Construction Project Timeline 2010-2011

This document appears to be a progress report for a construction project that took place from March 2010 to April 2011. It shows the activities completed each month, indicated by numbers in parentheses. The project began with mobilization, clearing, grubbing and excavation from March to May 2010. Formwork, concreting and backfilling occurred from June to August 2010. Concrete laying, plastering and sealant works continued from September 2010 to January 2011. Roof framing was done from February to March 2011. The project reached topping-off in April 2011 and was targeted for completion by the end of April 2011.

Uploaded by

jtuquero.chcc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views1 page

Construction Project Timeline 2010-2011

This document appears to be a progress report for a construction project that took place from March 2010 to April 2011. It shows the activities completed each month, indicated by numbers in parentheses. The project began with mobilization, clearing, grubbing and excavation from March to May 2010. Formwork, concreting and backfilling occurred from June to August 2010. Concrete laying, plastering and sealant works continued from September 2010 to January 2011. Roof framing was done from February to March 2011. The project reached topping-off in April 2011 and was targeted for completion by the end of April 2011.

Uploaded by

jtuquero.chcc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

2010 2011

REMARKS
MARCH ( 1 ) APRIL ( 2 ) MAY ( 3 ) JUNE ( 4 ) JULY ( 5 ) AUGUST ( 6 ) SEPTEMBER ( 7 ) OCTOBER ( 8 ) NOVEMBER ( 9 ) DECEMBER ( 10 ) JANUARY ( 11 ) FEBRUARY ( 12 ) MARCH ( 13 ) APRIL ( 14 )

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56

Project Commencement Topping-off Target Completion


(01 March 2010) (07 April 2011) (30 April 2011)

PROJECT SUPERVISION AND CONTROL (426)

SEALANT AND BACKER CONTINUE


GRAVEL BEDDING/ SOIL POISONING (91) ROD/CONTINUE PLASTERING/
PLASTERING/ SEALANT AND
8 PLASTERING/ CONTINUE CHB LAYING CONTINUE SEALANT AND BACKER BACKER ROD /
CONTINUE CHB (31) ROD/CONTINUE PLASTERING/ CONTINUE CHB ZOCALO FOR
CHB LAYING LAYING LAYING T&B'S
(30) (31) (74) (8)
13 14 16
MOBILIZATI BACKFILLING AND COMPACTION ZOCALO FOR T&B'S
ON / RSB/ FORMWORKS/ (92) (74)
CLEARING CONCRETING/ 11
AND CONTINUE DEMOBILIZ
CONTINUE
GRUBBING EXCAVATION AND
ROOF FRAMING WORKS/ CONTINUE RSB/ ROOF FRAMING ATION (15)
(7) DISPOSAL CONTINUE RSB/ FORMWORKS/ CONCRETING
CONTINUE RSB/ FORMWORKS/ CONCRETING (153) FORMWORKS/ CONCRETING WORKS
(46) (92) (8)
(66)
1 2 3 4 6 12 17 21 22 23 24
EXCAVATION/ CONTINUE FINAL
CONTINUE EXCAVATION AND INSPEC
CLEARING AND DISPOSAL TION
GRUBBING (15) FIRE EXIT, BALCONY, AND LOFT STAIR RAILINGS / BRIDGEWAY (105) (16)
(24)
VAPOR BARRIER / CONTINUE
WATERSTOP CONTINUE WATERSTOP VAPOR BARRIER
(31) (30) (31)
7 9 10

PERIMETER MAIN ENTRANCE TRENCH GRATING SHIP LADDER AND


RAILING 1ST RAILING COVER (28) RUNG LADDER
FLOOR (31) (31) (31)
15 18 19 20
TEMFACIL / CONTINUE MOBILIZATION
(54)
5 ELEVATOR SHAFT EMBED/
MANHOLE COVER/ LADDER
RUNGS
(31)

MISCELLANEOUS WORKS
(426)