Activity ID

Discipline Activity Name

Substation

General General
General Civil Works
General Earth Works CS1000
General
General
General
General Garitry and Trenches
General Foundation of Gantry CS1210
General
General
General
General
General
General
General
General
General Trenches Construction CS1220
General

General
General
General
General
General
General Fence and Gate House
General Fence Foundation ConstructioCS1010
General

General
General

General
General Fence Installation CS2750
General
General
General
General Gate House Foundation ConstrCS2830
General

General
General
General
General
General
General
General Gate House Structure ConstrucCS2840
General
General
General
General
General
General
General
General
General Gate House HVAC ConstructiCS2850
General
General Road & Drainage
General Internal Road Construction CS2760
General
General
General
General
General Drainage Construction CS2770
General
General
General
General
General
General
General Earthing Net
General Earthing Net Laying CS2580
General
General
General
General
General Earthing Connection CS2590
General
ControlBuilding Control Building
ControlBuilding Civil Works
ControlBuilding Equipment Foundation
ControlBuilding
ControlBuilding Control & Protection System CS1230
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding SCADA System Equipment FoCS1240
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding Meter System Equipment FounCS1250
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding DC & UPS Foundation CS1260
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding PPC Equipment Foundation CS1280
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding ECA Equipment Foundation CS1290
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding Communication System EquipCS1300
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding Foundation of #1 35kV GIS F CS2680
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding Foundation of #2 35kV GIS F CS2690
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding 400V Panel Foundation CS2790
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding Building
ControlBuilding Building Foundation CS1130
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding

ControlBuilding

ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding

ControlBuilding Upper Structure CS1140


ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding Closing and Roof CS1150
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding Electrical Installation CS1160
ControlBuilding
ControlBuilding
ControlBuilding HVAC Installation CS1170
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding Carpentry and Finishes CS1180
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding Sanitation and Plumbing CS1190
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding Furniture and Toilets CS1200
ControlBuilding
ControlBuilding
ControlBuilding Installation
ControlBuilding Electrical Secondary System Installation
ControlBuilding
ControlBuilding Control & Protection System ECS2350
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding SCADA System installation CS2390
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding Fire Alarm System Erection CS2450
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding Meter Panel Erection CS2410
ControlBuilding
ControlBuilding
ControlBuilding DC Power Supply System ErecCS2420
ControlBuilding
ControlBuilding
ControlBuilding DC Battery Group Erection CS2430
ControlBuilding
ControlBuilding
ControlBuilding UPS Power Erection CS2440
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding PPC Equipment Installation CS2710
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding ECA Equipment Installation CS2780
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding Internal Communication
ControlBuilding Communication Power Supply CS2460
ControlBuilding Communication System primary equipment Installation
ControlBuilding Microwave communication equipment installation
ControlBuilding Communication battery installation
ControlBuilding Communication system Earthing
ControlBuilding PABX System Erection CS2470
ControlBuilding PABX System Erection
ControlBuilding Integrated Distribution Cabine CS2480
ControlBuilding Panel Installation
ControlBuilding Earthing
ControlBuilding External Communication
ControlBuilding Grid System communication CCS2490
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding Auxiliary System
ControlBuilding Diesel generator Erection CS2280
ControlBuilding
ControlBuilding Power center Boards Erection CS2300
ControlBuilding
ControlBuilding MCC Boards Erection CS2310
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding Cable Laying & Connection
ControlBuilding
ControlBuilding LV Cable (Power & Lighting)CS2500
ControlBuilding
ControlBuilding LV Cable (Power & Lighting)CS2510
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding LV Cable (Control) Laying CS2520
ControlBuilding
ControlBuilding LV Cable (Control) ConnectioCS2530
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding Communication Cable LayingCS2540
ControlBuilding
ControlBuilding Communication Cable ConnecCS2550
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding MV Cable Laying CS2730
ControlBuilding
ControlBuilding MV Cable Connection CS2740
ControlBuilding
ControlBuilding
ControlBuilding 35KV GIS
ControlBuilding 35kV GIS Erection #1 CS2120
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding 35kV GIS Erection #2 CS2180
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding Bus Bar
ControlBuilding 35kV bus-tie Switchgear ErectCS2240
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding 35KV Bus Bar and Gantry EreCS2250
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding Lighting (Control Building)
ControlBuilding Lighting of Control Building InCS2720
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding
ControlBuilding 400V Panel
ControlBuilding 400V Panel Installation CS2700
ControlBuilding
220kVSwitchyard 220kV Switchyard
220kVSwitchyard Civil Works
220kVSwitchyard Power Transformer Foundation
220kVSwitchyard Foundation & Fire Walls of MCS1070
220kVSwitchyard

220kVSwitchyard

220kVSwitchyard
220kVSwitchyard

220kVSwitchyard
220kVSwitchyard

220kVSwitchyard
220kVSwitchyard Foundation & Fire Walls of MCS1080
220kVSwitchyard

220kVSwitchyard
220kVSwitchyard
220kVSwitchyard
220kVSwitchyard
220kVSwitchyard
220kVSwitchyard
220kVSwitchyard Oil Pit Construction CS1090
220kVSwitchyard

220kVSwitchyard
220kVSwitchyard
220kVSwitchyard
220kVSwitchyard
220kVSwitchyard

220kVSwitchyard
220kVSwitchyard Equipment Supports & Foundation
220kVSwitchyard Foundation of #1 Service TranCS2600
220kVSwitchyard

222kVSwitchyard
223kVSwitchyard
224kVSwitchyard
225kVSwitchyard
226kVSwitchyard

227kVSwitchyard
228kVSwitchyard Foundation of #2 Service TranCS2610
229kVSwitchyard

231kVSwitchyard
232kVSwitchyard
233kVSwitchyard
234kVSwitchyard
235kVSwitchyard
236kVSwitchyard
237kVSwitchyard Foundation of #1 AIS EquipmCS2620
238kVSwitchyard

239kVSwitchyard
240kVSwitchyard
241kVSwitchyard
242kVSwitchyard
243kVSwitchyard
244kVSwitchyard

245kVSwitchyard
246kVSwitchyard Foundation of #2 AIS EquipmCS2630
247kVSwitchyard

248kVSwitchyard
249kVSwitchyard
250kVSwitchyard
251kVSwitchyard
252kVSwitchyard
253kVSwitchyard

254kVSwitchyard
255kVSwitchyard Support of #1 Bus Bar CS2640
256kVSwitchyard

257kVSwitchyard
258kVSwitchyard
259kVSwitchyard
260kVSwitchyard
261kVSwitchyard

262kVSwitchyard
263kVSwitchyard
264kVSwitchyard Support of #2 Bus Bar CS2650
265kVSwitchyard

266kVSwitchyard
267kVSwitchyard
268kVSwitchyard
269kVSwitchyard
270kVSwitchyard

271kVSwitchyard
272kVSwitchyard
273kVSwitchyard Support of #1 Lightning CS2660
274kVSwitchyard

