You are on page 1of 36

PRE- FEASIBILITY ON DEVELOPING

100 MW SOLAR POWER PARK IN SIYAMBALANDUWA


IN MONARAGALA DISTRICT

Sri Lanka Sustainable Energy Authority


BMICH, Bauddhaloka Mawatha
Colombo 00700, Sri Lanka
Telephone: +94 11 267745, Facsimile: +94 11 2682534
Email: info@energy.gov.lk, www: www.energy.gov.lk

November 2018
1
Editorial Panel

Mr. Ranjith Sepala, Director General, SLSEA


Mr. Harsha Wickramasinge, Deputy Director General, Demand Side Management, SLSEA
Mr. Wimal Nadeera, Deputy Director General, Support Side Management, SLSEA
Mr. Chamila Jayasekara, Director Strategy
Mr. Anuruddha Kariyawasam, Head,
Mr. Channa De Silva, Consultant to SEA

Project Design calculation


Project design calculation and drawings done by Mr. Channa De Silvathrough PVsys simulation

Project Team Members


Ms. J.A.T. Dilhani, Engineering Specialist
Mr. Sooriya Kumara Hettiarachchi, Engineer
Mr. Nuwan Premadasa, Engineer
Mr. Palitha Aberathne
Ms. Thusangi Pelawatta

Prepared by
Draft: Ms. J.A.T. Dilhani
Final Editing: Mr. Chamila Jayasekara

2
Executive Summary

Sri Lanka expects to make the maximum use of renewable energy potential in the country,
with a long-term target of realizing 100% renewable energy by 2050. Solar energy is the
most promising energy source that will contribute towards this. Large-scale solar power
development as solar parks has been introduced by the Ministry of Power and Renewable
Energy as a key initiative in the solar power development programmes. In this approach,
lands that are difficult to be used for agriculture or other economic development activities
are used for solar power generation. Accordingly, the first 100 MW solar park project is
going to be implemented in the Monaragala district. Sri Lanka Sustainable Energy Authority
(SLSEA) and the Ceylon Electricity Board (CEB) are implementing this. The project will be
launched in 2019 and will be completed in 2020. The total estimated cost of the project is
LKR 17 billion. It will deliver 180 GWh of clean energy annually at a 20% plant factor. The
project will reduce the annual fossil fuel imports bill by LKR 56.5 billion during the 20 years
of project life at LKR 19.00/kWh average cost of fuel used for power generation. Further, it
will save 147,542 tons of CO2 throughout the project period, thus leading to support the
Nationally Determined Contributions (NDCs) under the international environmental treaties.

SLSEA, in collaboration with the Forest Department and the Monaragala District Secretariat
have identified land areas of 500 acres for the project. The project location is in 124
Wattegama Grama Niladhari Division in the Siyambalanduwa Divisional Secretariat of the
Monaragala district. It is a shrub jungle belongs to the Forest Department, about 3 km air
distance from Wattegama, about 15 km from the Monaragala town. There are no large
trees available in the particular land areas, and therefore the project can be implemented
with the minimal cutting down of trees. Forest Department has consented for releasing the
land for the project subject to land use committee approval and environmental approval.

Through the implementation of solar parks, it is expected to attract high end investors with
high quality products of latest solar power technologies at competitive rates. So, it will
create direct economic impact to the country. The project will provide information to the
country on implementing large-scale renewable energy parks that will be of high importance
for future projects of the same kind.

3
1. Background of Power Sector in Sri Lanka

Sri Lanka is a small island of 65,610 km2 land area having a population of 20.95 Million with
a growth rate of 0.9%. As per the energy data of CEB, the peak electricity demand is 2,500
MW and the installed capacity is 4,078 MW. The per capita electricity consumption is 628
kWh with a growth rate of 6%. Total electricity generation in year 2017 was 14,671 GWh.
Country’s national electrification level is almost 100% with 24 hrs uninterrupted electricity
supply, which is a very attractive status compared to the regional situation. Major hydro
power plants, thermal power plants using fuel oil or coal and New Renewable Energy (NRE)
plants using mini hydro resources, solar, wind and biomass are the different types of power
plants catering to the present electricity demand. Details of the existing power plants are
given in Table 01. Power generation facilities for meeting the increasing electricity demand
are implemented according to the Long-Term Generation Expansion Plan of CEB.

