Professional Documents
Culture Documents
KEY PLAN:
MATCH LINE 6 OF 15
MATCH LINE 7 OF 15
MATCH LINE 5 OF 15
MATCH LINE 6 OF 15
A A
E685519.4908 ,N3114532.4233
LEGEND:
B SYMBOLS & ABBREVIATIONS: B
PAVED CARRIAGEWAY
VERGE
EXISTING HIGHWAY 55 ROAD
PROW
PROPOSED ROW
CARRIAGEWAY EDGE
VERGE EDGE
3
4+62 LANE MARKING
CONSTRUCTION BARRIER
0
4+60
Ex. CARRIAGEWAY EDGE
LOGISTICS BOUNDARY
CHECK POST
1.00
0.50
C C
6.06
ARROWS
CHEVRON MARKING
BOLLARDS / CONSTRUCTION BARRIER
0.50
25.00 0
4+50
E-OHHV E-OHHV
ELECTRIC CABLE
SPEED HUMP
LA LAYDOWN AREA
EMS EXCAVATED MATERIAL STORAGE
EMR EXCAVATED MATERIAL RECYCLING
BP BATCH PLANT
PCY PRECAST CONCRETE YARDS
TP TRUCK PARKING
0
4+40 TCS TYPICAL CROSS SECTION
D D
Reference IFC drawing SEE DWG NO. :
10-600000-4200000001-ESC-INF-DRG-709052
to
10-600000-4200000001-ESC-INF-DRG-709071
1. ALL METAL REINFORCEMENT SHALL BE 50 MM CLEAR OF NEAREST FACE OF CONCRETE
UNLESS OTHERWISE SHOWN.IF UNIT IS SLIP-FORMED, REINFORCEMENT SHALL BE
CONTINUOUS.
2. MAXIMUM CHORD LENGTH FOR CURVE WITH RADII LESS THAN 440M SHALL BE 4M.
MAXIMUM CHORD LENGTH FOR CURVE WITH RADII GREATER THAN 440M SHALL BE 8M.
3. USE OF PRECAST BARRIER UNITS IS RESTRICTED TO CURVATURES WITH RADII
GREATER THAN 240M.
4. ALL CONCRETE SHALL BE CLASS K 350.
5. ALL REINFORCEMENT STEEL SHALL BE GRADE H410.
6. TO FACILITATE PIN REMOVAL THREAD HEX NUT HALF-WAY ONTO THE PIN AND TOCK
WELD. FILL NUT WITH GREASE TO EXCLUDE CONTAMINANTS.
E 0m 2m 4m 5m 6m 10m
F
F
CIVIL
RIPROP LAYO UT PLAN (CD-PCY-01)
MATCH LINE 6 OF 15
MATCH LINE 7 OF 15
MATCH LINE 5 OF 15
MATCH LINE 6 OF 15
SHEET-1 OF 4
PROJECT NAME :
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
KEY PLAN:
MATCH LINE 5 OF 15
MATCH LINE 4 OF 15
MATCH LINE 4 OF 15
MATCH LINE 3 OF 15
A A
1.00
0.50
3.65
0.50
0.82
0
3+80
LEGEND:
3+700
B SYMBOLS & ABBREVIATIONS: B
PAVED CARRIAGEWAY
1.00
0.50
VERGE
3.65
EXISTING HIGHWAY 55 ROAD
3+600 PROPOSED ROW
0.82
PROW
0.50
14373.2511 CARRIAGEWAY EDGE
VERGE EDGE
LANE MARKING
CONSTRUCTION BARRIER
1.00
0.50
LOGISTICS BOUNDARY
3+400
0.50
CHECK POST
0.82
C C
ARROWS
CHEVRON MARKING
BOLLARDS / CONSTRUCTION BARRIER
E-OHHV E-OHHV
ELECTRIC CABLE
SPEED HUMP
LA LAYDOWN AREA
EMS EXCAVATED MATERIAL STORAGE
MATCH LINE 5 OF 15
MATCH LINE 4 OF 15
MATCH LINE 4 OF 15
MATCH LINE 3 OF 15
0
0+00
to
10-600000-4200000001-ESC-INF-DRG-709071
1. ALL METAL REINFORCEMENT SHALL BE 50 MM CLEAR OF NEAREST FACE OF CONCRETE
UNLESS OTHERWISE SHOWN.IF UNIT IS SLIP-FORMED, REINFORCEMENT SHALL BE
CONTINUOUS.
