1 Safety Plans 7 Waste Controls 13 Holes and Voids x 19 Lifting Plant and Lifting Gear

2 Registers and Records 8 Fire and Gases/Hot work x 14 Working at height x 20 Site Storage

Access Walkways and


3 Signs and Notices 9 15 Internal Routes 21 House Keeping
Stairs
First Aid and Medical Plant and
4 10 Ladder Access x 16 22 Portable Hand/Power Tools x
Facility Machinery
Scaffolding/Working Guarding and
5 Health Hazards 11 17 23 Hygiene and Welfare
Platforms Fencing
Edge Protection/ Floor Electrics/
6 Chemicals x 12 18 x 24 Personal Protection Equipment x
opening illumination
Photo
Observation Corrective Actions to be Taken Action Date Action By Followed By
No.
At Level-4,zone-D, it has been Activity put on hold, refresh
1

Immediat
observed that operatives were training on safe work at height

2 Days

4 Days
performing work at height activity must be conducted to the

e
unsafely, they were following operatives.
unsafe methods.

Found that scaffolding without Ensure that scaffoldigs are

x Immediate Immediate

2 Days

4 Days
inspection tag at Level-6,zone-B. inspected by a competent
2 scaffolding inspector prior to use.

Observed that floor opening was not Ensure floor openings are
2 Days

4 Days
protected at Level-6. properly coverd by rigid
3 plywoods with signages.

Observations Closeouts

HBK-CRCC JV-HS-FRM-00044 Rev 1 Page 1 of 3


SAFETY INSPECTION REPORT
LPS-01 PROJECT

At Level-4,zone-D, it has been observed that Activity put on hold, refresh training on safe work
operatives were performing work at height at height must be conducted to the operatives.
activity unsafely, they were following unsafe
methods.

Found that scaffolding without inspection tag at Ensure that scaffoldigs are inspected by a
Level-6,zone-B. competent scaffolding inspector prior to use.

HBK-CRCC JV-HS-FRM-00044 Rev 1 Page 2 of 3 -June-17


SAFETY INSPECTION REPORT
LPS-01 PROJECT

Observed that floor opening was not protected at Ensure floor openings are properly coverd by rigid
Level-6. plywoods with signages.