SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting
JHA MEMBERS
Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1
SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting
Reviewer
Reviewer
Endorser
Approving Authority
Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1
SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting
Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1
SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting
2 2.1 Working in live 2.1 Gas leaking/ exposure to 2.1.1 Attended operation HSE 2.1.1 Work leader, HSE, Workers
refinery plant gas induction.
Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1
SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting
3 3.1 Preparation work 3.1 Miss communication / 3.1.1 Apply valid PTW must be 3.1.1 Work leader, Workers
Lack of information approved prior PTW issuance
Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1
SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting
3.2 Unauthorized 3.2.1 Include workers name in 3.2.1 Work leader, Workers
workers enter to PTW
operation area
3.2.2 Work leader, Workers
3.2.2 Cordon the work area with
barricade tape
3.3 Slip & trip 3.3.1 JHA & JMS to be briefed to 3.3.1 Work leader, Workers, HSE
the workforce during daily
toolbox talk meeting (TBM) 3.3.2 Work leader, Workers
Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1
SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting
3.4 Hazardous gas release 3.4.1 All workers & staff must 3.4.1 Work leader, Workers
attended and undergone Oil &
Gas Passport (OGSP) training. 3.4.2 Work leader, Workers
4 4.1 Removal of dirty and 4.1 Sharp edges, Pinch 4.1.1 Wear proper PPE gloves, 4.1.1 Work leader, Workers
tacky surface using clean point, Ergonomic (repetition N95 dust mask, rubber glove
cloth and thinner
work)
4.1.2 Work leader, Workers
4.1.2 Skill workers to perform
the job
4.1.3 Work leader, Workers
4.1.3 No homemade tools
allowed
Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1
SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting
4.2 Working at height 4.2.1 Worker who worked at 4.2.1 Work leader, Workers,HSE
height attended WAH awareness
training 4.2.2 Work leader, Workers,HSE
Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1
SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting
5 5.1 Using electrical tools 5.1.1 Slippery ground 5.1.1 To wear proper PPE
Using Grinder (battery (rubber gloves), safety glasses
operate) 5.1.1 Work leader, Workers
5.1.2 Uneven surface and N95 dust mask.
Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1
SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting
Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1
SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting
6.1.3 Uneven surface 6.1.2 To refer safety data 6.1.3 Work leader, Workers
sheet(SDS) for compliance on
manual handling of chemical. 6.1.4 Work leader, Workers
SDS to be made available at site.
6.1.5 Work leader, Workers
6.1.3 To provide sufficient water
for cleaning and washing
6.1.6 Work leader, Workers
6.1.4 Provide safe access
Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1
SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting
Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1
SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting
7.1.3 Limitation of view 7.1.3 Not to perform any activity 7.1.4 Work leader, Workers
Open
RAPID-P028B-CMI-CMM-JHA-
Serial No.
JHA WORKSHEET 5150-XXXX
Revision No. 1
SCOPE OF WORK / JOB TITLE: Cleaning Work, Recoating and Touch-up Painting
Open