EARTHWORK DEPT.

ESTIMATING DEPT. ESCP DEPT. WATER RET. DEPT.


EARTHWORK
Person-in-Charge:
NUR FAIQAH BINTI NGAH SERON A18KA0118
NUR SARINA BINTI AZAHAR A18KA0123
CHARLTON CHONG JING KANG A18KA0017

SITE INVENTORY & ANALYSIS PROPOSED LEVEL


• Site inventory is the initial step in design The proposed level was set based on the exi sti ng
process that will be used to access existing topography of the site area. The proposed level for each
conditions and determine how they will affect zone was determined by the point of the particular zone
the future design process; how or if they will or height and generally the formation level is the average
should change. Site inventory are performed reduced level of these particular points in order to balance
early in design process to gather useful and the cut and fill that can minimize the import of soil
high-quality information that is used during material and in turn reduce the overall cost of
the site analysis. construction. Besides, the information needed for the
• Site analysis is divided into two stages. First, initial stage of design includes contour, position of building
research phase is to define the problem that to be build, position and the level of available road and
will impact the smoothness of the construction. drainage and the boundary of the site.
Second, analysis phase is to focus on
determining the solution to overcome the
problems or obstacles.

Highest Invert Level

Earth Drain
Earth Road
Open
Hall
SAJ Marker
Concrete
Bridge
Earth Drain
Store
Culvert

Valve Chamber

BENEFICIAL EFFECTS

 Existing of earth drain can prevent water accumulation that


TBM
Exposed may cause flooding by directing the water away from home.
Water Pipe
It is also can prevent accumulation of stagnant water.
Old Concrete
 Level of the site is suitable to develop water supply because
Mark
there is highest point which can let the water flow by gravity
to the lowest point.
Lowest Invert Level
Azizah Azrin

Estimating & Costing A18KA0013

Ros Sakinah Alya

Department A18KA0147

Introduction. Scope.
The department of Estimating & Costing helps to predict Estimating for Earthwork for Project Zone A
the quantity, cost, and price of the resources required to Development
complete a job within the project scope. Cost estimates
are used to bid on new business from prospective
clients and budget planning process.
Methodology.
EARTHWORK SPECIFICATION
To provide the earthwork specification for

1 the project site that comprise site


clearing, excavation and transportation of
topsoil, cut and fill work, disposal of
excess soil and slope stabilization.

MACHINERIES
The machineries used in this construction
project is excavator, bulldozer, dump truck,
lorry, compactor and grader.
3
METHOD STATEMENT
➢ The purpose of this method statement is to specify the proposed cost
estimation for the earthwork specification to ensure that the planned
materials and workmanship to be used at the site are complying with the
2 condition / requirement as specified in the specification.
➢ This method statement will be use as controlling element for project zone
A by Patagonia Sdn Bhd.

COST ESTIMATION
A complete information for construction

Work Schedule.
cost of specific work in earthwork
specification.
4
Activity 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Briefing
Calculation of quantity of work
Method Statement
Proposal of machineries
Poster submission
Calculation of unit rate
Calculation of total earthwork
Proposal of new formation levels
Compile report
Video presentation
WATER RETICULATION

Muhamad Asri Bin Rosli (A18KA0073)


Ahmad Siddiq Bin Nor’Azua (A18KA0005)
Water Inlet
WATER INLET
PIPE WATER ANALYSIS
• Closed looped pipe network is used 16

16
RT
18' x 65'

RT
18' x 65'
16

16 12
13

RT
18' x 65'
8

to analyze the reticulation pipelines


16 RT 16 20' RT 12 9
18' x 65' 18' x 65'

RT RT
16 18' x 65' 16 12 18' x 65' 10

16 RT 16 RT 12 9
18' x 65' 18' x 65'

for most of the buildings in the 16

16 RT
18' x 65'
RT
18' x 65' 16

16 RT
18' x 65'
12

12
RT
18' x 65'
9

12

project. By using this network, water


RT RT
16 18' x 65' 16 12 13
18' x 65'

16 RT 16 20' RT 12 14
18' x 65' 52.25 Ha 18' x 65'

PE PE

supply could reach to every building 8


RT
8 18' x 65'
PE

RT
18' x 65'
10
10 12

12
RT
18' x 65'

RT
14
Kawasan Lapang
7.205 ek.

if a part the pipeline is closed for


14
18' x 65'
RT
8 18' x 65' RT
10 12
18' x 65'
14
PPU
8 RT 0.52 ek.
10 12
18' x 65' RT 14
18' x 65'
RT

maintenance .
8 18' x 65' RT
10 12
18' x 65'
14 TDK
8 RT 0.33 ek. Loji Najis Mekanikal
10 12 2.61 ek.
18' x 65' RT 14
18' x 65'
RT
8 18' x 65' RT

• This systems suitable variety of


10 12
18' x 65'
14 KH
8 RT 10 12 KH
18' x 65' RT 11 0.681 ek.
18' x 65'
RT
8 18' x 65' RT
10 12 18' x 65' 9

SAJ P
8 RT 10 12 RT
18' x 65' Dewan Serbaguna

different consumers such as housing


7

IPELIN
18' x 65' 2.00 ek.

RESEE
RVE
Sekolah Rendah
6.00 ek.

Masjid

estate, offices and factories with


RK 2.00 ek.
32' x 70'

RK KT TDK 166156
32' x 70' 0.52 ek. 0.30 ek.
1.11 Ha
20'

many building, college or university


Rizab Parit 6.5m
3003
4.0519 Ha
RK Sekolah Agama
32' x 70' 1.50 ek.

RMB D
265 unit / 4.417 ek.

campuses, etc .
RK KL RMB B
32' x 70' 1.283 ek. 90 unit / 1.292 ek.

RK PE
32' x 70'
3010
KL
PE 1.210 ek.

RMB A RMB B RMB C 166158


133 unit / 1.900 ek. 175 unit / 2.495 ek. 1.881
265 unit Ha
/ 4.417 ek.
Kolam Takungan
3.68 ek.
Kolam Takungan
0.66 ek.

WATER DEMAND
• Water demand is defined as the total
amount of water needed by tenants
in a certain living space.
• The total water demand for this area
is 3,186,340 L/day with average flow
of 36.88 L/s
• The peak flow rate is 92.20 L/s and
the highest daily water demand is
from the 2-storey terrace house
1,371,000 L/day.

WATER TANK DESIGN


Lightning
Arrestor R.C
• From the total water demand we can
Water Ventilator
Gauge Lantern
Window design the size of water tank.
TWL
• The shape of the water tank is R.C
water tank with a diameter 27m and
6000

3
BWL
3435 m a height of 6m.
• The total volume of the tank is
27000 3
3,435𝑚 so it is enough to cover the
Dimension of Water Tank water demand .
Temporary Structure Function Location Diagram

Silt Fence To control sediment form Placed along elevation


small disturbed areas. contours and as
perimeter control.

Berms Slows sediment-laden Usually built along the


water and filters planned construction
sediment in low-flow site.
areas.

Sediment Basins Small basins used for Placed at the lowest


drainage areas. point to receive
maximum amount of
runoff from the site

Dewatering/ Remove water from Near runoffs catchment


Pumping excavated areas/provide area or sediment basins
storage room in a
sediment basin before
rain event.