275kVSwitchyard
276kVSwitchyard
277kVSwitchyard
278kVSwitchyard
279kVSwitchyard

280kVSwitchyard
281kVSwitchyard
282kVSwitchyard Support of #2 Lightning CS2670
283kVSwitchyard
284kVSwitchyard
285kVSwitchyard
286kVSwitchyard
287kVSwitchyard
288kVSwitchyard

289kVSwitchyard
290kVSwitchyard
291kVSwitchyard Installation
292kVSwitchyard Main Transformer Installation
293kVSwitchyard Main Transformer #1 PositionCS2000
294kVSwitchyard
295kVSwitchyard Main Transformer #1 ErectionCS2010
296kVSwitchyard
297kVSwitchyard
298kVSwitchyard
299kVSwitchyard
300kVSwitchyard
301kVSwitchyard Main Transformer #2 PositionCS2020
302kVSwitchyard
303kVSwitchyard Main Transformer #2 ErectionCS2030
304kVSwitchyard
305kVSwitchyard
306kVSwitchyard
307kVSwitchyard
308kVSwitchyard
309kVSwitchyard 220kV AIS Installation
310kVSwitchyard
311kVSwitchyard 220kV Disconnector Switches CS2040
312kVSwitchyard
313kVSwitchyard 220kV Potential Transformer ECS2050
314kVSwitchyard
315kVSwitchyard Current Transformer Erection CS2060
316kVSwitchyard
317kVSwitchyard Circuit Breaker Erection CS2070
318kVSwitchyard
319kVSwitchyard
320kVSwitchyard 220kV Disconnector Switches CS2080
321kVSwitchyard
322kVSwitchyard 220kV Potential Transformer ECS2090
323kVSwitchyard
324kVSwitchyard Current Transformer Erection CS2100
325kVSwitchyard
326kVSwitchyard Circuit Breaker Erection CS2110
327kVSwitchyard
328kVSwitchyard Accessories
329kVSwitchyard Lightning Arrester Erection # CS2320
330kVSwitchyard
331kVSwitchyard Lightning Arrester Erection # CS2330
332kVSwitchyard
333kVSwitchyard Accessories Installation CS2340
334kVSwitchyard
335kVSwitchyard Service Transformer
336kVSwitchyard #1 Service Transformer InstallCS2360
337kVSwitchyard
338kVSwitchyard
339kVSwitchyard
340kVSwitchyard
341kVSwitchyard
342kVSwitchyard
343kVSwitchyard #2 Service Transformer InstallCS2370
344kVSwitchyard
345kVSwitchyard
346kVSwitchyard
347kVSwitchyard
348kVSwitchyard
349kVSwitchyard
350kVSwitchyard Power Cables and Control Cables Installation
351kVSwitchyard Power Cables and Control CablCS2820
220kVSwitchyard
220kVSwitchyard
220kVSwitchyard
CommonSystem Common System
CommonSystem Civil Works
CommonSystem Pump House Construction
CommonSystem Pump House Foundation CS2380
CommonSystem
CommonSystem
CommonSystem
CommonSystem

CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem Pump House Structure ConstruCS2400
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem Pump House Equipment FoundCS2800
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem Pump House HVAC ConstructCS2810
CommonSystem
CommonSystem
CommonSystem Water Supply & Sewage Treatment
CommonSystem Water Supply & Sewage TreatCS2880
CommonSystem
CommonSystem
CommonSystem
CommonSystem Water Supply & Sewage Treatm
CS2920
CommonSystem

CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem Fire Fighting Networks
CommonSystem Fire Fighting Networks ConstrCS2890
CommonSystem
CommonSystem
CommonSystem
CommonSystem CCTV
CommonSystem CCTV Equipment Foundation CS2900
C
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem
CommonSystem Installation
CommonSystem Pump House Equipment Installation
CommonSystem Pump House Equipment InstallCS2860
CommonSystem
CommonSystem
CommonSystem Pump House Fire Fighting SystCS2870
CommonSystem
CommonSystem
CommonSystem Water Supply & Sewage Treatment Equipment Installati
CommonSystem Water Supply & Sewage Treatm CS2930
CommonSystem
CommonSystem
CommonSystem CCTV
CommonSystem CCTV Installation CS2910
CommonSystem
CommonSystem
CommonSystem
CommonSystem
Overall Debugging