Table 01: Details of existing power plants

4
2. Development of NRE Resources

Sri Lanka has been predominantly dependent on large hydro power plants until 1990s. With
the increase of the electricity demand in the country, fuel oil and coal have been introduced
for the electricity generation mix. With the introduction of mini hydro power plants in 1996,
Sri Lanka initiated the use of NRE sources, and it has surpassed 600 MW in 2018. Expansion
of NRE capacity addition is shown in Figure 02.

600

500

400
Cumulative Number of
300

200

100

0
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017

Year

Figure 01: Expansion of NRE capacity addition

The initial NRE target was to achieve 10% of the total electricity generation by 2015. It was
successfully realized, where the major contributor was small hydro power projects. Share of
renewable energy (large hydro and NRE sources) in electricity generation in 2016 was 32%,
whereas in a wet year like 2013 the share is 60%. NRE capacity addition for the future
periods has been planned with the vision of realizing Carbon neutrality by 2050. Even
though hydro is the major resource in the overall renewable energy share at present, its
potential for future expansion will be limited as most of the large hydro resources as well as
small hydro resources country in the country have been exhausted. Within this situation,
the major sources identified for future NRE development are solar power and wind power.
Pimarily, these energy sources have high potentials owing to the geographical positioning of

5
the country, and rapid developments of these energy technologies are taking place at
international level. So, both these facts herald the possibility of using the particular
resources in fairly high potentials towards meeting the future electricity demands. As far as
the solar resource is concerned, as Sri Lanka is located in the equatorial belt, it receives a
year-round supply of solar irradiation. So, many parts of the island have satisfactory solar
resource potentials.

3. Solar Power Development in Sri Lanka

SLSEA published solar atlas in year 2009, and continuous solar irradiation measurements are
being carried out in different parts of the country in order to facilitate large scale solar
power development through availability of comprehensive ground level data on long-term
basis.

Figure 02: Solar Radiation Measuring Station

6
There has been gradual development of solar power projects in the country with the
information of solar resource being published. The first intervention for implementation of
projects was made by the Government with the introduction of net-metering concept in
order to facilitate absorption of solar rooftop based power to the national grid. The concept
moved to gain ground in the country after a sluggish start as shown in Figure 03.

10,000 50
9,000 45
8,000 40
Number of Connections

7,000 35

Capacity MW
6,000 30
5,000 25
4,000 20
3,000 15
2,000 10
1,000 5
- 0
2010 2011 2012 2013 2014 2015 2016

Connections Capacity MW

Figure 03: Growth of rooftop solar PV market

In September 2016, a crash programme was introduced as Soorya Bala Sangramaya (Battle
for Solar Power) to fast track the solar rooftop programme. Along-with this initiative, the
net-metering scheme was further developed to include two more options, allowing the
customers to get paid for excess energy exported or to export the full generation as a micro
power producer. There have been more than 17,000 roof top projects with a total capacity
of 130 MW by 2018, where a capacity of 100 MW has been installed within the first two
years of implementation of Soorya Bala Sangramaya.

Parallel to the introduction of rooftop concept, a pilot project which utilised KOICA grant aid
was deployed in deep down south with a capacity of 500 kW in 2011. Another plant was

7
also built under a Japanese grant, adding 737 kW to the national grid in 2012. The first
commercial scale plant with a 10 MW capacity was implemented and commissioned in
December 2016. Today, the grid connected commercial scale projects developed in the
Hambantota and Polonnaruwa districts by the private sector add 50 MW to the national
grid. These projects were developed under a feed-in-tariff of LKR 23.10 per kWh. With the
solar power technologies becoming highly competitive in the international market, solar
power projects are now entertained on competitive bidding process. Solar power projects of
1 MW capacity and 10 MW capacity have been initiated through bidding process,
significantly lower tariffs compared to the prevalent feed-in-tariff have been offered in the
proposals that have been received.

Table 02: Solar power tariffs in the bidding process

Capacity Year Tariff /LKR/kWh


1MW 60Nos 2017 12.73 -18.37
10MW 2Nos 2017 11.86 -12.49
1 MW 90 Nos 2018 12.37 18.26

Recognizing the fast development of solar power projects in the country, 400 MW capacity
addition of solar power by 2020 and 1,000 MW by 2025 have been included in the Long
Term Generation Expansion Plan 2018-2037.

