You are on page 1of 2

Date : 20-05-2023

FINAL INSPECTION REPORT


P. : 1/ 2

Inspection No. : 2305-0-18453 Inspected By Yissel Osorio (Fty QC)


Supplier : SAE-A TRADING CO., LTD. Factory : EINS S.A.

Buyer PM No PO Style Shp# Product Ord Qty Insp Qty Merchandiser

BOYS 57% COTTON 43%


KOHL'S INC 23-KKOHLC1-4249 14521828 UJ32K129GN 1 POLYESTER KNITTED 4284 UNT 4284 UNT STELLA LEE
PULLOVERS

BOYS 60% COTTON 40%


KOHL'S INC 23-KKOHLC1-4249 14521828 UJ32K129GS 1 POLYESTER KNITTED 4662 UNT 4662 UNT STELLA LEE
PULLOVERS

TTL 8946 UNT 8946 UNT

COUNTRY OF ORIGIN (Y/N) Yes OPA # (Y/N) N/A

Late / Non Working Hour Inspection? N/A No. of carton shipped 994

Product Lab Test Report Result


Inspection Type Onsite Pass

Fabric KWIQ - Test Report Available


Lab Test Report No. GUAT23012013 (Yes/No) If No please specify Yes

Fabric KWIQ Remarks : Fabric Mill Garment KWIQ - Test Report


Name (Mandate) &/or Others Available (Yes/No) if No please Yes
specify

Garment KWIQ Remark – Please


specify

Critical Critical
Major Minor Major Minor

Defect Group : Visual Check TTL

Workmanship <Packing Check> Final TTL

Distorted / Poor shape


- Neck / 4

Sampling Plan : Single Defect Group : Measurement Check


Sampling Level : Normal
Inspection Level : II

Sample Size : 200


AQL 0 2.5 N/A Measurement
Max Def. Qty 0 10 N/A

Measurement out of tolerance larger than


TTL 4 spec 1
- Neck width /

Sampling Plan : Single


<Visual Check> Final TTL 4 Sampling Level : Normal
Inspection Level : S-4

Sample Size : 32
AQL 0 2.5 N/A
Max Def. Qty 0 2 N/A

Defect Group : Packing Check TTL 1

Sampling Plan : Single


Sampling Level : Normal <Measurement Check> Final TTL 1
Inspection Level : S-3

Sample Size : 20
AQL N/A 0.65 N/A
Max Def. Qty N/A 0 N/A
Date : 20-05-2023
FINAL INSPECTION REPORT
P. : 2/ 2

Inspection No. : 2305-0-18453 Inspected By Yissel Osorio (Fty QC)


Supplier : SAE-A TRADING CO., LTD. Factory : EINS S.A.

Critical Critical
Major Minor Major Minor

Defect Group : Product Safety Check TTL

Sampling Plan : Single <Product Safety Check> Final TTL


Sampling Level : Normal
Inspection Level : II

Sample Size : 200


AQL 0 N/A N/A
Max Def. Qty 0 N/A N/A

SIGNATURE :
RESULT : Pass-Inspection accepted
REMARK:
Final Inspection Pass

NAME : Alfonso Lopez


Start Time : 18-05-2023 10:00 End Time : 18-05-2023 11:00 TITLE : Factory DQA

The defects found and listed in this report are the findings at the time of inspection mentioned above. The supplier is responsible for the whole lot products shipped.

You might also like