Failure Analysis Report Date: 25/10/2023

Subject:
Analysis of failure of bearing of Mill Stand – Line3 C8 Drive Side TOP 24032
K30 MBW33C3

Dear Sir,
We have carried out an investigation of the above failed bearing and our
“Failure Analysis Report” is enclosed.
Kindly note many reasons could have attributed to this bearing failure. The
report is based solely on visual inspection. We have tabulated the findings to
the best of our knowledge and based on the information available to us. All are
to be evaluated and systematically eliminated.
We hope these inferences will help you in improving bearing performance.
In case, you have any further queries please feel free to get in touch with us
again.
Thanking you and assuring you of our best attention always, we remain,

Yours faithfully,
SHUBHAM SINGH
MachFox India Limited.
PRELIMINARY BEARING FAILURE REPORT
CLIENT: - RADHA SMELTERS PVT LTD.
REPORT NO.: - MachFox/Ref/TMT/OCT/02 DATE OF SUBMISSION 31-10-2023

MODE OF FAILURE: - Online


REASON OF FAILURE LACKS OF LUBRICATION.

MILL OUT DATE 30-10-2023 OBSERVATION DATE 31-10-2023

MILL TYPE 2 HI STAND NO. L3 CONTINIOUS - 8

BEARING TYPE SRB BEARING NO. 24032 K30 MBW33 C3

BEARING MAKE ARB BEARING SERIAL NO. NA (Old Assembled bearing)

BEARING INSTALLATION DATE 30-03-2023 CHOCK NO. N/A


NO. OF ROLLING
CHOCK POSITION Drive Top 2592 hrs
HOURS

 Observation: -

 Heavy Crack Found in inner ring.

 Rolling Element position Found Axial Play Marks.

 Lubricant Totally Burned.

 Rolling Element Found Damaged.

 Cage Found Damaged.

 Ovality Found in chock 200microns

1
Bearing Outerace ,Roll neck & Chock :-

2
Bearing Snaps :-

POSSIBLE REASONS OF FAILRUES:-


 Observation and nature of failure it noticed that lack of lubrication &
Ovality founded in chocks.

PREVENTIVE ACTIONS:-

3
 Maintain bearing seating size as per drawing.
 Maintain chock bore dimension zero to plus 20 micros.
 Use Coper and brass tools for bearing mounting.
 Ensure proper bearing clearance as pe OEM for respective bearings.

GENERAL RECOMMENDATIONS: -
 Lubricate bearing till grease purging.
 Ensure all dimensions of chocks should be checked.
 Ensure misalignment.
 Ensure vibration.
 Ensure lubrication