Pre-production Pile Testing

Location 1: Oats Street – Viaduct 1

OLE Mast
OLE Mast
3m GE Fence
7m

18m
20m Piling Laydown Area
12m Test Area
Navisworks Model – Abutment 3
22m Boundary Fence

Site Access
Pre-production Pile Testing
Location 1: Oats Street – Viaduct 1

OLE Mast
OLE Mast

GE Fence
10m

Reaction Piles 1050 1050 1050

Piling Laydown Area


Test Piles 1050 1200

Reaction Piles 1050 1050


Navisworks Model – Abutment 3
1050
Boundary Fence

Site Access
Pre-production Pile Testing Tests:
Static Load Test
Dynamic Load Test
Location 1: Oats Street – Viaduct 1 Thermal Integrity Profiling

Navisworks Model – Abutment 3


Pre-production Pile Testing
Location 1: Oats Street – Viaduct 1

OLE

Boundary Fence

GE Fence
12m

Ground Level Test Area

8m Reaction Pile

Reaction Pile
Test Pile
10m
Pre-production Pile Testing
Location 2: Welshpool Road – Viaduct 2

OLE Mast OLE Mast


3m
GE Fence

8.5m
Future Retaining Wall
Underground Services
Underground Services
20m

Piling Laydown Area Test Area


8m

20m
Site Access
Boundary Fence

Navisworks Model – Abutment 3


Pre-production Pile Testing
Location 2: Welshpool Road – Viaduct 2

OLE Mast OLE Mast


GE Fence

11m
Future Retaining Wall
Underground Services
Underground Services

Reaction Piles 1050 1050 1050

Piling Laydown Area


Test Piles 1050 1200

Reaction Piles 1050 1050 1050

Site Access
Boundary Fence

Navisworks Model – Abutment 3


Pre-production Pile Testing Tests:
Static Load Test
Dynamic Load Test
Thermal Integrity Profiling
Location 2: Welshpool Road – Viaduct 2
Pre-production Pile Testing
Location 2: Welshpool Road – Viaduct 2

OLE

Boundary Fence

GE Fence
8m

Ground Level Test Area

8m

Reaction Pile

Reaction Pile
Test Pile
11m