Into the Grid


Original
L4 Work Step Factor BL Start BL Finish
Duration

Substation 164 20/Jun/23 30/Nov/23

116 11/Jul/23 3/Nov/23


Civil Works 116 11/Jul/23 3/Nov/23
82 24/Jun/23 13/Sep/23
Cutting of substation soil 12 24/Jun/23 5/Jul/23
Imported loamy soil Backfill 15 29/Jul/23 12/Aug/23
Crushed stone 3 11/Sep/23 13/Sep/23
Garitry and Trenches 102 11/Jul/23 20/Oct/23
65 11/Jul/23 13/Sep/23
Excavation 7 15/Jul/23 21/Jul/23
Soil Bedding 15 29/Jul/23 12/Aug/23
Lean Concrete 15 12/Aug/23 26/Aug/23
Rebar 22 13/Aug/23 3/Sep/23
Form 21 14/Aug/23 3/Sep/23
Concrete 20 18/Aug/23 6/Sep/23
Water Proofing 20 22/Aug/23 10/Sep/23
Backfill 23 22/Aug/23 13/Sep/23
57 25/Aug/23 20/Oct/23
Excavation 7 25/Aug/23 31/Aug/23
Soil Bedding 10 1/Sep/23 10/Sep/23
Rebar 9 5/Sep/23 13/Sep/23
Form 5 10/Sep/23 14/Sep/23
Concrete 8 15/Sep/23 22/Sep/23
Water Proofing 3 23/Sep/23 25/Sep/23
Cover Plate Installation 6 15/Oct/23 20/Oct/23
Fence and Gate House 57 15/Aug/23 10/Oct/23
29 15/Aug/23 12/Sep/23
Excavation 7 15/Aug/23 21/Aug/23
Rebar 5 22/Aug/23 26/Aug/23
Form 8 25/Aug/23 1/Sep/23
Concrete 6 2/Sep/23 7/Sep/23
Water Proofing 2 9/Sep/23 10/Sep/23
Backfill 2 11/Sep/23 12/Sep/23
22 31/Aug/23 21/Sep/23
Steel mesh panels Installation 4 13/Sep/23 16/Sep/23
Barbed wire Installation 4 16/Sep/23 19/Sep/23
Gate Installation 3 19/Sep/23 21/Sep/23
18 3/Aug/23 20/Aug/23
Excavation 2 3/Aug/23 4/Aug/23
Soil Bedding 4 5/Aug/23 8/Aug/23
Lean Concrete 2 9/Aug/23 10/Aug/23
Form 5 11/Aug/23 15/Aug/23
Rebar 5 11/Aug/23 15/Aug/23
Concrete 1 16/Aug/23 16/Aug/23
Water Proofing 1 18/Aug/23 18/Aug/23
Backfill 2 19/Aug/23 20/Aug/23
31 21/Aug/23 20/Sep/23
Column & Beam Form 5 21/Aug/23 25/Aug/23
Column & Beam Rebar 4 21/Aug/23 24/Aug/23
Column & Beam Concrete 1 26/Aug/23 26/Aug/23
Roof Construction 2 29/Aug/23 30/Aug/23
Underground structures waterproofing 3 5/Sep/23 7/Sep/23
Wall Masonry 8 29/Aug/23 5/Sep/23
Gate and Windows Installation 3 30/Aug/23 1/Sep/23
Decoration 9 12/Sep/23 20/Sep/23
10 1/Oct/23 10/Oct/23
HVAC Equipment Installation 10 1/Oct/23 10/Oct/23
Road & Drainage 72 15/Sep/23 25/Nov/23
72 15/Sep/23 25/Nov/23
Excavation 6 15/Sep/23 20/Sep/23
Sand 11 20/Sep/23 30/Sep/23
Crushed stone 15 1/Oct/23 15/Oct/23
Asphalt 11 15/Nov/23 25/Nov/23
25 30/Aug/23 23/Sep/23
Excavation 15 30/Aug/23 13/Sep/23
Rebar 10 6/Sep/23 15/Sep/23
Concrete 1 16/Sep/23 16/Sep/23
Water Proofing 2 18/Sep/23 19/Sep/23
Backfill 2 21/Sep/23 22/Sep/23
Pipe PE 1 23/Sep/23 23/Sep/23
Earthing Net 84 25/Aug/23 16/Nov/23
84 25/Aug/23 16/Nov/23
Excavation 12 25/Aug/23 5/Sep/23
Ground conductor Laying 66 6/Sep/23 10/Nov/23
Ground conductor connection 66 11/Sep/23 15/Nov/23
Backfill 64 14/Sep/23 16/Nov/23
14 3/Nov/23 16/Nov/23
Earthing Connection 14 3/Nov/23 16/Nov/23
Control Building 129 24/Jun/23 30/Oct/23
Civil Works 119 24/Jun/23 20/Oct/23
Equipment Foundation 103 24/Jun/23 4/Oct/23
11 23/Aug/23 2/Sep/23
11 23/Aug/23 2/Sep/23
Form 3 23/Aug/23 25/Aug/23
Rebar 5 25/Aug/23 29/Aug/23
Concrete 1 30/Aug/23 30/Aug/23
Water Proofing 1 2/Sep/23 2/Sep/23
12 22/Aug/23 2/Sep/23
Form 4 22/Aug/23 25/Aug/23
Rebar 4 26/Aug/23 29/Aug/23
Concrete 1 30/Aug/23 30/Aug/23
Water Proofing 1 2/Sep/23 2/Sep/23
12 22/Aug/23 2/Sep/23
Form 4 22/Aug/23 25/Aug/23
Rebar 4 26/Aug/23 29/Aug/23
Concrete 1 30/Aug/23 30/Aug/23
Water Proofing 1 2/Sep/23 2/Sep/23
12 22/Aug/23 2/Sep/23
Form 4 22/Aug/23 25/Aug/23
Rebar 4 26/Aug/23 29/Aug/23
Concrete 1 30/Aug/23 30/Aug/23
Water Proofing 1 2/Sep/23 2/Sep/23
12 22/Aug/23 2/Sep/23
Form 4 22/Aug/23 25/Aug/23
Rebar 4 26/Aug/23 29/Aug/23
Concrete 1 30/Aug/23 30/Aug/23
Water Proofing 1 2/Sep/23 2/Sep/23
12 22/Aug/23 2/Sep/23
Form 4 22/Aug/23 25/Aug/23
Rebar 4 26/Aug/23 29/Aug/23
Concrete 1 30/Aug/23 30/Aug/23
Water Proofing 1 2/Sep/23 2/Sep/23
12 22/Aug/23 2/Sep/23
Form 4 22/Aug/23 25/Aug/23
Rebar 4 26/Aug/23 29/Aug/23
Concrete 1 30/Aug/23 30/Aug/23
Water Proofing 1 2/Sep/23 2/Sep/23
15 22/Aug/23 5/Sep/23
15 22/Aug/23 5/Sep/23
Excavation 4 22/Aug/23 25/Aug/23
Lean Concrete 1 25/Aug/23 25/Aug/23
Form 1 26/Aug/23 26/Aug/23
Rebar 4 27/Aug/23 30/Aug/23
Concrete 1 30/Aug/23 30/Aug/23
Water Proofing 1 2/Sep/23 2/Sep/23
Backfill 1 5/Sep/23 5/Sep/23
15 22/Aug/23 5/Sep/23
Excavation 4 22/Aug/23 25/Aug/23
Lean Concrete 1 25/Aug/23 25/Aug/23
Form 1 26/Aug/23 26/Aug/23
Rebar 4 27/Aug/23 30/Aug/23
Concrete 1 30/Aug/23 30/Aug/23
Water Proofing 1 2/Sep/23 2/Sep/23
Backfill 1 5/Sep/23 5/Sep/23
12 22/Aug/23 2/Sep/23
