Professional Documents
Culture Documents
Region X
Division of Malaybalay City
Malaybalay City District VI
MAGSAYSAY INTEGRATED SCHOOL
Magsaysay, Malaybalay City
OBJECTIVES:
5. CONDUCT OF
CONSULTATIVE Orientation of parents, 100% attendance with
MEETING AND barangay officials, the following
PLANNING WITH THE teachers and documents
BARANGAY stakeholders virtually School Head,
on the school’s September 6, 2021 Barangay
OFFICIALS Picture Bond paper, ink,
Officials, 500.00
priorities and the Documentations,
functions and roles of Attendance, Minutes Teachers
each. of the Meeting,
The school will Communications
conduct
orientation/meeting The activity will
and planning session produce a
with the barangay systematize plan on
officials to maximize how modules are
the distribution, distributed, retrieved,
retrieval, and and monitored.
monitoring of the
schools system in
doing the modular
learning modality.
1. Orientation of
parents will be
conducted through
6. CONDUCT OF sending letters and
ORIENTATION TO communications and School Head, Bond paper, ink
80-100% attendance of September 7, 2021 500.00
PARENTS ABOUT through posting in the Teachers,
parents
THE MODULAR school’s facebook Parents
MODALITY OF page.
LEARNING AND 2. The orientation will
IMPORTANT include salient
MATTERS IN THE features of modular
NEW NORMAL. learning and other
important matters and
concepts in the
operations of the
school in the new
normal. Moreover, it
will discuss the
different modes on
the conduct of
remedial teaching,
assessment, and
portfolio assessment.
3. Parents will be
grouped in batches.
Each batch will be
composed of 10
parents from every
purok in order to
observe the minimum
health requirements
of Department of
Health.
They will be
oriented with aspects
of distance Learning.
7. REPRODUCTION
OF MODULES The reproduction of
modules will be done
by grade level per School Head,
subject Area.. Each 50%-100% modules Teachers and Ink ,Printer,
Teacher consultant is printed Whole year round 50,000.00 bondpaper,
School’s Staff
responsible of printing stapler
LRMDS
his/her modules. He/
she is provided with
the equipment and
materials for printing.
This task will be
reflected in their
classroom program.
Some modules from
the previous year can
still be of use.
2. REPAIR OF
SCHOOL’S
WASHING 1. Make Program of
FACILITY Works to be approved School’s washing
by the division facilities repaired BAC Construction
2. Convene BAC members, 30000 Supplies
members November 2021 School Head,
3. Follow Procurement Documents are Carpenter
Process available
4. Make some Attendance/pictures
before, during and after/
Documentations for
Notification
attachment to the letter/Minutes/ Bill of
liquidation papers materials, Cost of labor/
POW
Washing facility of the
school is very
important since pupils
are directed to wash
hands always and
brush their teeth after
eating. The broken
water pipes and
damaged faucets will
be replaced.
3. DEVELOPMENT OF Utilization of School Copies Video Lessons September 7, 2021 School Head, 500.00 USB, Printing
DIGITIZED LEARNING based made digitized for Secondary onwards Teachers, materials
RESOURCES learning resources such RBI Work sheets ICT
ATTENDANCE TO RBI as video lessons and rbi submitted or distributed coordinator/
worksheets RBI
coordinator
4. Making of Reading School Head
Materials Modules September 6, & Teaching
Provide Learners with 80,000.00 Inks/ Bond
2021, two weeks and Non-
supplemental reading Papers,
Printed modules before every Teaching
materials to assist Folders,
grading period. Personnel &
them at homes. Fasteners
Stakeholders
5. Teaching of reading - Home visit Teachers will visit pupils’
place or house to conduct
and conduct of schedule will teaching of reading and School Head
remedial teaching be done based remedial teaching. & Teaching
on the results Pupils who need help from Whole year round and Non- Bond paper, ink,
their teacher consultant may
of Teaching
ask or clarify things through 5000 reading and
assessment. call, text or message via Personnel &
- The ILP will phone or Facebook groups. Stakeholders instructional
Minimum health
also serve as requirements will strictly be materials
basis for home observed
visit schedule.
