QAP NO.

: QAP/ENERGY/245KV GISTERM-I
REV. : 00
QUALITY ASSURANCE PLAN FOR DATE: 14.06.2022
245 KV GIS TERMINATION PAGE 1 OF 1

Type of Quantam Requirement Acceptance Agency


Sr.No Component Properties Remarks
Check of check as per spec Norms M C
Final Inspection

1 Female Insulator a Quantity Verification 1Sample/Batch As per BOM As per BOM P W


Free from Free from Visual
b Visual (For Damages) Inspection 1Sample/Batch P W
Visual Damage Damage As
2 Seal Plate a Quantity Verification 1Sample/Batch As per BOM per BOM P W
Free from Free from
b Visual (For Damages) Inspection 1Sample/Batch Visual Damage P W
Visual Damage

3 Fixing Ring a Qty Mesmt. 1Sample/Batch As per BOM As per BOM P W


Free from Free from
b Visual (For Damages) Inspection 1Sample/Batch Visual Damage P W
Visual Damage

4 Stress Cone a Quantity Verification 1Sample/Batch As per BOM As per BOM P W


As per As per
b HV-PD Inspection 1Sample/Batch P V
IEC:62067 IEC:62067
Free from Free from
Inspection 1Sample/Batch
c Visual (For Damages) Visual Damage Visual Damage P W
5 Grounding Kit Verification 1Sample/Batch As per BOM As per BOM
a Quantity P W
Free from Free from
Inspection 1Sample/Batch Visual Damage P W
b Visual (For Damages) Visual Damage
6 Cable Gland Verification 1Sample/Batch As per BOM As per BOM
a Quantity P W
Free from Free from
Inspection 1Sample/Batch
b Visual (For Damages) Visual Damage Visual Damage P W
7 Base Kit Verification 1Sample/Batch As per BOM As per BOM
a Quantity P W
Free from Free from
Inspection 1Sample/Batch
b Visual (For Damages) Visual Damage Visual Damage P W
8 Wedge Cone type Verification 1Sample/Batch As per BOM As per BOM
a Quantity P W
Connector Free from
1Sample/Batch Free from
Inspection Visual Damage P W
b Visual (For Damages) Visual Damage

*As per IEC 62067, High Voltage & Partial Discharge Test will be performed on 1 sample during witness, if the offered lot is more than 50 Nos.
Legends: M - Manufacturer / Sub Supplier W - Witness RRPL - Raychem RPG (P) Ltd.
C - Customer/Client, BOM – RRPL BOM/RRPL Packing Slip BOM – RRPL BOM V - Verification
P – Perform, Mesmt. - Measurement Batch - - Total nos of Kits
Prepared By Approved By Approved By Client/Customer

Name Aneesh Rapheal Himanshu Gandhi