8
Figure 04: Present solar power projects in Sri Lanka

9
4. Recent Trends in Solar Power Development in the World

In the recent decade, the world has seen consistent growth in solar power due to the
advances in technology and its becoming more readily available in different contexts and
applications worldwide. Solar power installation systems totalling more than 97 GW in 2017
took global solar PV power generating capacity to nearly 400 GW, a 32% increase compared
to the previous year. China has the highest cumulative installed capacity of solar power (130
GW), with one-third of the global total. The US (51 GW) and Japan (49 GW) are in second
and third with Germany (42 GW) now in fourth.

Most of solar power development in the world has been achieved through solar park
concept. The Pavagada solar park in India expected to produce 2,000 MW of electricity,
enough to power 700,000 households is the latest milestone in India's transition to
generating more green energy.

Figure 05: Pavagada solar park in India

The Kamuthi solar facility in Tamil Nadu, has a total generation capacity of 648 MW.
Covering 2,500 acres (10 sq km) and consisting of 2.5 million solar panels, the site is
estimated to generate power adequate for 750,000 people. Completed in September 2016

10
at a cost of approximately US$ 679 million, the station was built in just eight months. The
plant is cleaned every day by a robotic system.

The Longyangxia solar park has a total capacity of 850 MW, sufficient to power 200,000
households. The site sits on the Tibetan Plateau in northwestern China’s Qinghai province,
and is operated by State Power Investment Corporation, one of China’s top five power
generators. Phase I was completed in 2013 and Phase II was completed in 2015, with a total
construction cost of around 6 billion yuan (US$ 920.84 million).

Figure 06: Longyangxia solar park

Kurnool solar park covers 5,932.32 acres (24.0072 sq km) in the Kurnool district, Andhra
Pradesh, with a total generating capacity of 1,000 MW. Construction costs were around US$
1 billion. Over four million solar panels were installed in the park, each with a capacity of
315 W or 320 W. On sunny days, the site is able to generate more than 8 million kWh of
electricity, sufficient to meet virtually the entire electricity demand of the Kurnool district.

The Tengger solar park, located in Zhongwei, Ningxia, is currently the largest PV plant in the
world in terms of both size and production. Dubbed the ‘Great Wall of Solar’, it covers 1,200

11
km of the 36,700 km Tengger desert, occupying 3.2% of the arid region. The site’s output is
1,547 MW of power.

Figure 07: Tengger solar park

6. Proposed 100 MW Solar Power Park

With the background that solar power has laid a strong foothold in the electricity generation
in the country, it is very important to obtain maximum economic benefits from the
particular resource. Under the solar park concept, project developers are provided with
properly allocated land areas with infrastructure including access roads and transmission
lines, access to amenities like water, initial project requirements like environmental
clearances related to project implementation. Thus, it will create a reduced-risk project for
the investors, whereby it will facilitate attracting renowned solar power development
companies with competitive prices. Accordingly, the new development approach aims at
developing the promising solar resource at a substantially lower cost, reaching grid parity
and with minimum operational impact to the national electricity grid.

12
The first solar park project is going to be implemented in the Monaragala, with a capacity of
100 MW. The particular solar power capacity has been included in the Long Term
Generation Expansion Plan of the CEB. It has been decided considering the good solar
resources and availability of grid access. It is reported that many grid substations are already
overwhelmed with power produced by renewable energy projects and the system operators
are finding it difficult to accommodate more non-dispatchable embedded generators in the
national grid. The decision to select the Monaragala grid sub-station was made as it is a
relatively easier point to absorb more embedded generators to the particular grid sub-
station.

13
14
Figure 08: Solar radiation and likely energy yields maps of Sri Lanka
(Source – Solar Atlas of Sri Lanka – Sri Lanka Sustainable Energy Authority)

15
The project is going to be launched in 2019 and will be completed in 2020. The total
estimated cost of the project is LKR 17 billion.

7. Objectives of the Project

• To add 100 MW of solar power to the National Grid out of 400 MW target by 2020
recommended by the LTEGP 2018–2037
• To get least cost price to a solar park by centralizing 100 MW power park to one
location through making grid substation and other facilities
• To reduce the tariff in competitive bidding process to maximize the economic
benefit to the country
• To reduce CO2 emissions in electricity generation in order to support Green House
Gas (GHG) emission reduction targets under the Nationally Determined
Contributions (NDCs) in the energy sector

8. Project Location
Site Selection
The suitable project site was able to select with the site visit done with presence of
honourable secretary Dr. B.M.S. Batagoda, ministry of power and renewable energy along
with senior officers of forest department and SLSEA on 8th August 2018.

