 579 mm 1457 mm VERIFY ACTUAL AT SITE L01-00D-01-207_002 184 mm 184 mm 369 mm 231 mm VERIFY ACTUAL AT SITE SHAM K. WARALE RUBEN ABRAR RIZWAN AL AMEEN
DRAWING TITLE :
L01-00D-01-209_002 588 mm 588 mm 1475 mm VERIFY ACTUAL AT SITE L01-00D-01-209_002 180 mm 180 mm 395 mm 227 mm VERIFY ACTUAL AT SITE
STANDARD GUESTROOM A
L01-00D-01-211_002 588 mm 588 mm 1475 mm VERIFY ACTUAL AT SITE L01-00D-01-211_002 185 mm 185 mm 380 mm 230 mm VERIFY ACTUAL AT SITE
TOILET TYPE 1
INTERNAL ELEVATION 03 & 04
L01-00D-01-212_002 588 mm 588 mm 1475 mm VERIFY ACTUAL AT SITE L01-00D-01-212_002 - 193 mm - 233 mm VERIFY ACTUAL AT SITE BUILDING - D
DRAWING NO. REV NO. :
BU018-MRC-ID-GEN-EV-ZZZ-00D-000304 00
CADD BY: CHECKED BY: APPROVED BY: SCALE : SHEET DATE :
HPM RUBEN RUBEN 1:10 4/4 18.Apr.2023
VICINITY MAP
B-GS-04
B-CS-01 B-OS-02A
B-H-03
SHH
B-OS-02B B-PU-01
VARIES VARIES B-H-02
231 (W10) (W11) B-OS-01
20
B-OS-02C
85
368 350
212
15 70 ST09 ST04a ST04a
127
126
265
265
185
185
600
38
39
53
ORIENTATION DATUM
FD 1227 VARIES 900 VARIES N GEODETIC DATUM: WGS-84
VARIES
125 125
261
(W8) (W9) PROJECT SYSTEM: UTM
(W3)
ST04a ME ZONE: 38N
161 CC
A
EQ. VARIES
SL O
600
(W2)
SLO
547
547
PE
GENERAL NOTES
PE
ST04a
1. ALL DIMENSIONS ARE IN MILLIMETERS , LEVELS ARE IN METERS .
2. ALL MATERIAL AND EQUIPMENT SHALL TAKE THE PRIOR APPROVAL OF THE CLIENT BEFORE
300
4
97
CONSTRUCTION.
000304
3. DO NOT SCALE DWGS. ONLY FIGURED DIMENSIONS MUST BE CONSIDERED
SETOUT POINT
300
EQ. VARIES
4. ALL ARCHITECTURAL DWGS MUST BE READ IN CONJUNCTION WITH STRUCTURAL &
EQ. VARIES
ST03a TOILET
(W1)
300
(W4)
ELECTRO-MECHANICAL DWGS & RELATED SPECIFICATIONS .
±0.00 FFL
5. ALL DIMENSIONS MUST BE VERIFIED BY THE CONTRACTOR BEFORE PREPARATION OF SHOPDRAWINGS
300
6. FINISH FLOOR ELEVATIONS AND FINISH CEILING HEIGHTS ARE INDICATED ON THE FLOOR AND REFLECTED
162
CEILING PLANS RESPECTIVELY
1 2
000303 000303
7. FINISHING TREATEMENT OF FLOORS , WALLS AND CEILINGS AS PER SCHEDULE OF FINISHES
Revise levels accordingly
Provide threshold 10 mm
ST04a
EQ. VARIES
LEGEND
ST04
(W5)
600 FFL : FINISH FLOOR LEVEL
600
900
162
300
300
3
000304 ST04a
519 CODE B
100
89
10
Signature : Hala Soliman
50
10mm
-0.010 FFL
PE
SLO
+0.450 FFL +0.450 FFL
ST04a
SHOWER ST04a
VARIES
VARIES
VARIES
(W7)
-0.015 FFL
(W2)
1134
(W)
ST04a
900
SAND BLASTED
SLO BUILT UP BUILT UP
PE BENCH ST04a BENCH
ST03a
-0.010 FFL
ST04a VARIES
VARIES 900
(W13)
50
(W12)
ST09
115
115
VARIES VARIES VARIES
(L-1) (L-2) (W14)