12 22/Aug/23 2/Sep/23
Form 4 22/Aug/23 25/Aug/23
Rebar 4 26/Aug/23 29/Aug/23
Concrete 1 30/Aug/23 30/Aug/23
Water Proofing 1 2/Sep/23 2/Sep/23
Building 124 24/Jun/23 25/Oct/23
63.25 24/Jun/23 25/Aug/23
Excavation 10 24/Jun/23 3/Jul/23
Bedding L1 4 4/Jul/23 7/Jul/23
Bedding L2 12 8/Jul/23 19/Jul/23
Bedding L3 2 20/Jul/23 21/Jul/23
Bedding L4 2 22/Jul/23 23/Jul/23
Bedding L5 2 24/Jul/23 25/Jul/23
Lean Concrete 3 24/Jul/23 26/Jul/23
Rebar Basement raft 8 27/Jul/23 3/Aug/23
Form work basemant raft 3 4/Aug/23 6/Aug/23
Cocnrete pouring Basement raft 1 8/Aug/23 8/Aug/23
Concrete curing , form dismantle & repairing Bas 1 10/Aug/23 10/Aug/23
Rebar isolated footings 7 2/Aug/23 8/Aug/23
Form work Isolated Footings 5 4/Aug/23 8/Aug/23
Cocnrete pouring Isolated Footings 1 9/Aug/23 9/Aug/23
Concrete curing , form dismantle & repairing
1 11/Aug/23 11/Aug/23
Isolated Footings
Rebar Basement walls & roof and grade beam 4 10/Aug/23 13/Aug/23
Form work Basement walls & roof and grade
4 12/Aug/23 15/Aug/23
beam
Cocnrete pouring Basement walls & roof and
1 16/Aug/23 16/Aug/23
grade beam
Concrete curing , form dismantle & repairing
2 18/Aug/23 19/Aug/23
Basement walls & roof and grade beam
Water Proofing 2 20/Aug/23 21/Aug/23
Backfill L1 1.25 22/Aug/23 22/Aug/23
Backfill L2 1.25 22/Aug/23 22/Aug/23
Backfill L3 1.25 23/Aug/23 23/Aug/23
Backfill L4 1.25 23/Aug/23 23/Aug/23
Backfill L5 1.25 24/Aug/23 24/Aug/23
Backfill L6 1.25 24/Aug/23 24/Aug/23
Backfill L7 1.25 25/Aug/23 25/Aug/23
Backfill L8 1.25 25/Aug/23 25/Aug/23
Backfill L9 1.25 26/Aug/23 26/Aug/23
25 12/Aug/23 5/Sep/23
Column & Beam Rebar 5 12/Aug/23 16/Aug/23
Column & Beam Form 6 16/Aug/23 21/Aug/23
Column & Beam Concrete 1 22/Aug/23 22/Aug/23
Wall masonary 12 25/Aug/23 5/Sep/23
19 2/Sep/23 20/Sep/23
Concrete joints between hollow slabs 4 2/Sep/23 5/Sep/23
Roof Construction 4 5/Sep/23 8/Sep/23
Roof drainage system 6 15/Sep/23 20/Sep/23
42 20/Sep/23 31/Oct/23
Cable Laying 41 20/Sep/23 30/Oct/23
Electrical Auxiliary Installation 17 15/Oct/23 31/Oct/23
27 5/Oct/23 31/Oct/23
Duct Installation 16 5/Oct/23 20/Oct/23
Internal Cassette Installation 2 21/Oct/23 22/Oct/23
Equipment Installation 2 23/Oct/23 24/Oct/23
Control Panel Installation 1 25/Oct/23 25/Oct/23
Conduit & Cable tray installation 6 26/Oct/23 31/Oct/23
Cabling HVAC 22 10/Oct/23 31/Oct/23
26 10/Sep/23 5/Oct/23
Insulation of external walls 16 10/Sep/23 25/Sep/23
Wall Finishes Construction 15 12/Sep/23 26/Sep/23
Gate & Windows Installation 4 7/Sep/23 10/Sep/23
Ceiling 18 18/Sep/23 5/Oct/23
Facades plastering and painting 16 20/Sep/23 5/Oct/23
12 5/Oct/23 16/Oct/23
Wall Finishes Construction 6 5/Oct/23 10/Oct/23
Floor Finishes Construction 6 10/Oct/23 15/Oct/23
Piping Work 2 15/Oct/23 16/Oct/23
9 17/Oct/23 25/Oct/23
Furniture Installation 2 17/Oct/23 18/Oct/23
Sanitary Ware Installation 7 19/Oct/23 25/Oct/23
Installation 67 26/Aug/23 31/Oct/23
Electrical Secondary System Installation 41 20/Sep/23 30/Oct/23
11 24/Sep/23 4/Oct/23
20 25/Oct/23 13/Nov/23
Control and protection panel installation 15 25/Oct/23 8/Nov/23
Secondary loop check and wiring 5 9/Nov/23 13/Nov/23
27 10/Oct/23 5/Nov/23
27 10/Oct/23 5/Nov/23
Panel base fabrication and installation 4 10/Oct/23 13/Oct/23
Panel (platform, box, cabinet) installation 4 14/Oct/23 17/Oct/23
Instrument and equipment installation on the pane 3 18/Oct/23 20/Oct/23
Monitoring equipment installation 2 21/Oct/23 22/Oct/23
Cable Tray(Support) Installation 11 17/Oct/23 27/Oct/23
Cable Laying 9 28/Oct/23 5/Nov/23
20 29/Sep/23 18/Oct/23
20 29/Sep/23 18/Oct/23
Wiring 4 29/Sep/23 2/Oct/23
Installation of control and display devices 3 2/Oct/23 4/Oct/23
Detector installation 10 5/Oct/23 14/Oct/23
Installation of other components 5 14/Oct/23 18/Oct/23
17 15/Oct/23 31/Oct/23
17 15/Oct/23 31/Oct/23
Meter Panel Erection 17 15/Oct/23 31/Oct/23
11 15/Oct/23 25/Oct/23
11 15/Oct/23 25/Oct/23
Control Power Supply and Changing Equipment Ins 6 15/Oct/23 20/Oct/23
Secondary loop check and wiring 5 21/Oct/23 25/Oct/23
11 15/Oct/23 25/Oct/23
Battery installation 6 15/Oct/23 20/Oct/23
Battery charging and discharging trial run 5 21/Oct/23 25/Oct/23
6 15/Oct/23 20/Oct/23
UPS Power Erection 4 15/Oct/23 18/Oct/23
UPS device inspection and load test 2 19/Oct/23 20/Oct/23
44 15/Oct/23 27/Nov/23
44 15/Oct/23 27/Nov/23
Inverter installation 37 15/Oct/23 20/Nov/23
Insulation Resistance Test 7 21/Nov/23 27/Nov/23
14 15/Oct/23 28/Oct/23