Figure 09: Pictures of the selected site

16
The area selected is a shrub jungle belongs to the Forest Department. It is a flat non-arable
land situated in a mountain area. So, it is a location which is not possible to be used for
agriculture purposes or for any other economic activities. When selecting the lands,
priorities were given to reduce the number of cutting trees and avoiding the elephant paths.
With the objective of creating the least impact, 10 land blocks (10 MW each) of 50 acres
have been selected. Identified land blocks shown in a GIS map is depicted below. Project
development will be done as 5 Nos. of 20 MW projects combining two adjacent 10 MW
blocks under each. The maps are attached in Annexure 1,2,3 and 4 and more photos are
attached in annexure 5

9. Renewable Energy Potential

The climate in Monaragala is classified as tropical. In Monaragala, the average annual


temperature is 26.3 °C. About 1603 mm of precipitation falls annually. Precipitation is the
lowest in June, with an average of 10 mm. The greatest amount of precipitation occurs in
November, with an average of 289 mm. At an average temperature of 27.4 °C, May is the
hottest month of the year. The lowest average temperatures in the year occur in January,
when it is around 24.6 °C

Table 01: Variation of solar irradiation

Month kWh/m2/day
January 5.11
February 5.92
March 6.39
April 6.28
May 6.28
June 5.92
July 6.03
August 6.17
September 6.28

17
October 5.81
November 5.47
December 4.89

Figure 10: Rainfall and temperature variation in Monaragala district

10. Technical and Organizational

The most efficient solar panels commercially available today have surpassed 20% efficiency,
and this type of efficiency improvement has supported to have high power rating ranges.
Therefore, in order to ensure that the project will have solar panels with high efficiency
ranges, the install power rating range of 300 W – 350 W and power tolerance as +/- 5%.
This will support towards maximizing savings and reduce the payback period of the project.
Further, in order to ensure that temperature increases will make low impacts on electricity

18
generation, panels with less sensitive temperature coefficients will be promoted in the
project. This will be important as many general solar panels may produce 1 percent less
electricity for every 4°F temperature increase above 77°F (25°C), which is the standard
temperature at which tests are performed.

Further, solar panels should be compliant with standards for the manufacturing of solar
cells: ISO 9000 series and Solar panel durability standard IEC 61215, which comply with
International Electro-technical Commission’s (IEC’s) 61215 reliability standard and also
manufacturer’s warranty of preferably 25 years.

19
11. Project Activities
Pre Implementation Tasks by SEA 2019 2020 2021 2022
Project Devel opment Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Preliminary studies- Compleated
Pre feasibility study- Completed
Land survey
Environmental Impact Assessment
Project Fi na nci ng
Project fiancial structuring
Infra s tructure Devel opment
Land acquisition
Land clearing
Establishment of weather station
Water resource investigation and establising 5 tube wells
Improvements to access roads
Construction of new roads
2019 2020 2021 2022
Project Awa rd - by CEB Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Procument Activities and project awards by CEB
Power Tra ns mi s s i on - by CEB
Transmission design
Plotting transmission trace
Augmentation work Siyambalanduwa GSS
Construction of 132kV line
In-farm collector substation construction
In-farm 33kV line construction
Project Iml i mentation by s el ected devel opers
Civil Works
clearing and transport
comitioning

20
12. Project Costs
Description Cost (LKRM)
Project Development by SEA
Approvals 15,356,000.00
Water supply with 5 tube wells 3,527,625.00
Road construction (10km) 150,000,000
Survey 3,000,000.00
Weather station 5,000,000.00
Land clearing and improve access RD 3,000,000
Internal RD 45,750,000.00
Temperary accomodation for project staff and site visits 8,000,000
Other 14,018,017.50
sub total 247,651,642.50
Land by FD
Land valuve 1,200,000,000.00
Project Implementation by Developers
Project Implimentation 12,021,000,000.00
Power system by CEB
Grid Substation 1,365,000,000.00
Total 14,833,651,642.50

IRR and NPV of the project were determined assuming the following.

