Document Submittal Log

Project Name: FITNESS TIME Project Location:

Contractor Name: AWTAD ALFAHD CO Update Date: 01/10/2023

1 A : Approved = #REF! B : Approved with Comments = #REF! C : Revise and Re-submit = #REF!

D : Rejected = #REF! E : For Information = #REF!

Consultant Response
Submittal Submission Date To OWNER Response Return Date to
SN Submittal no. Submittal Type Description Date Actual Duration Status Comments
Discipline OWNER Contractor
(If Required)

1 Plumping Material Approval Pipes for drainage inside building (APPLACO - NEPRO) 10-Sep-23 B

2 Plumping Material Approval MANHOLE COVERS (SAUDI CAST ) 17-Sep-23 B

3 Plumping Material Approval PARKING TRANCH COVERS (SAUDI CAST ) 17-Sep-23 B

ROOF DRAINS & PARAPET ROOF DRAIN (SAUDI


4 Plumping Material Approval 17-Sep-23 B
CAST )

FLOOR DRAIN & PROMENADE DRAIN (SAUDI


5 Plumping Material Approval
CAST)

6 Plumping Material Approval ROOF VENT CAP (SAUDI CAST)

WATER HEATER (SAUDI


7 Plumping Material Approval 1-oct-2023
CERMAICS )

CENTERAL WATER
8 Plumping Material Approval
HEATERS (A.O SMITH)

9 Plumping Material Approval Circulation pumps (PENTAIR)

IRRIGATION VALVES AND ACCESSORISE (Rain


10 Plumping Material Approval 17-Sep-23 B
bird.)

11 Plumping Material Approval Water supply pipes (Aquatherm) 10-Sep-23 B

12 Plumping Material Approval Water supply Valves (Carane- Pegler)

13 Plumping Material Approval HDPE PIPE AND FITTINGS.SPS) 9-Nov-23 B

14 long lead item Others Material Approval WATER BOOSTER PUMP ( Groundfos )

15 Others Material Approval SUBMERSIBLE PUMPS ( Groundfos )

16 Others Material Approval IRRIGATION PUMP ( Groundfos )

HVAC WORKS- Rooftop package Unit,PACU,Air


17 long lead item HVAC Material Approval Handling Unit,AHU, Totally fresh air unit,DODU,AC 25-Sep-23
SPLIT , FCU, UNITS, VRF Air conditioning (LG)

18 HVAC Material Approval DUCT INSULATION (Afico) 17-Sep-23 B

19 HVAC Material Approval DUCT LINING (Afico) 17-Sep-23 B

20 HVAC DUCT TAPE (Abro)

21 HVAC DUCT TAPE (Abro)

22 HVAC Flexible duct connector (Acrotec)

23 HVAC Material Approval Self adhesive hanger (Acrotec)

24 HVAC Flexible duct (Atco)

25 HVAC Duct sealant (Foster)

26 HVAC Adhesive (Foster)

27 HVAC Material Approval COPPER PIPES (Muller) 17-Sep-23 B

28 HVAC Material Approval FANS (GreenHeck) 17-Sep-23 B

29 HVAC Material Approval AC Duct System Accessories (RABIE- GGC) 17-Sep-23 B

Fire Fighting Material Approval PUDDLE FLANGES (ALI ATALAH) 17-Sep-23 B

30 Fire Fighting Material Approval Fire Fighting Pipe (Shield) 17-Sep-23 B

31 Fire Fighting Material Approval Grooved fittings (MECH) 17-Sep-23 B

32 Fire Fighting Material Approval Threaded fittings (HITACHI) 17-Sep-23 B

33 long lead item Fire Fighting Material Approval Fire Fighting Pumps (SFFECO) 1-oct-2023

FIRE FIGHTING Accessories


,VALVES, Automatic Air
34 Fire Fighting Material Approval vent Automatic Air vent 1-Oct-23
&FHC & Fire extinguisher
ABC . (SFFECO)

Zone control valve & Alarm


35 Fire Fighting Material Approval
control valve assembly (MULLER-SFFECO)

36 Fire Fighting Material Approval SPRINKLER (Tyco) 1-Oct-23 B

Fire Fighting Material Approval FIRE EXTINGUISHER 1-Oct-23

Fire Fighting Material Approval AUTOMATIC FIRE EXTINGUISHER 1-Oct-23

Ref. no.: MPMO-017_Rev.01


Document Submittal Log

Project Name: FITNESS TIME Project Location:

Contractor Name: AWTAD ALFAHD CO Update Date: 01/10/2023

1 A : Approved = #REF! B : Approved with Comments = #REF! C : Revise and Re-submit = #REF!

D : Rejected = #REF! E : For Information = #REF!

Consultant Response
Submittal Submission Date To OWNER Response Return Date to
SN Submittal no. Submittal Type Description Date Actual Duration Status Comments
Discipline OWNER Contractor
(If Required)

A : Approved B : Approved with Comments D : Rejected E : For Information

BAPB-MD-20-GATE BARIER-SUPPLIER :ANFAL

Ref. no.: MPMO-017_Rev.01


Submittal Status Submittal Percentage Submittal Status
A : Approved #REF! #REF!

B : Approved with Comments #REF! #REF!

C : Revise and Re-submit #REF! #REF!

D : Rejected #REF! #REF!

E : For Information #REF! #REF!

Total Submission 1

A : Approved B : Approved with Comments


C : Revise and Re-submit D : Rejected
E : For Information
Submittal Status

A : Approved B : Approved with Comments


C : Revise and Re-submit D : Rejected
E : For Information

You might also like