You are on page 1of 7

Project Name:

Document Title Date 03-NOV-22

Document No Rev. No. 0

INSPECTION AND TEST PLAN


FOR GRP WATER TANK

Project :

Employer :

Project Design & Construction


Supervision Service Consultant:

Main Contractor :

Revision History

Issued for
LPS-01-HTI-ITP-ME-007 0 Review and
Approval
Rev. Purpose of Rev. by Appr. By Project
Doc. no. no. Date Submission Prep. By QA/QC Manager Manager

23 |29
Project Name:

Document Title Date


03-NOV-22
Document No Rev. No. 0

Legend: H=Hold Point, WIR to be issued and work shall not proceed without acceptance from the responsible party; W=Witness Point- WIR to be issued and work may proceed if the
responsible party does not attend; S=random surveillance, no signature or IRW required; R=“Record/ Document Review”(submitted separately as necessary);TRR=Test Report Review
Checks Intervention Points Verification
Documents
Control Documents Acceptance Criteria/

Contract
Contract

3rd Party
# Works Checking Vol. Clause Tolerances (if applicable) Responsible Required

QDC/
Sub-
Activity to be Job Function Frequency
Performed
1.0 Preliminary Activities of Documents & Approval
1.1 Project QCS-2014 & - Permit should be signed from Site Engineer / Initial H H W N/A Signed/
Permits Project
Engineer/ all Safety Departments Safety Engineer Approved
Safety Specification Permits
Engineer
1.2 Project QCS-2014 & - - All materials shall be Site Engineer Prior Material H H W N/A Approved later
Approval of Project Purchase and
Engineer/ QC submitted for approval in Material
Material Specification Delivery.
Engineer accordance with the Submittals
Submittal
specifications and tender
drawings.

1.3 Project QCS-2014 & - As per Document latest Initial H H W N/A Shop Drawings
Shop Drawings Project
Engineer revision Approval status from Site Engineer Submittal
Approval Specification Engineer Documents

1.4 Project QCS-2014 & - As per Document latest Project Initial H H W N/A Approved
Method Project
Engineer/ QC revision Approval status from Engineer/ QC Latest Method
Statement Specification
Engineer Engineer Engineer Statement
Submittal
2.0 Pre-Installation Activities

24 | 2 9
2.1 Delivery Notes The QC will Section Visual Inspection/ Delivery Store-in- Upon Material H H W N/A Material
Material
& Batch check the 26 storage and handling as per Charge / Delivery Inspection
Delivery
Certificates material Manufacturer’s Instructions QC Engineer Request (MIR)
Inspection
according to
project
specification
3.0 Installation and Inspection Activities
3.1 As per QCS-2014 & QCS 2014 Water storage tanks shall be Project After Installation H H W N/A WIR shall be
GRP sectional Project
Approved manufactured to British Engineer /QA- raised.
water tank - Specification
method Standards and comply strictly QC Engineer Subcontractor
Materials Approved Shop
statement and Drawing with the Water Department’s Inspection
approved shop Regulations of the State of
drawing Qatar.
Inspection GRP sectional water tank
Checklist insulated with rigid
polyurethane foam complete
with bolted inspection cover
and with gunmetal pipe
connections pre-molded in
positions.
The tank shall be suitable for
ultra violet light and comply
with the National Water
Council of the United Kingdom.
3.2 As per QCS-2014 & QCS 2014 Tank is to be fixed on a base, Project After Installation H H W N/A WIR shall be
Tank Base Project
Approved which support the whole of the Engineer /QA- raised.
Support Specification
method tank. QC Engineer Subcontractor
Approved Shop
statement and Drawing
Inspection
approved shop The details of the tank base are
drawing to be approved by the
Inspection Consultant before any
Checklist installation work begins.
3.3 As per Approved QCS-2014 & QCS 2014 Assemble at site sectional Project After Installation H H W N/A WIR shall be
Installation GRP method Project water tank of hot pressed Engineer /QA- raised.
sectional panels statement and Specification moulded GRP insulated panels QC Engineer Subcontractor
& piping approved shop Approved Shop
Drawing
( Rigid PU Foam ) ( Glass Inspection
drawing
Reinforced Plastic ) of ivory
Inspection
Checklist grey colour provide with
lockable Manhole covers air

25 | 2 9
vent with overflow and all
piping connections.
The panels shall comply with
BS 7491: part 3: 1994 and shall
have convex shape to assist a
complete draining of water.

