BEAM ELEVATIONS QUANTITY TAKE OFF - TL TM TR TM TR TM TR TL TM TR Top TL/TR

SIZE UNIT WEIGHT (Kg/m) LENGTH (m) T.WEIGHT (Kg)


PLEASE NOTE :
Y10 0.617 622.0 384.0 BL BM BR BM BR BM BR BL BM BR Bot BL/BR

IN CASE OF STRUCTURAL FAILURE,


Y16 1.580 463.0 731.7 THE DESIGN ENGINEERS OF THIS PROJECT
TYPE E1 - END SPAN TYPE INT - INTERIOR SPAN TYPE E2 - END SPAN TYPE SS - SINGLE SPAN TYPE CA - CANTILEVER TYPE CB - CANTILEVER
WOULD
Y20 2.469 254.1 627.4 NOT BE HELD RESPONSIBLE OR LIABLE
Concrete Beam Rebar Schedule:[1] FOR ANY REASON,
T.WEIGHT (Kg) 1,743.0 IF THE CONSTRUCTION OF THIS PROJECT
Beam Hanger Top Reinforcements Bottom Reinforcements Links Side Bars Remarks WAS NOT SUPERVISED BY THEM.
NO SIZE QUA LENGTH (mm) TOTAL FORM Width Depth Span
Mark Type Left Center Right Left Center Right Left Center Right Similar
(mm) (mm) (mm) DESIGN CRITERIA
1 16 3 1250 3.75 1240
1B1 230 750 1500 CA 3Y16 4Y20\n4Y20 3Y20 Y10-300 Y10-300 Y10-300
1). All designs are to BS 8110.
2 20 3 9850 29.55 660
9150

1B2 230 750 6580 INT 4Y20\n4Y20 3Y20 6Y20\n5Y20 5Y20\n5Y20 Y16 Y10 Y10 Y10 2). Cover to R. C. Column base = 50mm
170 120 3). Cover to R. C. Column = 25mm
3 10 40 1950 78.00 4). Cover to R. C. Beam = 25mm
690 690 1B3 230 750 1700 INT 6Y20\n5Y20 6Y20 3Y16\n2Y16 Y16 2Y16 Y10-175 Y10-300 Y10-150
170
5). Cover to R. C. Slab & Stair case = 25mm
6). Concrete mix = 1:2:4
1B4 230 750 6370 CA 3Y16\n2Y16 3Y16 2Y16 Y10-300 Y10-300 Y10-300 7). Maximum Aggregate size = 20mm
4 20 4 3800 15.20 3790

2910
5 20 4 3550 14.20 620
1B5 230 600 2990 CB 2Y16 2Y16 Y10-300 Y10-300 Y10-300
6 20 3 3950 11.85 3920

1B6 230 450 3370 E1 2Y16 2Y20 2Y16 Y10-300 Y10-300 Y10-300
7 20 2 8900 17.80 8880
1B7 230 450 2710 INT 2Y20 2Y16 2Y16 2Y16 Y10-300 Y10-300 Y10-300
8 20 5 4050 20.25 4030 1B8 230 450 3710 INT 2Y16 2Y16 2Y20 2Y16 Y10-300 Y10-300 Y10-300
1B9 230 600 9360 E2 2Y20 2Y16 2Y16 Y10-300 Y10-300 Y10-300
9 20 5 2150 10.75 2150

10 16 1 2700 2.70 2670 1B10 230 600 2990 CB 2Y16 2Y16 Y10-300 Y10-300 Y10-300

11 20 6 3400 20.40 3400

1B11 230 450 3370 E1 2Y16 2Y16 2Y16 Y10-300 Y10-300 Y10-300
12 16 2 8450 16.90 7790
660 1B12 230 450 2710 INT 2Y16 2Y16 2Y16 2Y16 Y10-300 Y10-300 Y10-300
1B13 230 450 3710 INT 2Y16 2Y16 2Y16 2Y16 Y10-300 Y10-300 Y10-300
13 16 3 2450 7.35 2450
1B14 230 600 6370 CA 2Y16 2Y16 Y10-300 Y10-300 Y10-300
7030
14 16 2 7650 15.30 620
1B17 230 650 5530 E1 2Y16 2Y20 2Y20 Y10-300 Y10-300 Y10-300
15 16 3 5400 16.20 5380
1B16 230 650 2590 INT 2Y20 2Y16 2Y16 2Y16 Y10-300 Y10-300 Y10-300
3030 1B15 230 650 2920 E2 2Y16 2Y16 2Y16 Y10-300 Y10-300 Y10-300
16 16 4 3900 15.60 350 520

17 16 4 3850 15.40 350 2970 520 1B19 230 450 5530 E1 2Y16 3Y20\n3Y20 3Y20 Y10-300 Y10-300 Y10-225
170 120
1B18 230 450 5510 E2 3Y20\n3Y20 2Y16 3Y20 Y10-225 Y10-300 Y10-300
18 10 171 1650 282.15 540 540

170

19 16 2 3600 7.20
3240
1B21 230 450 5530 E1 2Y16 3Y20\n2Y20 3Y16 Y10-300 Y10-300 Y10-300
350

20 16 4 10650 42.60 350


10280 1B20 230 450 5510 E2 3Y20\n2Y20 3Y16 3Y20 Y10-300 Y10-300 Y10-300
170 120

21 10 146 1350 197.10 390 390

170
1B22 230 600 11030 SS 2Y16 2Y16 Y10-300 Y10-300 Y10-300

22 20 2 1850 3.70 1840


1B23 230 600 11030 SS 2Y16 2Y16 Y10-300 Y10-300 Y10-300
23 16 2 6000 12.00 5960

24 20 2 3600 7.20 3560 1B24 230 600 5980 CB 2Y16 2Y16 Y10-300 Y10-300 Y10-300
7740
25 16 2 8100 16.20 350

26 16 2 10200 20.40 350


9480
350

9570
27 16 2 9950 19.90 350

7380
28 16 2 7900 15.80 520
PROJECT / LOCATION :

29 16 2 7250 14.50 350


6380
520

4870
30 16 6 5250 31.50 350

31 20 2 7050 14.10 490


6520

170 120

32 10 37 1750 64.75 590 590

170 CONTENT :

33 20 2 2400 4.80 2370 BASEMENT BEAM SCHEDULE

34 16 4 5800 23.20 5430


350
CONSULTANT :
35 20 3 11850 35.55 370
11120
370

36 20 6 3050 18.30 3030

37 20 5 1950 9.75 1930

4850
38 16 5 5200 26.00 350

39 16 3 5800 17.40 350


5450

40 20 3 6900 20.70 6500


370 DESIGNED SHEET :

11180
41 16 4 11900 47.60 350 350 DRAWN
IBENEME CHISOM
42 16 4 11850 47.40 350
11120
350
CHECKED :
6020 ENGR IBENEME CHISOM
43 16 2 7050 14.10 520 520
SCALE :
44 16 2 7000 14.00 520
5960