0
4+30 2. MAXIMUM CHORD LENGTH FOR CURVE WITH RADII LESS THAN 440M SHALL BE 4M.
MAXIMUM CHORD LENGTH FOR CURVE WITH RADII GREATER THAN 440M SHALL BE 8M.
3. USE OF PRECAST BARRIER UNITS IS RESTRICTED TO CURVATURES WITH RADII
GREATER THAN 240M.
4. ALL CONCRETE SHALL BE CLASS K 350.
5. ALL REINFORCEMENT STEEL SHALL BE GRADE H410.
1.00
6. TO FACILITATE PIN REMOVAL THREAD HEX NUT HALF-WAY ONTO THE PIN AND TOCK
0.50
WELD. FILL NUT WITH GREASE TO EXCLUDE CONTAMINANTS.
4.92
0
4+20
0.82
0.50
E 0m 2m 4m 5m 6m 10m
0
4+10 REV/03 ISSUED FOR APPROVAL 10/08/2023 ENG/ AL AM
REV/02 ISSUED FOR APPROVAL 01/06/2023 ENG/ AL AM
PURPOSE OF ISSUE:
FOR APPROVAL
3.65
0.50
0.82
0
4+00
CLIENT: PROJECT MANAGEMENT CONSULTANT:
F
F
0
3+90
CIVIL
RIPROP LAYO UT PLAN (CD-PCY-01)
SHEET-2 OF 4
PROJECT NAME :
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
KEY PLAN:
A A
CD-PCY-1 Gate 2
LEGEND:
10.54
8.99
B A
A SYMBOLS & ABBREVIATIONS: B
PAVED CARRIAGEWAY
Y-1
TO CD-PC
E685977.0678 ,N3114625.8697
VERGE
Gate 1 EXISTING HIGHWAY 55 ROAD
E685519.4908 ,N3114532.4233
PROW
PROPOSED ROW
4+600
4+623
CARRIAGEWAY EDGE
1.00
0.50
VERGE EDGE
6.06
0.50
4+500
25.00
A A
PROW
4+400
LANE MARKING
PROW
E685464.5812 ,N3114511.8614
0+000
TO CD-PCY-1
4+300
CONSTRUCTION BARRIER
1.00
0.50
PROW
4.92
0.82
4+200
0.50
Ex. CARRIAGEWAY EDGE
PROW
4+100
LOGISTICS BOUNDARY
1.00
0.50
3.65
0.50
0.82
4+000
PROW
3+900
CHECK POST
PROW
1.00
0.50
3.65
0.50
0.82
3+800
C Gate 1 3+700
C
1.00
0.50
3.65
7.03 3+600
7.01
0.82
E684483.0639 N3114373.2511
0.50
E683234.9380 N 3114440.2874
E683980.9592.4079 N3114387.9199
ARROWS
60.00
E683518.8880 N 3114419.9537
55.00 25.00 55.00
25.00
1.00
E683424.4079 N 3114396.0905
1.00
0.50
0.50
1.00
0.50
0.50
1.00
0.50
3.65
3.45
9.92
9.92
3.45
0.50
1.00
3.68
7.11
0.50
3.65
0.50
3+400
0.82
0.82
1+900
0+000
2+000 2+100
1.00
0.50
2+200
0.50
0.82
3.65
0.50
0.82
0.50
0.82
0.50
2+300
1.00
1.00
2+400
0.50
3.65
3+300
0.50
0.82
1.00
3.65
0.50
3.65
0.50
CHEVRON MARKING
0.82
2+700 3+200
3.65
0.50
0.82
2+800
0.50
0.82
2+900 3+100
3+000
0.82
0.50
BOLLARDS / CONSTRUCTION BARRIER
E-OHHV E-OHHV
ELECTRIC CABLE
MATCH LINE 1 OF 15
MATCH LINE 2 OF 15
EMR EXCAVATED MATERIAL RECYCLING
BP BATCH PLANT
PCY PRECAST CONCRETE YARDS
Gate 1
TP TRUCK PARKING
TCS TYPICAL CROSS SECTION
D D
Reference IFC drawing SEE DWG NO. :
1.00
10-600000-4200000001-ESC-INF-DRG-709052
to
0.50
10-600000-4200000001-ESC-INF-DRG-709071
1. ALL METAL REINFORCEMENT SHALL BE 50 MM CLEAR OF NEAREST FACE OF CONCRETE
UNLESS OTHERWISE SHOWN.IF UNIT IS SLIP-FORMED, REINFORCEMENT SHALL BE
CONTINUOUS.