14 15/Oct/23 28/Oct/23
Control & protection and automation screen instal 4 15/Oct/23 18/Oct/23
DC panel and UPS Installation 2 19/Oct/23 20/Oct/23
Secondary loop check and wiring 8 21/Oct/23 28/Oct/23
51 10/Sep/23 30/Oct/23
23 34 25/Sep/23 28/Oct/23
14 34 25/Sep/23 28/Oct/23
Communication System primary equipment Installation 24 25/Sep/23 18/Oct/23
Microwave communication equipment installation 20 1/Oct/23 20/Oct/23
Communication battery installation 8 21/Oct/23 28/Oct/23
Communication system Earthing 8 21/Oct/23 28/Oct/23
14 24 25/Sep/23 18/Oct/23
ABX System Erection 24 25/Sep/23 18/Oct/23
14 24 25/Sep/23 18/Oct/23
anel Installation 24 25/Sep/23 18/Oct/23
8 21/Oct/23 28/Oct/23
5 51 10/Sep/23 30/Oct/23
51 10/Sep/23 30/Oct/23
Rack Mounting 11 10/Sep/23 20/Sep/23
Communication Equipment Installation 30 21/Sep/23 20/Oct/23
Optical Cable Laying 30 1/Oct/23 30/Oct/23
Auxiliary System 15 6/Oct/23 20/Oct/23
10 11/Oct/23 20/Oct/23
Diesel generator Erection 10 11/Oct/23 20/Oct/23
5 6/Oct/23 10/Oct/23
Equipment Installation 5 6/Oct/23 10/Oct/23
15 10/Oct/23 24/Oct/23
Control Cabinet and Terminal Box Installation 15 10/Oct/23 24/Oct/23
Secondary loop check and wiring 15 10/Oct/23 24/Oct/23
Trial Operation 1 24/Oct/23 24/Oct/23
Cable Laying & Connection 61 26/Aug/23 25/Oct/23
15 11/Oct/23 25/Oct/23
15 11/Oct/23 25/Oct/23
Cable Laying 15 11/Oct/23 25/Oct/23
10 21/Oct/23 30/Oct/23
Cable head making 5 21/Oct/23 25/Oct/23
Cable Connection 6 25/Oct/23 30/Oct/23
15 1/Oct/23 15/Oct/23
15 1/Oct/23 15/Oct/23
Cable Laying 15 1/Oct/23 15/Oct/23
5 11/Oct/23 15/Oct/23
Cable head making 4 11/Oct/23 14/Oct/23
Cable Connection 1 15/Oct/23 15/Oct/23
52 31/Aug/23 21/Oct/23
26 31/Aug/23 25/Sep/23
Cable Laying 26 31/Aug/23 25/Sep/23
9 13/Oct/23 21/Oct/23
Cable head making 4 13/Oct/23 16/Oct/23
Cable Connection 1 17/Oct/23 17/Oct/23
39 9/Sep/23 17/Oct/23
31 9/Sep/23 9/Oct/23
Cable Laying 31 9/Sep/23 9/Oct/23
9 9/Oct/23 17/Oct/23
Cable head making 4 9/Oct/23 12/Oct/23
Cable Connection 1 13/Oct/23 13/Oct/23
35KV GIS 10 18/Oct/23 27/Oct/23
10 18/Oct/23 27/Oct/23
Panel Foundation Installation 2 18/Oct/23 19/Oct/23
GIS Erection 4 20/Oct/23 23/Oct/23
Corollary Equipment 2 24/Oct/23 25/Oct/23
Secondary loop check and wiring 2 26/Oct/23 27/Oct/23
10 18/Oct/23 27/Oct/23
Panel Foundation Installation 2 18/Oct/23 19/Oct/23
GIS Erection 4 20/Oct/23 23/Oct/23
Corollary Equipment 2 24/Oct/23 25/Oct/23
Secondary loop check and wiring 2 26/Oct/23 27/Oct/23
Bus Bar 22 3/Oct/23 24/Oct/23
7 18/Oct/23 24/Oct/23
Panel Foundation Installation 2 18/Oct/23 19/Oct/23
GIS Erection 4 20/Oct/23 23/Oct/23
Corollary Equipment 2 24/Oct/23 25/Oct/23
Secondary loop check and wiring 2 26/Oct/23 27/Oct/23
13 3/Oct/23 15/Oct/23
Gantry Installation 2 3/Oct/23 4/Oct/23
Drivepipe Installation 19 5/Oct/23 23/Oct/23
Supporting Insulator Installation 2 24/Oct/23 25/Oct/23
Down conductor and wire jumper 2 26/Oct/23 27/Oct/23
Lighting (Control Building) 21 11/Oct/23 31/Oct/23
21 11/Oct/23 31/Oct/23
Pipeline laying 2 11/Oct/23 12/Oct/23
Conductor Arrangement 11 13/Oct/23 23/Oct/23
Lighting Distribution Box 2 24/Oct/23 25/Oct/23
Lighting Fixture 2 26/Oct/23 27/Oct/23
400V Panel 15 1/Oct/23 15/Oct/23
15 1/Oct/23 15/Oct/23
400V Panel Installation 15 1/Oct/23 15/Oct/23
220kV Switchyard 112 15/Jul/23 3/Nov/23
Civil Works 64 15/Jul/23 16/Sep/23
Power Transformer Foundation 66 15/Jul/23 18/Sep/23
59 22/Jul/23 18/Sep/23
Excavation 4 22/Jul/23 25/Jul/23
Backfill L1 1 6/Aug/23 6/Aug/23
Backfill L2 1 7/Aug/23 7/Aug/23
Backfill L3 1 8/Aug/23 8/Aug/23
Backfill L4 1 9/Aug/23 9/Aug/23
Lean Concrete 6 10/Aug/23 15/Aug/23
Rebar 20 12/Aug/23 31/Aug/23
form 20 14/Aug/23 2/Sep/23
Concrete 13 25/Aug/23 6/Sep/23
Water Proofing 2 9/Sep/23 10/Sep/23
Backfill L1 1 10/Sep/23 10/Sep/23
Backfill L2 1 11/Sep/23 11/Sep/23
Backfill L3 1 12/Sep/23 12/Sep/23
Backfill L4 1 13/Sep/23 13/Sep/23
Backfill L5 1 14/Sep/23 14/Sep/23
Backfill L6 1 15/Sep/23 15/Sep/23
Backfill L7 1 16/Sep/23 16/Sep/23
Backfill L8 1 17/Sep/23 17/Sep/23
Backfill L9 1 18/Sep/23 18/Sep/23
28 22/Aug/23 18/Sep/23
Excavation -27 22/Aug/23 25/Jul/23
Backfill L1 1 6/Aug/23 6/Aug/23
Backfill L2 1 7/Aug/23 7/Aug/23
Backfill L3 1 8/Aug/23 8/Aug/23
Backfill L4 1 9/Aug/23 9/Aug/23
Lean Concrete 6 10/Aug/23 15/Aug/23
Form 20 12/Aug/23 31/Aug/23
Rebar 20 14/Aug/23 2/Sep/23
Concrete 13 25/Aug/23 6/Sep/23
Water Proofing 2 9/Sep/23 10/Sep/23
Backfill L1 1 10/Sep/23 10/Sep/23