ST03a 20mm THK CREMA MARFIL STONE ST04a 20mm THK POLISHED CREMA MARFIL STONE
ST04a 20mm THK POLISHED CREMA MARFIL STONE (BUILT-UP BENCH) ST09 20mm THK CALACATTA ORO
CLIENT
ST04 20mm THK TRAVERTINO STONE THRESHOLD (TRAVERTINE BIEGE VIEN CUT)
W L1 L2 W2 REMARKS
PROGRAMME MANAGEMENT CONSULTANT
GROUND FLOOR ROOM NUMBERS 3RD FLOOR, VERDUN BUILDING,
7775 KING FAHD ROAD,
UNIT #215, RIYADH 12212,
KINGDOM OF SAUDI ARABIA
WWW.CURRIEBROWN.COM
SUB CONSULTANT
EMARAT ATRIUM BUILDING,
GROUND FLOOR, BLOCK A,
L00-00D-01-109_002 1114 mm 877 mm 877 mm 1134 mm VERIFY ACTUAL AT SITE OFFICES 4-6, DUBAI 26739,
UNITED ARAB EMIRATES
D E F G D E F G
WWW.WMEGLOBAL.COM
PROJECT TITLE
L00-00D-01-111_002
13 13 13 13
1134mm 877 mm 877 mm 1154 mm VERIFY ACTUAL AT SITE TOILET TYPE 1 TOILET TYPE 1 SAMHAN HISTORICAL HOTEL
PROJECT ADDRESS: OLD AD'DIRIYAH,
KINGDOM OF SAUDI ARABIA, PHASE 4-IMPLEMENTATION
MOHAMMED AL-RASHID
14' 14' 14' 14' FOR TRADING & CONTRACTING CO. LTD.
FIRST FLOOR ROOM NUMBERS P.O.BOX 16191, RIYADH 11464, SAUDI ARABIA
TEL: 474-2452, 474-0856 FAX: 476-2189
UP
UP
VOID
15 15 15 15
VOID
UP
DRAWING TITLE :
L01-00D-01-209_002 1114 mm 877 mm 877 mm 1134 mm VERIFY ACTUAL AT SITE STANDARD GUESTROOM A
TOILET TYPE 1
L01-00D-01-211_002
17 17 17 17
FLOORING
1 DF212 ‐1 CREMA MARFIL 2 60 60 5 1.80 HONED
TOTAL 20 5.53
ELEVATION 1
1 DW212 ‐1A CREMA MARFIL 2 90 33.5 1 0.30 NORMAL
9 DW212 ‐1I CREMA MARFIL 2 32.5 17.5 1 0.06 1 LENGTH CUT 45 BACKSIDE AFTER 1cm (CHECK DETAILS)
10 DW212 ‐1J CREMA MARFIL 2 60 17.5 4 0.42 1 LENGTH CUT 45 BACKSIDE AFTER 1cm (CHECK DETAILS)
TOTAL 24 8.02
ELEVATION 2
1 DW212 ‐2A CREMA MARFIL 2 62.8 32.5 1 0.20 NORMAL
4 DW212 ‐2D CREMA MARFIL 2 71.4 60 1 0.43 1 WIDTH CUT 45 BACKSIDE (CHECK DETAILS)
5 DW212 ‐2E CREMA MARFIL 2 32.5 29 1 0.09 1 LENGTH CUT 45 BACKSIDE (CHECK DETAILS)
6 DW212 ‐2F CREMA MARFIL 2 60 29 3 0.52 1 LENGTH CUT 45 BACKSIDE (CHECK DETAILS)
TOTAL 19 5.83
ELEVATION 3
1 DW212 ‐3A CREMA MARFIL 2 58.8 34 1 0.20 NORMAL
2 DW212 ‐3B CREMA MARFIL 2 60 58.8 4 1.41 NORMAL WITH WATER JET 1PC OPENING HOLE (CHECK DETAILS)
8 DW212 ‐3H CREMA MARFIL 2 62.8 60 4 1.51 NORMAL WITH WATER JET 1PC OPENING HOLE (CHECK DETAILS)
TOTAL 16 5.38
ELEVATION 4
1 DW212 ‐4A CREMA MARFIL 2 61 32.5 1 0.20 NORMAL
2 DW212 ‐4B CREMA MARFIL 2 61 60 4 1.46 NORMAL CUT WITH 3PCS OPENING HOLE (CHECK DETAILS)
5 DW212 ‐4E CREMA MARFIL 2 32.5 11.1 1 0.04 1 LENGTH CUT 45 BACKSIDE AFTER 1CM (CHECK DETAILS)
6 DW212 ‐4F CREMA MARFIL 2 60 11.1 4 0.27 1 LENGTH CUT 45 BACKSIDE AFTER 1CM (CHECK DETAILS)
