REPLACEMENT OF HYDRANT AND FOAM PIPELINE AT

LBT @ LBT1 AND LBT2 BRIDGE CONNECTION AT WHARF, WESTPORTS MALAYSIA SDN. BHD.

TENDER CLARIFICATION (ANSWER)


PART A : General Clarification

ANSWER
No DESCRIPTION YES NO NOTES
Are you fully read and understand the
1 job scope recommended and able to √
comply all the requirement?
Do you aware that this project to be
2 completed within 6 months without any √
extension of time and variance order.

Do you aware that this project will be


carried out according to operational
3 schedule, where contractor to prepare √
necessary manpower and completion to
be on time?

Do you have done any other similar


project which is done recently? Please
4 √
provide necessary supporting document
and referral letters from the clients.

Do you have skilled manpower, tools,


equipment, machineries and materials
Please refer to attachment file :
5 supply sufficiency to complete this √
List of Machinery and Equipment
project within the timeline given?
Supporting documents require.

Based on your study, what is the actual


power and man-hours required to
Please refer to attachment file :
complete this entire project within
6 √ Manpower & Manhours List for West Port
given timeframe. Please proved Project - rev1
manpower and man-hours calculation
in simple table format.
The necessary material project for the
entire project will sourcing by locally or will
7 √
imported from overseas. What is estimation
of lead time?
You are requested to provide simple
Please refer to attachment file :
method of statement and projection plan
8 √ Method of Statement for Hydrant and Foam
for the entire project completion. Please
Pipeline Replacement - rev0
attached your supporting documents.
If the contract awarded to your company,
what is the facilities, supports do you feel
9 needed form our end to ensure project √
completion timely without compromise
quality of works.