• Project capacity 100 MW


• Project period 20 years
• Plant factor 18%
• Efficiency reduction 85%
• Operation and Maintenance cost 1%
• Project cost LKRM 14,833
• Tariff through project life – 14 (assume)

Project IRR 13%, NPV: LKRM 2575 and payback period is 7.34 years

21
13. Project Benefits

The project will deliver 180 GWh of clean energy annually at 18% plant factor and saving of
4.2 LKRB at an average fuel cost of power generation of 19.00 LKR/kWh. The proposed
project will save 147,582 tons of CO2 annually. The proposed approach where the project
infrastructure is developed by the Government and giving opportunity to the private sector
for project implementation will reduce the cost of solar electricity. The lesser cost of solar
electricity will provide a future direction to mainstream solar electricity in the electricity
generation expansion planning.

For the private sector project developers, the proposal will provide a hassle-free investment
opportunity, and an early solution to the present issues resulting from grid constraints. For
local financial services industry, sizable investment opportunities which will enhance their
green credentials, whilst earning them a sound return on investment will be there. Apart
from the financial services industry, other companies who wish to invest in the project too
would enhance their visibility in a sustainability initiative, and will earn good returns on
investments whilst bolstering their CSR efforts and green credentials.

14. Project Design

14.1 Technical Assessment


The concept of this solar power park project is to pre develop and facilitate by the
government sector in order to finance and implement the project by selected privet party
through tendering procedures. It is proposed to develop the infrastructure of the selected
site and get the environmental approval and energy permit and tender 20MW five blocks to
select one or more Privet parties. A one project proponent can develop one block of 20MW
or totally five blocks as 100MW. In this scenario since the tariff, technical details of solar
systems and exact project cost are unknown factors it is difficult to find technical
parameters: No. of panels, no. of inverters and economic parameters project IRR, NPV
sensitivity analysis ect. However, with some assumptions it is expected to give some desing
parameters.

22
It is expected to fulfil following technical conditions by the project implementing agency

Panel quality
• Efficiency
• Quality
• Ratings
• Performance
• Manufacturer

14.2 Technical parameters to be fulfilled


Solar panel power rating and performance
All solar panels receive a power rating based on the amount of direct current (DC). Ratings
are expressed in watts and represent the power the panel produces under ideal lab
conditions. Most solar panels on the market today have power ratings that range from 200
to 350 watts. The particular project need to install power rating range in 300 – 400 watt In
order to maximize savings and speed up the payback period of the project

As solar panels are manufactured, some unavoidable variations that impact power output
are introduced. Power tolerance indicates how the power output of a solar panel might
differ from its nameplate rating. Typically expressed as a plus-or-minus percentage and solar
panels need the power tolerance as +/= 5%

Solar panel efficiency represents how effectively a solar panel can convert solar radiation
(e.g. sunlight) into electricity. The most efficient solar panels commercially available today
have solar panel efficiency just above 20%.Therefore, recommended solar cell efficiency for
this project is 20% in order to produce more kilowatt-hours of energy per watt of power
capacity

Although solar panels are designed to love the sun, high heat can actually reduce a solar
panel’s capacity to generate power. The temperature coefficient quantifies how a panel’s
power capacity decreases at temperatures higher than 77°F ( 25°C), which is the standard

23
temperature at which tests are performed. For example, many standard grade solar panels
may produce 1 percent less electricity for every 4°F temperature increase above 77°F.
Panels with less sensitive temperature coefficients will require for the project.

Solar panels should be compliant with standards for the manufacturing of solar cells: ISO
9000 series and Solar panel durability standard IEC 61215 which comply with International
Electro technical Commission’s (IEC’s) 61215 reliability standard in order to evaluates panels
by performing stress tests simulating the decades of outdoor wear and tear that solar
panels encounter during their lifetime. These tests are designed to identify potential
premature failure problems with solar panels, and panels that meet the standard are more
likely to survive in the field. Mean time wind can apply strong pressures to the surface of
solar panels. The higher a solar panel’s wind load ratings, the better it is at tolerating these
forces.
Solar panel manufacturer assurances

Manufacturers’ warranties are an important complement to solar panel efficiency, quality,


and durability metrics, because they indicate both technical specifications and business
practices. In the unlikely event that a solar panel problem occurs post-installation, a strong
warranty ensures that your service and support needs will be covered at least 25-year
power production warranty

The amount of electricity a solar panel can produce declines slightly every year, with the
most significant decline happening in the first year. This is typically referred to as “panel
degradation.” Many solar panel manufacturers provide a power production warranty
guaranteeing that their panels will retain a certain percentage of their production capacity
over the first 25 years, usually no less than 80 percent. For this metric, a higher percentage
guarantee is preferable to a lower percentage. Manufacturers also often provide a specific
guarantee that output will only decline by a certain amount (generally no more than 0.7
percent) in a single year, known as the degradation rate. For this metric, a smaller
percentage is better than a larger one.