.
1. CONDUCT 1. Done by sending
TECHNICAL communications and
MEETING ON THE letters to parents and
OPENING OF posting updated Information
CLASSES FOR SY informations in the dessiminated and School Head,
school’s fb page. Inks/ Bond
2021-2022 queries answered September Teachers, 500.00
(ORIENTATION ON 2021 Local Papers,
MODULAR 2. The school will Government
conduct technical Folders,
LEARNING Officials
meeting on the Fasteners
MODALITIES AND GPTA
SCHEME) opening of classes.
This will allow the
school to consider
important and urgent
areas needing
attention vital to the
opening of classes.
3. A class will be
divided into 4
groups/sets. The
distribution of modules
will be according to
alphabetical order of
names
B. LEARNERS TRACKING
INDICATORS MODULE DISTRIBUTION MODULE RETRIEVAL WRITTEN WORKS ASSESSMENT REMARKS
LEARNER’S
ATTENDANCE Learner’s attendance will be Learner’s attendance will The written works will also To gather information of Visibly Implemented
based on the monitoring also be checked on the be the basis of learners’ what learners know, it
checklist that is modules retrieved based on attendance and grades. can be based on their
accomplished by the teacher the monitoring checklist The response of the modules submitted, or
in charge of distribution learners will be assessed through validation by
according to the written chat or contact/call
outputs submitted. through cellular phones.
Checklists The portfolio can also
Record book be the basis for
SF2 assessment.
Class Record
LEARNER’S The school created its own Complied SLMs will be Teachers will identify Summative Tests Visibly Implemented
PERFORMANCE mechanism on how to track retrieved after a week learners who need Performance tasks
learners performance. The attention in specific tasks Portfolios
learners and parents will Essay Formative Tests
also give their feedback by Written Reports
dropping down in the boxes Reflective Journal- Graded
their written concerns upon based on Rubrics
the return and release of
modules.
C. PAPs Implementation (Curriculum Related)
PAPs RESPONSE MEASURES STRATEGY/ACTIVITIES EXPECTED OUTPUT TIME FRAME IN CHARGE
OF IMPLEMENTATION
READING Giving of Supplementary Learners are being visited Reading Performance to
Reading materials to by the teacher for reading have increased by at least
learners assessment 2% Whole year round School head, Teachers,
Developed writing ability Reading Coordinators
PROJECT “BULIGA to Profiling of readers based on reading
READ”- Building Unified Equip learners/pupils with Use of PHIL.IRI and other performance
Learners who are the necessary reading diagnostic
Independent and has materials as a source of Developmental Reading
guaranteed Ability to Read knowledge for reading. with evaluation and
assessment
JOURNALISM
D. SPED
Using….
DISTRIBUTION OF MODULES
1. Modules are properly distributed to drop points as planned.
2. 100% of the modules is distributed to drop points as planned.
3. All the modules are distributed to drop points as planned on time.
RETRIEVAL OF MODULES
1. Modules are properly retrieved from drop points as planned.
2. 100% of the modules is retrieved from drop points as planned.
3. All the modules are retrieved on time from drop points as planned.
CHECKING OF MODULES
1. Modules are checked and assessed well based on recommended ways.
2. 100% of the modules is checked and assessed well based on recommended ways
3. All the modules are checked and assessed well based on recommended ways on
time.
TEACHING OF READING AND REMEDIAL TEACHING
1. Pupil’s performance and reading skills improved after the home visit learning mode
conducted by teachers.
2. 100% of the pupils improved their performance and reading skills after the home visit
learning mode conducted by teachers.
3. Pupils accomplished task based as indicated in their individual learning plan.
Prepared by:
MARYLAN G. TANDOG
School Principal