Professional Documents
Culture Documents
Late / Non Working Hour Inspection? N/A No. of carton shipped 385
Critical Critical
Major Minor Major Minor
Sample Size : 20
Staining AQL N/A 0.65 N/A
Max Def. Qty N/A 0 N/A
Sample Size : 32
<Visual Check> Final TTL 5 AQL 0 2.5 N/A
Max Def. Qty 0 2 N/A
TTL 1
Critical Critical
Major Minor Major Minor
SIGNATURE :
RESULT : Pass-Inspection accepted
REMARK:
Final Inspection Pass
NAME :
Start Time : 17-05-2023 08:00 End Time : 17-05-2023 10:00 TITLE :
The defects found and listed in this report are the findings at the time of inspection mentioned above. The supplier is responsible for the whole lot products shipped.
Date : 19-05-2023
FINAL INSPECTION REPORT
P. : 3/ 3