Backfill L2 1 11/Sep/23 11/Sep/23
Backfill L3 1 12/Sep/23 12/Sep/23
Backfill L4 1 13/Sep/23 13/Sep/23
Backfill L5 1 14/Sep/23 14/Sep/23
Backfill L6 1 15/Sep/23 15/Sep/23
Backfill L7 1 16/Sep/23 16/Sep/23
Backfill L8 1 17/Sep/23 17/Sep/23
Backfill L9 1 18/Sep/23 18/Sep/23
38 30/Aug/23 6/Oct/23
Excavation 1 30/Aug/23 30/Aug/23
Backfill L1 1 31/Aug/23 31/Aug/23
Backfill L2 1 1/Sep/23 1/Sep/23
Backfill L3 1 2/Sep/23 2/Sep/23
Backfill L4 1 3/Sep/23 3/Sep/23
Lean Concrete 1 5/Sep/23 5/Sep/23
Form 14 6/Sep/23 19/Sep/23
Rebar 12 7/Sep/23 18/Sep/23
Concrete 3 20/Sep/23 22/Sep/23
Water Proofing 2 25/Sep/23 26/Sep/23
Backfill L1 1 28/Sep/23 28/Sep/23
Backfill L2 1 29/Sep/23 29/Sep/23
Backfill L3 1 30/Sep/23 30/Sep/23
Backfill L4 1 1/Oct/23 1/Oct/23
Backfill L5 1 2/Oct/23 2/Oct/23
Backfill L6 1 3/Oct/23 3/Oct/23
Backfill L7 1 4/Oct/23 4/Oct/23
Backfill L8 1 5/Oct/23 5/Oct/23
Backfill L9 1 6/Oct/23 6/Oct/23
Equipment Supports & Foundation 81 15/Jul/23 3/Oct/23
36 29/Aug/23 3/Oct/23
Excavation 1 29/Aug/23 29/Aug/23
Backfill L1 2 30/Aug/23 31/Aug/23
Backfill L2 2 1/Sep/23 2/Sep/23
Backfill L3 2 3/Sep/23 4/Sep/23
Backfill L4 2 5/Sep/23 6/Sep/23
Lean Concrete 1 6/Sep/23 6/Sep/23
Form 13 7/Sep/23 19/Sep/23
Rebar 12 7/Sep/23 18/Sep/23
Concrete 1 20/Sep/23 20/Sep/23
Water Proofing 2 23/Sep/23 24/Sep/23
Backfill L1 1 25/Sep/23 25/Sep/23
Backfill L2 1 26/Sep/23 26/Sep/23
Backfill L3 1 27/Sep/23 27/Sep/23
Backfill L4 1 28/Sep/23 28/Sep/23
Backfill L5 1 29/Sep/23 29/Sep/23
Backfill L6 1 30/Sep/23 30/Sep/23
Backfill L7 1 1/Oct/23 1/Oct/23
Backfill L8 1 2/Oct/23 2/Oct/23
Backfill L9 1 3/Oct/23 3/Oct/23
36 29/Aug/23 3/Oct/23
Excavation 1 29/Aug/23 29/Aug/23
Backfill L1 2 30/Aug/23 31/Aug/23
Backfill L2 2 1/Sep/23 2/Sep/23
Backfill L3 2 3/Sep/23 4/Sep/23
Backfill L4 2 5/Sep/23 6/Sep/23
Lean Concrete 1 6/Sep/23 6/Sep/23
Form 13 7/Sep/23 19/Sep/23
Rebar 12 7/Sep/23 18/Sep/23
Concrete 1 20/Sep/23 20/Sep/23
Water Proofing 2 23/Sep/23 24/Sep/23
Backfill L1 1 25/Sep/23 25/Sep/23
Backfill L2 1 26/Sep/23 26/Sep/23
Backfill L3 1 27/Sep/23 27/Sep/23
Backfill L4 1 28/Sep/23 28/Sep/23
Backfill L5 1 29/Sep/23 29/Sep/23
Backfill L6 1 30/Sep/23 30/Sep/23
Backfill L7 1 1/Oct/23 1/Oct/23
Backfill L8 1 2/Oct/23 2/Oct/23
Backfill L9 1 3/Oct/23 3/Oct/23
65 15/Jul/23 17/Sep/23
Excavation 11 15/Jul/23 25/Jul/23
Backfill L1 3 29/Jul/23 31/Jul/23
Backfill L2 3 1/Aug/23 3/Aug/23
Backfill L3 3 4/Aug/23 6/Aug/23
Backfill L4 3 7/Aug/23 9/Aug/23
Backfill L5 3 10/Aug/23 12/Aug/23
Lean Concrete 1 13/Aug/23 13/Aug/23
Form 21 14/Aug/23 3/Sep/23
Rebar 20 14/Aug/23 2/Sep/23
Concrete 20 18/Aug/23 6/Sep/23
Water Proofing 2 9/Sep/23 10/Sep/23
Backfill L1 1 11/Sep/23 11/Sep/23
Backfill L2 1 12/Sep/23 12/Sep/23
Backfill L3 1 13/Sep/23 13/Sep/23
Backfill L4 1 14/Sep/23 14/Sep/23
Backfill L5 1 15/Sep/23 15/Sep/23
Backfill L6 1 16/Sep/23 16/Sep/23
Backfill L7 1 17/Sep/23 17/Sep/23
65 15/Jul/23 17/Sep/23
Excavation 11 15/Jul/23 25/Jul/23
Backfill L1 3 29/Jul/23 31/Jul/23
Backfill L2 3 1/Aug/23 3/Aug/23
Backfill L3 3 4/Aug/23 6/Aug/23
Backfill L4 3 7/Aug/23 9/Aug/23
Backfill L5 3 10/Aug/23 12/Aug/23
Lean Concrete 1 13/Aug/23 13/Aug/23
Form 21 14/Aug/23 3/Sep/23
Rebar 20 14/Aug/23 2/Sep/23
Concrete 20 18/Aug/23 6/Sep/23
Water Proofing 2 9/Sep/23 10/Sep/23
Backfill L1 1 11/Sep/23 11/Sep/23
Backfill L2 1 12/Sep/23 12/Sep/23
Backfill L3 1 13/Sep/23 13/Sep/23
Backfill L4 1 14/Sep/23 14/Sep/23
Backfill L5 1 15/Sep/23 15/Sep/23
Backfill L6 1 16/Sep/23 16/Sep/23
Backfill L7 1 17/Sep/23 17/Sep/23
78 15/Jul/23 30/Sep/23
Excavation 11 15/Jul/23 25/Jul/23
Backfill L1 3 29/Jul/23 31/Jul/23
Backfill L2 3 1/Aug/23 3/Aug/23
Backfill L3 3 4/Aug/23 6/Aug/23
Backfill L4 3 7/Aug/23 9/Aug/23
Backfill L5 3 10/Aug/23 12/Aug/23
Lean Concrete 1 13/Aug/23 13/Aug/23
Form 21 14/Aug/23 3/Sep/23
Rebar 20 14/Aug/23 2/Sep/23
Concrete 20 18/Aug/23 6/Sep/23
Water Proofing 2 9/Sep/23 10/Sep/23
Backfill L1 1 11/Sep/23 11/Sep/23
Backfill L2 1 12/Sep/23 12/Sep/23
Backfill L3 1 13/Sep/23 13/Sep/23
Backfill L4 1 14/Sep/23 14/Sep/23
Backfill L5 1 15/Sep/23 15/Sep/23
Backfill L6 1 16/Sep/23 16/Sep/23
Backfill L7 1 17/Sep/23 17/Sep/23
Steel Structure Erection 12 19/Sep/23 30/Sep/23
78 15/Jul/23 30/Sep/23
Excavation 11 15/Jul/23 25/Jul/23
Backfill L1 3 29/Jul/23 31/Jul/23
Backfill L2 3 1/Aug/23 3/Aug/23
Backfill L3 3 4/Aug/23 6/Aug/23
Backfill L4 3 7/Aug/23 9/Aug/23
Backfill L5 3 10/Aug/23 12/Aug/23
Lean Concrete 1 13/Aug/23 13/Aug/23
