Introduction. Scope.
The department of Estimating & Costing helps to predict Estimating for Earthwork for Project Zone A
the quantity, cost, and price of the resources required to Development
complete a job within the project scope. Cost estimates
are used to bid on new business from prospective
clients and budget planning process.
Methodology.
EARTHWORK SPECIFICATION
To provide the earthwork specification for
MACHINERIES
The machineries used in this construction
project is excavator, bulldozer, dump truck,
lorry, compactor and grader.
3
METHOD STATEMENT
➢ The purpose of this method statement is to specify the proposed cost
estimation for the earthwork specification to ensure that the planned
materials and workmanship to be used at the site are complying with the
2 condition / requirement as specified in the specification.
➢ This method statement will be use as controlling element for project zone
A by Patagonia Sdn Bhd.
COST ESTIMATION
A complete information for construction
Work Schedule.
cost of specific work in earthwork
specification.
4
Activity 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Briefing
Calculation of quantity of work
Method Statement
Proposal of machineries
Poster submission
Calculation of unit rate
Calculation of total earthwork
Proposal of new formation levels
Compile report
Video presentation
WATER RETICULATION
16
RT
18' x 65'
RT
18' x 65'
16
16 12
13
RT
18' x 65'
8
RT RT
16 18' x 65' 16 12 18' x 65' 10
16 RT 16 RT 12 9
18' x 65' 18' x 65'
16 RT
18' x 65'
RT
18' x 65' 16
16 RT
18' x 65'
12
12
RT
18' x 65'
9
12
16 RT 16 20' RT 12 14
18' x 65' 52.25 Ha 18' x 65'
PE PE
RT
18' x 65'
10
10 12
12
RT
18' x 65'
RT
14
Kawasan Lapang
7.205 ek.
maintenance .
8 18' x 65' RT
10 12
18' x 65'
14 TDK
8 RT 0.33 ek. Loji Najis Mekanikal
10 12 2.61 ek.
18' x 65' RT 14
18' x 65'
RT
8 18' x 65' RT
SAJ P
8 RT 10 12 RT
18' x 65' Dewan Serbaguna
IPELIN
18' x 65' 2.00 ek.
RESEE
RVE
Sekolah Rendah
6.00 ek.
Masjid
RK KT TDK 166156
32' x 70' 0.52 ek. 0.30 ek.
1.11 Ha
20'
RMB D
265 unit / 4.417 ek.
campuses, etc .
RK KL RMB B
32' x 70' 1.283 ek. 90 unit / 1.292 ek.
RK PE
32' x 70'
3010
KL
PE 1.210 ek.
WATER DEMAND
• Water demand is defined as the total
amount of water needed by tenants
in a certain living space.
• The total water demand for this area
is 3,186,340 L/day with average flow
of 36.88 L/s
• The peak flow rate is 92.20 L/s and
the highest daily water demand is
from the 2-storey terrace house
1,371,000 L/day.
3
BWL
3435 m a height of 6m.
• The total volume of the tank is
27000 3
3,435𝑚 so it is enough to cover the
Dimension of Water Tank water demand .
Temporary Structure Function Location Diagram