You are on page 1of 1
DOCUMENT No. ENGINEERS ASAT INSTRUCTIONS TO BIDDERS Agez-s0.42TREstt Pago 8 of 8 - Sub orders. - Purchase of materials such as plates, pipes, forged flanges, bolting, gaskets, etc. = Start of fabrication of dished ends and shell, welding of shell and heads. = Welding of nozzles and external attachments such as cleats ete. - Phased program of shopisite fabrication of equipment section, shop assembly, testing and dispatch to site This planning shall be established to extend from purchasing of equipment components to the end of fabrication and delivery of equipment, 47. . n 1 ied hall tabul 1 detaiLas-per following table: PlateNed — Material Size-of Plate Equipment RefDwg Rat Platemark Specification ThkxWidthxLonglh Number Ne numborand frp ay: Sizeof Plate Heal Plate Weight Used plate Burnout Pike Wideh- Length sample (Kas) weight {Kgs} tosses eM umber Kes) Returnablecficut —Relunableoffewt Nen-returnable- serap Remarks size-with sketch weightikgs) weight{Kgs-) singe and dub Jb Lott turaabl pall be 18. Words “fabricator”, ‘vendor’, “contractor” appearing anywhere in the MR/Specifications/ Standards ete. shall be read as "bidder’. 19. Bidder to note that interference of nozzles with circumferential seams is not acceptable. Vendor to take suitable care to avoid fouling of extemnalinternal attachments with shell seams. 20. Standard Inspection and test plans are altached with requisition for guidance. Vendor shall submit inspection test plans for the approval of visiting inspection engineer. Inspection shall take care of all the requirements of specifications. Inspection engineer has the authority to modify the plan depending on the criticality of the item, 24. In the event of conflict, most stringent requirement in following order of precedence shall gover Format No, El. 1647-1924 Rev. + (Copyright EL — Al ighs osewor

You might also like