Form 21 14/Aug/23 3/Sep/23
Rebar 20 14/Aug/23 2/Sep/23
Concrete 20 18/Aug/23 6/Sep/23
Backfill L1 1 7/Sep/23 7/Sep/23
Backfill L2 1 8/Sep/23 8/Sep/23
Backfill L3 1 9/Sep/23 9/Sep/23
Backfill L4 1 10/Sep/23 10/Sep/23
Backfill L5 1 11/Sep/23 11/Sep/23
Backfill L6 1 12/Sep/23 12/Sep/23
Backfill L7 1 13/Sep/23 13/Sep/23
Steel Structure Erection 16 15/Sep/23 30/Sep/23
78 15/Jul/23 30/Sep/23
Excavation 11 15/Jul/23 25/Jul/23
Backfill L1 3 29/Jul/23 31/Jul/23
Backfill L2 3 1/Aug/23 3/Aug/23
Backfill L3 3 4/Aug/23 6/Aug/23
Backfill L4 3 7/Aug/23 9/Aug/23
Backfill L5 3 10/Aug/23 12/Aug/23
Lean Concrete 1 13/Aug/23 13/Aug/23
Form 21 14/Aug/23 3/Sep/23
Rebar 20 14/Aug/23 2/Sep/23
Concrete 20 18/Aug/23 6/Sep/23
Backfill L1 1 7/Sep/23 7/Sep/23
Backfill L2 1 8/Sep/23 8/Sep/23
Backfill L3 1 9/Sep/23 9/Sep/23
Backfill L4 1 10/Sep/23 10/Sep/23
Backfill L5 1 11/Sep/23 11/Sep/23
Backfill L6 1 12/Sep/23 12/Sep/23
Backfill L7 1 13/Sep/23 13/Sep/23
Steel Structure Erection 16 15/Sep/23 30/Sep/23
78 15/Jul/23 30/Sep/23
Excavation 11 15/Jul/23 25/Jul/23
Backfill L1 3 29/Jul/23 31/Jul/23
Backfill L2 3 1/Aug/23 3/Aug/23
Backfill L3 3 4/Aug/23 6/Aug/23
Backfill L4 3 7/Aug/23 9/Aug/23
Backfill L5 3 10/Aug/23 12/Aug/23
Lean Concrete 1 13/Aug/23 13/Aug/23
Form 21 14/Aug/23 3/Sep/23
Rebar 20 14/Aug/23 2/Sep/23
Concrete 20 18/Aug/23 6/Sep/23
Backfill L1 1 7/Sep/23 7/Sep/23
Backfill L2 1 8/Sep/23 8/Sep/23
Backfill L3 1 9/Sep/23 9/Sep/23
Backfill L4 1 10/Sep/23 10/Sep/23
Backfill L5 1 11/Sep/23 11/Sep/23
Backfill L6 1 12/Sep/23 12/Sep/23
Backfill L7 1 13/Sep/23 13/Sep/23
Steel Structure Erection 16 15/Sep/23 30/Sep/23
Installation 27 7/Oct/23 2/Nov/23
Main Transformer Installation 27 7/Oct/23 2/Nov/23
7 7/Oct/23 13/Oct/23
Positioning 7 7/Oct/23 13/Oct/23
20 14/Oct/23 2/Nov/23
Transformer body installation 8 14/Oct/23 21/Oct/23
Transformer inspection 1 22/Oct/23 22/Oct/23
Installation of Transformer Accessories 4 27/Oct/23 30/Oct/23
Oil Filling and Sealing Test of Transformer 2 31/Oct/23 1/Nov/23
Integral Inspection 1 2/Nov/23 2/Nov/23
7 7/Oct/23 13/Oct/23
Positioning 7 7/Oct/23 13/Oct/23
20 14/Oct/23 2/Nov/23
Transformer body installation 8 14/Oct/23 21/Oct/23
Transformer inspection 1 22/Oct/23 22/Oct/23
Installation of Transformer Accessories 4 27/Oct/23 30/Oct/23
Oil Filling and Sealing Test of Transformer 2 31/Oct/23 1/Nov/23
Integral Inspection 1 2/Nov/23 2/Nov/23
220kV AIS Installation 18 17/Oct/23 3/Nov/23
18 17/Oct/23 3/Nov/23
5 17/Oct/23 21/Oct/23
Erection 5 17/Oct/23 21/Oct/23
3 22/Oct/23 24/Oct/23
Erection 3 22/Oct/23 24/Oct/23
3 25/Oct/23 27/Oct/23
Erection 3 25/Oct/23 27/Oct/23
7 28/Oct/23 3/Nov/23
Erection 7 28/Oct/23 3/Nov/23
18 17/Oct/23 3/Nov/23
5 17/Oct/23 21/Oct/23
Erection 5 17/Oct/23 21/Oct/23
3 22/Oct/23 24/Oct/23
Erection 3 22/Oct/23 24/Oct/23
3 25/Oct/23 27/Oct/23
Erection 3 25/Oct/23 27/Oct/23
7 28/Oct/23 3/Nov/23
Erection 7 28/Oct/23 3/Nov/23
Accessories 13 19/Oct/23 31/Oct/23
3 19/Oct/23 21/Oct/23
Erection 3 19/Oct/23 21/Oct/23
3 19/Oct/23 21/Oct/23
Erection 3 19/Oct/23 21/Oct/23
16 16/Oct/23 31/Oct/23
Installation 16 16/Oct/23 31/Oct/23
Service Transformer 22 11/Oct/23 1/Nov/23
22 11/Oct/23 1/Nov/23
Positioning 2 11/Oct/23 12/Oct/23
Transformer body installation 8 13/Oct/23 20/Oct/23
Transformer inspection 1 21/Oct/23 21/Oct/23
Installation of Transformer Accessories 4 26/Oct/23 29/Oct/23
Oil Filling and Sealing Test of Transformer 2 30/Oct/23 31/Oct/23
Integral Inspection 1 1/Nov/23 1/Nov/23
22 11/Oct/23 1/Nov/23
Positioning 2 11/Oct/23 12/Oct/23
Transformer body installation 8 13/Oct/23 20/Oct/23
Transformer inspection 1 21/Oct/23 21/Oct/23
Installation of Transformer Accessories 4 26/Oct/23 29/Oct/23
Oil Filling and Sealing Test of Transformer 2 30/Oct/23 31/Oct/23
Integral Inspection 1 1/Nov/23 1/Nov/23
Power Cables and Control Cables Installation 15 18/Oct/23 1/Nov/23
15 18/Oct/23 1/Nov/23
Cable Laying 4 18/Oct/23 21/Oct/23
Cable head making 4 22/Oct/23 25/Oct/23
Cable Connection 7 26/Oct/23 1/Nov/23
Common System 35 29/Sep/23 2/Nov/23
Civil Works 17 29/Sep/23 15/Oct/23
Pump House Construction 87 21/Jul/23 15/Oct/23
69 21/Jul/23 27/Sep/23
Artesian well with pump house 27 4/Aug/23 30/Aug/23
Drilling of Artesian well (Indoor) 4 4/Aug/23 7/Aug/23
Drilling of Artesian well (Outdoar) 4 8/Aug/23 11/Aug/23
Excavation 2 4/Aug/23 5/Aug/23
Soil Bedding 6 10/Aug/23 15/Aug/23
Lean Concrete 1 16/Aug/23 16/Aug/23
Form 4 17/Aug/23 20/Aug/23