24
Materials warranty

The materials warranty guarantees against failures due to manufacturing defects, durability,
and environmental issues. Most solar panel manufacturers guarantee that their panels will
not fail for 10 to 12 years, and some extend their materials warranty even further. Make
sure you pay attention to the fine print – some materials warranties will cover the shipping
and labor costs associated with replacing a panel, but others may require you to pay those
expenses.

14.3 Design of the power plants with some assumptions

Design calculations were done for 20MW system with comprehensive simulation using PVSyst which
is considered as the most popular third party simulation software in the industry.

with some assumptions

– PV Model : Si-mono
– Data considered : Meteonorm 7.1
– Collector Plane Orientation : Tilt 10° @ Azimuth 0°
– No Shadings
– Unit Nom. Power 375 Wp
– Losses
• Array Soiling Losses 3.0 %
• Thermal Loss factor
• Uc (const) 29.0 W/m²K Uv
• (wind) 0.0 W/m²K / m/s
• Wiring Ohmic Loss Global array res. 0.25 mOhm Loss Fraction 0.4 % at
STC
• Serie Diode Loss Voltage Drop 0.7 V Loss Fraction 0.1 % at STC
• LID - Light Induced Degradation Loss Fraction 1.0 %
• Module Quality Loss Loss Fraction 1.5 %
• Module Mismatch Losses Loss Fraction 1.0 % at MPP
• Strings Mismatch loss Loss Fraction 1.50 %
• Module average degradation Year no 1 Loss factor 0.4 %/year

25
• Mismatch due to degradation Imp RMS dispersion 0.4 %/year Voc
dispersion RMS 0.4 %/year
• Incidence effect, ASHRAE parametrization IAM = 1 - bo (1/cos i - 1) bo
Param. 0.05
• Solar panel 375 Wp
• (Mono Crystalline Half Cut) 53336 nos
• 8 nos Inverters of PVS 980-58-2091kW MWS Inverter characteristics
978-1400 V

As per the design calculations Specific energy production per year is 1470 kWh/kWp/ for 20MW plant with

performance ratio of 78.2%

26
As per the simulation estimated power generation for 20MW system is given in following
figure

Fig. Estimated generation for 20MW power plant system

27
Fig. Lay out diagram for 20MW power plant system

28
Fig. 3D desing 20MW power plant system

14. Socio-economic Assessment

The site and surrounding area do not have any settlement and as such, the project does not
involve any displacement of communities. As there will be 100 direct jobs and also indirect
job opportunities through the project, it will support the economic upliftment of the local
population. Further, through electricity generation using indigenous renewable energy
sources, the project will contribute to the overall economic development of the country
through reduction of thermal power generation.

The project will provide much needed clean energy to the South-Eastern region, and will
also improve the infrastructure of the area by way of enhanced electricity supply and
improved roadways. It is envisaged that this inclusive approach will greatly reduce socio-
political barriers which may arise out of the project.
29
15. Environmental Consideration

An Initial Environmental Assessment (IEA) will be carried out by Central Environmental


Authority and the Forest Department.

30
16. Implementation Arrangement

The project shall be implemented by SLSEA and CEB as a Public-Private Partnership Project.
SLSEA shall develop the infrastructure such as preparation of road network and other
facilities while CEB will arrange implementation of grid substation at the site. Developers for
project implementation will be selected through competitive bidding process.

References:
https://www.power-technology.com/features/the-worlds-biggest-solar-power-plants/

31
Annexure 01 map

(Source – Google Earthhttps://www.google.com/earth/)


Figure 4 – Project location

32
Annexure 02map

33
Annexure 04 Annexure 05map

Figure 5 – Project location (extracted from 1:50,000 map)


(Source – Survey Department of Sri Lanka)

34
Figure 6 – Access Road

35
Figure 7 – Some pictures of project location

36