9 DW212 ‐4I CREMA MARFIL 2 33.3 32.5 1 0.11 1 WIDTH CUT 45 BACKSIDE AFTER 1CM (CHECK DETAILS)
10 DW212 ‐4J CREMA MARFIL 2 60 33.3 4 0.80 1 LENGTH CUT 45 BACKSIDE AFTER 1CM (CHECK DETAILS)
TOTAL 25 6.09
BENCH
1 DB212‐1 CREMA MARFIL 2 108.3 33 1 0.36 HALF ROUND 1 LENGTH (CHECK DETAILS)
TOTAL 2 0.86
CONCRETE FILL
350
DF212-2A ADD 50MM
AS AGREED
265
33
DF212-1A DF212-1B
184
185+50 = TO BE 235
235
121 121 900 121
628
185
DF212-1C
496
DF212-2B
DF212-3B DF212-3C
DF212 -3D
DF212-3E
DF212-6
714
4
1000
496
000304
DF212-1D DF212-1E
DF212-2D
1427 DF212-3F
2
1 000303
DF212 -2E
000303
DF212-3G DF212-2C
713
100
900
290
20
DF212-5
20 313
DF212-4
1114
914
3
000304
202
1063
1103
900
30 100 30 100 30 100 30 100 30 100 30 100 30 100 30 100 30 100 30 100 30 100 30 100
100
2075 883 881
1449
GROUND FLOOR FLOORING
BUILDING D
TOILET 212 - TYPE 1
576
DW212-1J4
600
600
DW212-1B4 DW212-1D4 DW212-1F3 DW212-1H4 CUT 45 BACKSIDE
AFTER 1CM
DW212-1J3
600
600
DW212-1B3 DW212-1D3 NO DW212-1H3
MARBLE
DW212-1J2
2735
600
600
DW212-1B2 DW212-1D2 DW212-1F2
DW212-1H2
125
DW212-1I DW212-1J1
600
600
DW212-1B1 DW212-1D1 DW212-1F1 DW212-1H1
925
850
325
335
1082 100
ELEVATION 1
BUILDING D
TOILET 212 - TYPE 1
203
35
628 714 713 900 163
+2.66 CL
DW212-2H4
600
600
DW212-2B4 DW212-2C DW212-2D DW212-2G4
97 1040 97
290
DW212-2H3
CUT 45 BACKSIDE
DW212-2F3
DW212-2B3
600
600
EQ 200 EQ
DW212-2G3
DW212-2F2
DW212-2H1 DW212-2H2
2725
2735
600
600
DW212-2B2 DW212-2G2
WATERPROOFING
1800
DW212-2F1
DW212-2G1
475
600
DW212-2B1
DB112-1
850
1083
DW212-2E
460
460
DB112-2
325
DW212-2A
±0.00 FFL -0.10 FFL
10
100
90
1063
BUILDING D
TOILET 212 - TYPE 1
628
2058
588 900 588
FFL 20 20
FLRNAME
DW212-3D3
600
600
DW212-3B4 DW212-3H4
DW212-3D2
600
600
DW212-3B3 DW212-3H3
DW212-3F
75
2735
2750
DW212-3B2
POLISHED
600
600
460
DW212-3H2
DW212-3E
65
600
600
DW212-3B1 DW212-3D1 DW212-3H1
335
340
DW212-3A DW212-3C DW212-3G
FFL FFL
SLOPE
FLRNAME FLRNAME
ELEVATION 3
BUILDING D
TOILET 212- TYPE 1
282
CUT 45 BACKSIDE
AFTER 1CM 242
610 900
121
111 333
180
DW212-4J4
DW212-4H3 DW212-4H4
DW212-4F3 DW212-4F4
121
600
600
121
350 110
420
400
DW212-4B4 DW212-4D4
90
DW212-4J3
CUT 45 BACKSIDE
121
121
350 110
600
600
420
400
DW212-4B3 DW212-4D3
90
DW212-4H2
DW212-4F2
121
DW212-4J2
2725
2725
350 110
420
400
600
600
DW212-4B2 DW212-4D2
180
DW212-4H1
DW212-4F1
DW212-4J1
600
600
DW212-4B1 DW212-4D1
DW212-4G
DW212-4E
DW212-4I
325
325
DW212-4A DW212-4C
ELEVATION 4