Rebar 4 17/Aug/23 20/Aug/23
Concrete 1 21/Aug/23 21/Aug/23
Water Proofing 2 24/Aug/23 25/Aug/23
Backfill 4 27/Aug/23 30/Aug/23
Fire Fighting Pump House 27 4/Aug/23 30/Aug/23
Excavation 2 4/Aug/23 5/Aug/23
Soil Bedding 6 10/Aug/23 15/Aug/23
Lean Concrete 1 16/Aug/23 16/Aug/23
Form 4 17/Aug/23 20/Aug/23
Rebar 4 17/Aug/23 20/Aug/23
Concrete 1 21/Aug/23 21/Aug/23
Water Proofing 2 24/Aug/23 25/Aug/23
Backfill 4 27/Aug/23 30/Aug/23
29 30/Aug/23 27/Sep/23
Artesian well with pump house 29 30/Aug/23 27/Sep/23
Column & Beam Form 4 30/Aug/23 2/Sep/23
Column & Beam Rebar 4 3/Sep/23 6/Sep/23
Column & Beam Concrete 1 7/Sep/23 7/Sep/23
Underground structures waterproofing 1 10/Sep/23 10/Sep/23
Wall Masonry 16 8/Sep/23 23/Sep/23
Steel Structure Erection 6 24/Sep/23 29/Sep/23
Roof Construction 4 9/Sep/23 12/Sep/23
Roof drainage system 2 13/Sep/23 14/Sep/23
Wall Masonry 6 15/Sep/23 20/Sep/23
Gate and Windows Installation 2 21/Sep/23 22/Sep/23
Decoration 1 27/Sep/23 27/Sep/23
Fire Fighting Pump House 29 30/Aug/23 27/Sep/23
Column & Beam Form 4 30/Aug/23 2/Sep/23
Column & Beam Rebar 4 3/Sep/23 6/Sep/23
Column & Beam Concrete 1 7/Sep/23 7/Sep/23
Underground structures waterproofing 1 10/Sep/23 10/Sep/23
Wall Masonry 16 8/Sep/23 23/Sep/23
Steel Structure Erection 6 24/Sep/23 29/Sep/23
Roof Construction 4 9/Sep/23 12/Sep/23
Roof drainage system 2 13/Sep/23 14/Sep/23
Wall Masonry 6 15/Sep/23 20/Sep/23
Gate and Windows Installation 2 21/Sep/23 22/Sep/23
Decoration 1 27/Sep/23 27/Sep/23
31 15/Sep/23 15/Oct/23
Artesian well with pump house 16 30/Sep/23 15/Oct/23
Excavation 1 30/Sep/23 30/Sep/23
Lean Concrete 1 1/Oct/23 1/Oct/23
Form 3 2/Oct/23 4/Oct/23
Rebar 4 5/Oct/23 8/Oct/23
Concrete 1 9/Oct/23 9/Oct/23
Water Proofing 1 12/Oct/23 12/Oct/23
Backfill 1 15/Oct/23 15/Oct/23
Fire Fighting Pump House 16 30/Sep/23 15/Oct/23
Excavation 1 30/Sep/23 30/Sep/23
Lean Concrete 1 1/Oct/23 1/Oct/23
Form 3 2/Oct/23 4/Oct/23
Rebar 4 5/Oct/23 8/Oct/23
Concrete 1 9/Oct/23 9/Oct/23
Water Proofing 1 12/Oct/23 12/Oct/23
Backfill 1 15/Oct/23 15/Oct/23
6 15/Sep/23 20/Sep/23
Artesian well with pump house HVAC Installatio 4 15/Sep/23 18/Sep/23
Fire Fighting Pump House HVAC Installation 1 20/Sep/23 20/Sep/23
Water Supply & Sewage Treatment -10 29/Sep/23 18/Sep/23
20 30/Aug/23 18/Sep/23
Excavation 15 30/Aug/23 13/Sep/23
Piping Work 11 5/Sep/23 15/Sep/23
Backfill 3 16/Sep/23 18/Sep/23
26 29/Sep/23 24/Oct/23
Excavation 22 29/Sep/23 20/Oct/23
backfill 3 30/Sep/23 2/Oct/23
Lean Concrete 1 3/Oct/23 3/Oct/23
Form 6 4/Oct/23 9/Oct/23
Rebar 5 10/Oct/23 14/Oct/23
Concrete 1 15/Oct/23 15/Oct/23
Concrete surfaces oil-resistant coating 1 18/Oct/23 18/Oct/23
Water Proofing 1 21/Oct/23 21/Oct/23
Backfill 1 24/Oct/23 24/Oct/23
Fire Fighting Networks 20 19/Oct/23 7/Nov/23
20 19/Oct/23 7/Nov/23
Excavation 9 19/Oct/23 27/Oct/23
Piping Work 9 28/Oct/23 5/Nov/23
Backfill 2 6/Nov/23 7/Nov/23
CCTV 17 3/Nov/23 19/Nov/23
17 3/Nov/23 19/Nov/23
Excavation 4 3/Nov/23 6/Nov/23
Lean Concrete 1 4/Nov/23 4/Nov/23
Form 4 5/Nov/23 8/Nov/23
Rebar 4 9/Nov/23 12/Nov/23
Concrete 1 13/Nov/23 13/Nov/23
Water Proofing 1 16/Nov/23 16/Nov/23
Backfill 2 18/Nov/23 19/Nov/23
Installation 47 17/Sep/23 2/Nov/23
Pump House Equipment Installation 35 29/Sep/23 2/Nov/23
30 29/Sep/23 28/Oct/23
Artesian well Pump Installation 30 29/Sep/23 28/Oct/23
Fire Fighting Pump Installation 30 29/Sep/23 28/Oct/23
15 19/Oct/23 2/Nov/23
Artesian well Pump Installation 15 19/Oct/23 2/Nov/23
Fire Fighting Pump Installation 15 19/Oct/23 2/Nov/23
Water Supply & Sewage Treatment Equipment Installati 16 4/Oct/23 19/Oct/23
30 29/Sep/23 28/Oct/23
Positioning 1 29/Sep/23 29/Sep/23
Erection 29 30/Sep/23 28/Oct/23
CCTV 5 17/Sep/23 21/Sep/23
5 17/Sep/23 21/Sep/23
Infrared thermal camera Installation 2 17/Sep/23 18/Sep/23
Infrared HD high speed dome Installation 2 19/Sep/23 20/Sep/23
CCTV master station system Installation 2 21/Sep/23 22/Sep/23
Other Accessories Installation 1 23/Sep/23 23/Sep/23
51 10/Oct/23 29/Nov/23
Instrument calibration (including oil samples,
32 10/Oct/23 10/Nov/23
gas detection, gate meters, density relays, etc.)
Subsystem debugging 7 1/Nov/23 7/Nov/23
Sign signage installation 11 20/Oct/23 30/Oct/23
Communication and automatic debugging 10 8/Nov/23 17/Nov/23
All station joint debugging 7 18/Nov/23 24/Nov/23
Acceptance (before grid connection) 1 25/Nov/23 25/Nov/23
Eliminate defects 4 26/Nov/23 29/Nov/23
1 30/Nov/23 30/Nov/23