RAPID-P028B-CMI-CMM-JHA-

Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1

SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting

AREA / LOCATION: TAG / EQUIPMENT NO.: SERVICE / MEDIUM:


P28B SPHARE TANK 5150 As per PTW As per PTW

OVERALL RISK RATING Low Medium High Very High



(TICK √)

Name Department/Company Name Department/Company

JHA MEMBERS

Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1

SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting

Name Department/Company Date Signature

JHA Leader Amir Comm / CMI

Reviewer
Reviewer
Endorser
Approving Authority

Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1

SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting

Step Step Description Potential Hazards /


Control / Recovery
No. Consequence Responsible Person
Measures
(P/E/A/R)
1 1.1 Mobilization of 1.1 COVID-19 virus spread 1.1.1 Screen body temperature 1.1.1 Work leader,HSE,Workers
Manpower before enter access gate and
Shelter. 1.1.2 Work leader,HSE,Workers

1.1.2 Maintain at least 1m 1.1.3 Work leader,HSE,Workers


physical distance whenever
possible. 1.1.4 Work leader,HSE,Workers

1.1.3 Scan Mysejahtera QRcode 1.1.5 Work leader,HSE,Workers


at Shelter, and main gate.

1.1.6 Work leader,HSE,Workers


1.1.4 Follow SOP and quarantine
at home if affected.

1.1.7 Work leader,HSE,Workers


1.1.5 All workers are compulsory
to wear mask before entering
PIC gate and worksite.

1.1.6 Workers shall use hand

Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1

SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting

sanitizer provided after handling


material/ tools

1.1.7 Workers to report


immediately to supervisor or HSE
and send to nearest clinic if any
symptoms occur i.e. (Cough, Flu,
Fever, up to 37°C, Difficulty of
Breathing)

2 2.1 Working in live 2.1 Gas leaking/ exposure to 2.1.1 Attended operation HSE 2.1.1 Work leader, HSE, Workers
refinery plant gas induction.

2.1.2 Work leader, Workers


2.1.2 Only authorized/approved
personel / workers to be allowed
to works at the dedicated work 2.1.3 Work leader, Workers
area.

2.1.4 Work leader, Workers

Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1

SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting

2.1.3 Personnel to evacuate from


work area to nearby assembly
2.1.5 Work leader, Workers
point/toxic release shelter in
crosswind and upwind direction.
Only return back to work site
after gas test has been
conducted by AGT and cleared
by operation.

2.1.4 No nearby hot work


involved in this activity during
painting.

2.1.5 Wear personal gas badge


(Ratio 1 gas badge: 4
personnel's)

3 3.1 Preparation work 3.1 Miss communication / 3.1.1 Apply valid PTW must be 3.1.1 Work leader, Workers
Lack of information approved prior PTW issuance

Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1

SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting

Consequences: People and and approval


Asset
3.1.2 Work leader, Workers

3.1.2 Provide mark-up drawing


for specific job location.

3.2 Unauthorized 3.2.1 Include workers name in 3.2.1 Work leader, Workers
workers enter to PTW
operation area
3.2.2 Work leader, Workers
3.2.2 Cordon the work area with
barricade tape

3.3 Slip & trip 3.3.1 JHA & JMS to be briefed to 3.3.1 Work leader, Workers, HSE
the workforce during daily
toolbox talk meeting (TBM) 3.3.2 Work leader, Workers

3.3.2 Beware of uneven surface


and watch footsteps

Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1

SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting

3.4 Hazardous gas release 3.4.1 All workers & staff must 3.4.1 Work leader, Workers
attended and undergone Oil &
Gas Passport (OGSP) training. 3.4.2 Work leader, Workers

3.4.2 Wear gas badge when 3.4.3 Work leader, Workers


working at H2S area

3.4.3 If alarm triggered, evacuate


the area and proceed to safe
assembly point in crosswind and
upwind direction and report to
PS on duty.

4 4.1 Removal of dirty and 4.1 Sharp edges, Pinch 4.1.1 Wear proper PPE gloves, 4.1.1 Work leader, Workers
tacky surface using clean point, Ergonomic (repetition N95 dust mask, rubber glove
cloth and thinner
work)
4.1.2 Work leader, Workers
4.1.2 Skill workers to perform
the job
4.1.3 Work leader, Workers
4.1.3 No homemade tools
allowed

Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1

SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting

4.1.4 Work leader, Workers


4.1.4 Work in buddy system

4.1.5 Proper body posture while 4.1.5 Work leader, Workers


lifting object

4.2 Working at height 4.2.1 Worker who worked at 4.2.1 Work leader, Workers,HSE
height attended WAH awareness
training 4.2.2 Work leader, Workers,HSE

4.2.2 Wear full body harness 4.2.3 Work leader, Workers,HSE


with double lanyard anchored at
all time. (100% tie off)
4.2.4 Work leader, Workers,HSE
4.2.3 Ensure safe working
platform and no obstruction on
the
access

4.2.4 To perform safety harness


inspection prior to use

Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1

SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting

5 5.1 Using electrical tools 5.1.1 Slippery ground 5.1.1 To wear proper PPE
Using Grinder (battery (rubber gloves), safety glasses
operate) 5.1.1 Work leader, Workers
5.1.2 Uneven surface and N95 dust mask.

