QAQC INSPECTION REPORT

PROJECT LHP INFRASTRUCTURE


WORK SECTION TEMPORARY DRAINAGE/EROSION CONTROL
DATE 15 – 08 - 2023

Excavation for storm water path/channel. Excavation for storm water path/channel.

Blocked drainge path

Rhema Project BCEGI| RC 397983


33, Immam Dauda Street, off Eric Moore Road, Surulere, Lagos|
www.rhemaprojectng.com| +234 (1) 460 0800
LOGISTICS HUB, KETU-EREYUN – QAQC Inspection Report

GENERAL NOTES/OBSERVATIONS
1. It was observed that the excavated path was not compacted, hence the soil on the drainage part
is loose.
2. The drainage ring along the path is blocked.

RECOMMENDATIONS
1. The surface of the excavated storm water drainage path should be compacted to prevent rainwater
pushing more sand into the channel.
2. The earth inside the blocked channel should be removed otherwise, it will be a wasted effort.

Yours sincerely,

SALAMI Rahman Babatunde


QAQC Engineer