SAFETY INSPECTION REPORT

LPS-01 PROJECT

Area
LPS-01 Date 14.02.2024 Time 08.00 PM
Location
Completed by Mark Signature

Items to be checked

1 Safety Plans 7 Waste Controls 13 Holes and Voids 19 Lifting Plant and Lifting Gear

2 Registers and Records 8 Fire and Gases/Hot work x 14 Working at height 20 Site Storage x

Access Walkways and


3 Signs and Notices 9 15 Internal Routes 21 House Keeping x
Stairs
First Aid and Medical Plant and
4 10 Ladder Access x 16 22 Portable Hand/Power Tools
Facility Machinery
Scaffolding/Working Guarding and
5 Health Hazards 11 17 23 Hygiene and Welfare
Platforms Fencing
Edge Protection/ Floor Electrics/
6 Chemicals x 12 18 x 24 Personal Protection Equipment
opening illumination
Photo
Observation Corrective Actions to be Taken Action Date Action By Followed By
No.
Inadequate edge protection at Ensure edge protections are

Immediate
GF zone B electrical room. closed properly.

2 Days

4 Days
1


FHR access obstruction at B- Always ensure that FHR

x Immediate

2 Days

4 Days
2 1. access is free of obstruction.

Observations Closeouts

Inadequate edge protection at GF zone B Ensure edge protections are closed properly.
electrical room.

HBK-CRCC JV-HS-FRM-00044 Rev 1 Page 1 of 2


SAFETY INSPECTION REPORT
LPS-01 PROJECT

FHR access obstruction at B-1. Always ensure that FHR access is free of
obstruction.

HBK-CRCC JV-HS-FRM-00044 Rev 1 Page 2 of 2 -June-17