2. MAXIMUM CHORD LENGTH FOR CURVE WITH RADII LESS THAN 440M SHALL BE 4M.
MAXIMUM CHORD LENGTH FOR CURVE WITH RADII GREATER THAN 440M SHALL BE 8M.
3.65
3. USE OF PRECAST BARRIER UNITS IS RESTRICTED TO CURVATURES WITH RADII
GREATER THAN 240M.
4. ALL CONCRETE SHALL BE CLASS K 350.
5. ALL REINFORCEMENT STEEL SHALL BE GRADE H410.
6. TO FACILITATE PIN REMOVAL THREAD HEX NUT HALF-WAY ONTO THE PIN AND TOCK
0.50
MATCH LINE 1 OF 15
MATCH LINE 2 OF 15
MATCH LINE 3 OF 15
MATCH LINE 2 OF15
N 311444 0.2874
E683234.9380 10m
E 0m 2m 4m 5m 6m
1.00
REV/03 ISSUED FOR APPROVAL ENG/ AL AM
0.50
0.50
10/08/2023
1.00
0.50
1.00
3.65
7.11
3.68
2+100
0.82
FOR APPROVAL
0.50
0.82
0.50
0.82
F
F
CIVIL
RIPRAP LAYOUT PLAN (CD-PCY-01)
SHEET-3 OF 4
PROJECT NAME :
(F.G.L)
A A
ROAD SLOPE
NOTES:
B 1 - ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE INDICATED. B
2 - ALL STRUCTURAL EXCAVATION AND BACKFILL SHALL BE IN
ACCORDANCE WITH SPECIFICATION.
3 - INFORMATION SHOWN ON THE DRAWINGS ARE ONLY FOR
GUIDANCE, CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS
OF CULVERTS AND ANY OTHER DRAINAGE FACILITIES AS PER
Average 1000mm
m
AND GET ENGINEER’S APPROVAL BEFORE CONSTRUCTION.
AND AT THE ENDS OF PROTECTION
m
RIPRAP 4- IN CASE OF CONFLICT OR DISCREPANCY BETWEEN THE
0
PROTECTION BLANKET
30
INFORMATION SHOWN ON THE DRAWING AND THE ACTUAL SITE,
D50=300mm
CERTIFICATE OF MIX DESIGN THE CONTRACTOR SHALL MODIFY THE DRAWINGS ACCORDING
TO THE ENGINEER INSTRUCTIONS.
On-site Standardized Prescribed Masonry Mortar
COMPANY: ASB CO. Date Issued: 03/06/2023
m
C CONSTITUENT MATERIALS C
0 m
Material Type Supplier Source MAR Doc. No.
100
Cement (OPC) M400-D20
GROUND LEVEL Fine Aggregate (Sand) 0-3 mm
Water Potable
500mm
Admixture Sikanol M
E 0m 2m 4m 5m 6m 10m
1
F
4 F
COMPACTED RIPRAP
DESIGN CONSULTANT / CONTRACTOR
DRAWN
CHECKED
ENG/ALAM
MA
10/08/2023
10/08/2023
NEOM / EPM
CHECKED
APPROVED 10/08/2023 APPROVED
FILL
MA
CIVIL
RIPRAP SLOPE PROTECTION DETAIL(CD-PCY-01)
SHEET-4 OF 4
PROJECT NAME :
1 2 3 4 5 6 7 8