Professional Documents
Culture Documents
KEY PLAN:
TYPE M1
200
A A
THEORETICAL GORE POINT
TRAF
FIC DIR
ECTIO
N
240
EXIT
18.00m FOR SPEED > 60kph 18.00m FOR SPEED > 60kph 18.00m FOR SPEED > 60kph
30
05
-7
3000
9.00m FOR SPEED < 60kph 9.00m FOR SPEED < 60kph 9.00m FOR SPEED < 60kph
00
RRPM
240
10
0°
(DOUBLE FACE YELLOW/YELLOW
.0
EDGE LINE (CONTINUOUS-YELLOW)
B
45
REFLECTIVE RPM)
TYPE M1 (PATTERN 38)
240
A
6000
TYPE M1
120 TRAFFIC DIRECTION
B
30
MAIN ROAD TYPE M1
SOLID LINE (WHITE)
RRPM
N
IR ECTIO
FIC D
TRAF
100
ANCE NOTES:
30
B B
120
0°
240
50 45.0
RRPM 1- ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE INDICATED.
A B
2- ALL ROAD MARKING SHALL BE IN ACCORDANCE WITH THE LATEST MOT
(DOUBLE FACE WHITE/WHITE STANDARDS.
NO PASSING LINES, TWO DIRECTIONS FOR 2 LANES SPEED < 60Km/H (CONTINUOUS-WHITE) REFLECTIVE RPM) 3000 3- IMPLEMENTATION OF MARKING AND REFLECTIVE RAISED PAVEMENT
-7
240
MARKERS SHALL BE IN ACCORDANCE WITH THE SECTION 9 OF THE
TYPE M1A (PATTERN 30)
00
GENERAL SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION,
10
ISSUED IN 1998 MINISTRY OF TRANSPORTATION, KSA.
4- THE CONTRACTOR SHALL PREPARE AND SUBMIT SHOP DRAWINGS FOR
4000 4000
200
240
30
240
10
B
EDGE LINE, DOTTED (YELLOW) 00 TRAFFIC DIR
-7 ECTION
50
TYPE M2 (PATTERN 46) 3000
240
B
0°
6000 12000 6000 12000 6000 12000 6000
45.0
6000 6000 6000 6000 6000 6000 3000
240
THEORETICAL GORE POINT
E
18.00m 18.00m ECTION
120/150
TRAFFIC DIR
TYPE M1
RRPM WHITE CHEVRON
RRPM SYMBOLS & ABBREVIATIONS:
150mm FOR EXRESSWAY
(SINGLE FACE WHITE/ A (m) B (m) kph
120mm FOR OTHER ROADS > 60kph LANE LINE BROCKEN (WHITE) SOLID LINE (WHITE)
REFLECTIVE RPM) 2.0 0.3 <80
GRIDS
TYPE M3 (PATTERN 10) HATCHING AND CHEVRON MARKING (YELLOW) 3.0 0.45 80-100
D DS = DESIGN SPEED D
THROUGH
12.00m 12.00m
ACCELERATION
DECELERATION
1100
50
200
RRPM
(SINGLE FACE YELLOW/ R8
LANE
OR
REFLECTIVE RPM)
D EDGE LINE BROCKEN (YELLOW)
TYPE M4 (PATTERN 42)
1400
1600
R5
50
500
3000
3000
E 0m 2m 4m 5m 6m 10m
1600
1400
REV/02 ISSUED FOR APPROVAL 17/09/2023 ENG/ALAM
1600
(STOP CASE)
2300
DS DS DS DS DS
800
800
30kph 50kph 70kph 90kph 110kph DESIGN CONSULTANT / CONTRACTOR NEOM / EPM
0
00
4000
DRAWN ENG/ALAM 17/09/2023
R1 CHECKED CHECKED
ENG/ALAM 17/09/2023
30kph 40kph 60kph 80kph 100kph
APPROVED M.AZIZ 17/09/2023 APPROVED
2500
1100
2400
G
10-15mm
1700
Y4 Y4 Y4 Y4
00
0
R7
DS Y Y4 DISCIPLINE NAME:
00
300mm
1700
CIVIL
R1
PAVEMENT TOP (kph) (m) (m)
0
R70
Y
110 30 7.50
ROAD MARKING LAYOUT (CD-PCY-01)
90 25 6.25
70 20 5 SHEET-3 OF3
TRANSVERSE PREFORMED
PROJECT NAME :
THERMOPLASTIC PAVEMENT MARKING 50 14 3.50
300mm. WIDTH
30 10 2.50 300 300
INITIAL SITE PREPARATION FOR
BP,LA,PCY AND TSA LOCATIONS (L2)
Work Order No .1100001344/010
ARROW MARKING FOR LEFT ARROW MARKING FOR LEFT TURN
TURN LANE (WHITE) AND THROUGH TRAFFIC LANE (WHITE) COASTAL REGION
NEOM
THERMOPLASTIC MARKING DETAIL KINGDOM SAUDI ARABIA
H C ARROW MARKING DETAILS H
N.T.S.
D N.T.S.
REGION ASSET CODE CONTRACT CODE
10 606000 1100001344
DRAWING NUMBER
ORG DISCIPLINE C. DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.