Professional Documents
Culture Documents
Hazard board and signage up-to-date Proper lift assessment plan done Correctly stored
Environmental plan – issues Crane certification current Safety Data Sheet (SDS) available
Toolbox talk last date / / Slings/chains certified Operators using PPE
Safety inductions for all on site Operator procedures in place
12. Tools
Safety notice board current Inspections being done
PAT tool WoF current and secure
Man cage available
2. Site facilities Staff trained in tool use (SWPS)
Emergency plan in place
Offices clean, adequate & good lighting PAT signage on site
Smoko sheds – clean, potable water 7. Compressed air equipment
13. Scaffolding
Toilets – clean, washing water In good condition
Notifiable weekly Scaftag/current
Tool/equipment sheds adequate Appropriate guards fitted
Handrails/mid-rails
Trained user
3. General site tidiness and accessways Toe boards
Clear, safe access to work areas 8. Excavations Platforms
Stairways and accessways clear Correctly shored Ladders/stairs
Hoardings/fence and gates secure Base sound
9. Welding/gas cutting
Loose materials secure from wind Work platforms clear
Hot work permits being issued
Platforms trip free
4. Personal safety equipment Fire extinguishers on hand
Planks tied down
Signage displayed and legible Operators using PPE
Headroom clear
Hardhats being worn
10. Electrical equipment Ties/bracing adequate
Correct footwear being worn
Main board lockable/weatherproof 14. Ladders
Glasses/ear muffs/vests/masks used
Current tagged and damage-free leads
Good condition
5. First aid/fire prevention Current tagged plant
Secured top and bottom
First aid box Available Current tagged lifeguards
Stays to step ladders
Accident register Leads safely placed
Working 2 steps down
Fire extinguishers Available Equipment in good condition
Current (12 mth) Appropriate guards on equipment 15. Fall hazards