5.1.3 Ergonomic/ Repetitive


5.1.2 Work leader, Workers
movement 5.1.2 Provide safe access

5.1.4 Caught in between


5.1.3 Work leader, Workers
rotating part 5.1.3 Supervisor to check the
access
5.1.4 Work leader, Workers

5.1.4 Practice good


housekeeping all the time
5.1.5 Work leader, Workers

5.1.5 Maintain good


5.1.6 Work leader, Workers
housekeeping

Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1

SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting

5.1.6 Use buddy system as help 5.1.7 Work leader, Workers


of friend or use machinery

5.1.8 Work leader, Workers


5.1.7 Use legs not back to lift a
things (proper body posture)
5.1.9 Work leader, Workers

5.1.8 Use mechanical aid if


necessary 5.1.10 Work leader, Workers

5.1.9 Guard to be install on the


machine

5.1.10 Equipment must be


inspected by US .
6 6.1 Applying coating 6.1.1 Chemical 6.1.1 To wear proper PPE 6.1.1 Work leader, Workers
(rubber gloves ), safety glasses
6.1.2 Slippery ground and N95 dust mask. 6.1.2 Work leader, Workers

Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1

SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting

6.1.3 Uneven surface 6.1.2 To refer safety data 6.1.3 Work leader, Workers
sheet(SDS) for compliance on
manual handling of chemical. 6.1.4 Work leader, Workers
SDS to be made available at site.
6.1.5 Work leader, Workers
6.1.3 To provide sufficient water
for cleaning and washing
6.1.6 Work leader, Workers
6.1.4 Provide safe access

6.1.5 Supervisor to check the


access

6.1.6 Practice good


housekeeping all the time and
maintain good housekeeping
6.2.1 Use of Boomlift 6.2.1 Boomlift operator must be 6.2.1 Boomlift operator, Work Leader
competent person
6.2.2 Boomlift operator, Work Leader
6.2.2 Boomlift must be inspected

Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1

SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting

and attach with the prefchem


inspection sticker 6.2.3 HSE, Work Leader

6.2.3 Barricade the area and 6.2.4 Workers, Boomlift operator,


force warning signage before Work Leader
conducting the activities using
boomlift 6.2.5 Workers, Boomlift operator,
Work Leader
6.2.4 Use proper PPE and safety
harness (100% Tight off), Double 6.2.6 Workers, Boomlift operator,
lanyard anchord at all time Work Leader,HSE

6.2.5 Perform safety harness 6.2.7 Workers, Boomlift operator,


inspection prior to use Work Leader

6.2.6 Emergency access and 6.2.8 Workers, Boomlift operator,


egress from work area must not Work Leader, Signalman
obstructed the boomlift
6.2.9 Workers, Boomlift operator,
6.2.7 Secure tools or material Work Leader, Signalman
during transportation

Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1

SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting

6.2.10 Work Leader,HSE


6.2.8 Competent signalman must
be present all the time during
6.2.11 Boomlift operator, Work
commoncement of activities
Leader, Signalman
6.2.9 Stay away from line of fire

6.2.10 Only authorized person


are allowed to be inside the
operation area

6.2.11 Good communication


between signalman and the
boomlift operator
7 7.1 Housekeeping before, 7.1.1 Slip, trip and fall 7.1.1 Make sure access is not 7.1.1 Work leader, Workers
during and after the jobs being obstructed
(daily activities)
7.1.2 Work leader, Workers
7.1.2 Material obstruction 7.1.2 To always to highlight in
the daily toolbox talk of the work 7.1.3 Work leader, Workers

7.1.3 Limitation of view 7.1.3 Not to perform any activity 7.1.4 Work leader, Workers

Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1

SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting

once sounded an alarm


7.1.5 Work leader, Workers
7.1.4 Rubbish to be segregated
accordingly, dedicated rubbish
bin

7.1.5 Used construction waste


materials such as, plastics,
woods, construction waste
should dump into RORO bin

Open