You are on page 1of 2

Quiz

An old building was constructed with a dimension of 40×25 m.


This building consists of cellar, ground, 1st, 2nd and 3rd floor. Its total
cost was 750×106 ID. The cost of cellar and roof was 65% of the ground
floor and 35% of the 3rd floor, respectively. Estimate the cost per m2
(CPm2) for the building, cellar, ground, 1st, 2nd and 3rd floor, and roof.

Sol:
Area ground ,1st ,2nd ,3rd =40*25*4=4000 m2
Area cellar=40*25*0.65=650 m2
Area roof= 40*25*0.35=350 m2
Total area=5000 m2
Cost/m2 building=750000000/5000=150000 ID/m2 =cost 1st ,2nd
,3rd,ground
Cost roof=150000*0.35=52500 ID/M2
Cost cellar=0.65*150000=97500 ID/M2
Quiz

A new building was constructed with a dimension of 40×25 m.


This building consists of basement, ground, 1st, 2nd and 3rd floor. Its
total cost was 750 million ID. The cost of roof and was 65% of the
ground floor, the height of floors 2.5 m . Estimate the cost per m2
(CPm2) for the building

SOL:

Area ground ,1st ,2nd ,3rd , basement= 40*25*5=5000 m2


Area roof =0.65*40*25=650 m2
Total area = 5650 m2
Cost /m2=750000000/5650=132,743,36 ID/m2