4 As per QCS-2014 & QCS 2014 Tank shall have the following Project After Installation H H W N/A WIR shall be
Additional Project additional components – Low level
Approved Engineer /QA- raised.
components Specification electric float switches, External
method QC Engineer Subcontractor
Approved ladder of GRP, Internal ladder of
statement and Inspection
Shop Drawing GRP, Vent, Overflow & Drain
approved shop
Project connection, Interconnecting pipes
drawing Specification with valves and Access cover.
Inspection 19.2.17
Checklist
4.1 As per Approved QCS-2014 & QCS 2014 Tank partition panels shall comply Project After Installation H H W N/A WIR shall be
Tank Partition method Project with the following: Engineer /QA- raised.
statement and Specification Tensile strength of not less than QC Engineer Subcontractor
approved shop Approved 850 kg/cm2 Inspection
drawing Shop Drawing Flexural strength of 1800 kg/cm2
Inspection Project
to ISO 178
Checklist Specification
19.2.17 Impact strength of 80 kg/cm2
ISO 179
Water absorption less than 0.2%
ISO 62
Glass content more than 30%
No light transmission
GRP panel thick not less than 8
mm
5 As per Approved QCS-2014 & QCS 2014 Tank & pipe identification, color Project After Installation H H W N/A WIR shall be
Identification & method Project coding of flow arrows shall be Engineer /QA- and Requested raised.
Labelling statement and Specification provided per ANSI and QCS QC Engineer for Inspection Subcontractor
approved shop Approved standards.
Inspection
drawing Shop Drawing Labelling reference details shall be
Inspection Project as per employer approval.
Checklist Specification
19.2.17
6 As per Approved QCS-2014 & QCS 2014 The installation shall be Project Daily H H W N/A WIR shall be
Protection of method Project adequately protected against Engineer /QA- raised.
Works statement and Specification damage and deterioration when QC Engineer Subcontractor
26 | 2 9
approved shop Approved handed over. Inspection
drawing Shop Drawing
Inspection Project
Checklist Specification
19.2.17
7 As per Approved QCS-2014 & QCS 2014 GRP sectional water Tank shall be Project Completed H H W N/A WIR shall be
Leak testing method Project subject to water leak testing to Engineer /QA- section and raised.
statement and Specification ensure all joints has been securely QC Engineer Requested for Subcontractor
approved shop Approved fixed.
Testing/ Inspection
drawing Shop Drawing
Inspection
Inspection Project
Checklist Specification
19.2.17

27 | 2 9
Appendix 2
10.3. Checklist for GRP WATER TANK

28 | 2 9
Project Name:
Document Title Date 03-NOV-22
Document No Rev. No. 0
Location/Area MST Ref. ITP Ref. WIR Ref. Date

LPS-01-HTI-MST-ME-007 LPS-01-HTI-ITP-ME-007
Confirm Y/N Inspected By
S. No Activities/Items to be inspected (Tick Mark) (Tick Mark) Remarks
Yes No Site Engineer&/ QC Inspector Others
Sub Cont.

1. Approved materials are used


"Approved Shop Drawing" are used
2.
for installation
GRP sectional water tank panels are
3.
free from any damages
Check water storage tank base as per
4.
approved drawing
Check bolts & nuts sizes as per
5.
manufacturer’s recommendation
Assembly of GRP sectional water tank
6. panel block assembly are installed
correctly
Tank Corner block & Stay bolt are
7.
installed correctly
Internal and External ladder are
8.
installed correctly
Tighten bolts and nuts as per
9.
manufacturer recommendation
Check GRP sectional water tank
10.
alignments
11 GRP sectional water tank leak testing
Comments and Discrepancies (If any)
1

HexaTech Site Engineer HBK Inspector CSC (QDC) NEO/Others


Name Name Name Name

Position Position Position Position

Signature Signature Signature Signature

29 | 2 9