Professional Documents
Culture Documents
Late / Non Working Hour Inspection? N/A No. of carton shipped 994
Critical Critical
Major Minor Major Minor
Sample Size : 32
AQL 0 2.5 N/A
Max Def. Qty 0 2 N/A
Sample Size : 20
AQL N/A 0.65 N/A
Max Def. Qty N/A 0 N/A
Date : 20-05-2023
FINAL INSPECTION REPORT
P. : 2/ 2
Critical Critical
Major Minor Major Minor
SIGNATURE :
RESULT : Pass-Inspection accepted
REMARK:
Final Inspection Pass
The defects found and listed in this report are the findings at the time of inspection mentioned above. The supplier is responsible for the whole lot products shipped.