You are on page 1of 4

NAME : M ILHAM RAYA

CLASS : TKBG 1A

HOUSE ESTIMATES

1. Calculation of Land Prices land measuring 60 square meters in Jakarta with an


estimated land price of IDR 6,000,000 per meter. It can be concluded that the costs
that need to be incurred to buy land are as follows. IDR 6,000,000 x 60 meters =
IDR 360,000,000.

2. Calculation of Costs for Foundations Calculation of costs for building a house


foundation. namely, Bottom Section + Top Section: 2 x Foundation Height

For example, when you want to build a one-story house, the size of the bottom
section is 50cm, the top section is 30cm, and the foundation height is 60cm.

By following the formula above, below are the calculation results. ((0.5m + 0.3m) /
2) x 0.6m = 0.24 cubic meters.

It can be concluded that every one meter of foundation length requires around 0.24
cubic meters. Once you know the foundation cubication per meter, then you can
calculate the costs that need to be incurred. The cost required for one cubic meter
of foundation is around IDR 2,000,000. The estimated costs that need to be spent
for every 1 meter of foundation are. IDR 2,000,000 x 0.24m = IDR 480,000 per meter.

A rough calculation of the foundation costs that need to be paid for land measuring
60 square meters is as follows. IDR 480,000 x 36 meters = IDR 17,280,000

3. Calculation of Building Materials The following are details of house building


materials and their prices

Based on standard brick sizes, around 100 bricks are needed to make a 1 square
meter wall.

If calculated, the total wall area for a type 36 house is 154 square meters. The
estimated total bricks required are 100 bricks x 154 square meters = 15,400 pieces.
To have reserves, round up your brick purchases to 15,000. The selling price of the
bricks is IDR 500 per piece. The estimated total costs required are as follows. IDR
500 x 15,000 = IDR 7,500,000

For a type 36 house, 90 sacks of 65kg cement are required. The selling price for
one bag of 65kg cement is around IDR 65,000. The estimated total cost of purchasing
cement is. IDR 65,000 x 90 = IDR 5,850,000

The total volume of sand required for a type 36 house is around 20 cubic meters.
The current estimated selling price for sand is IDR 160,000 per cubic meter. You
can calculate the costs needed to buy sand as follows. IDR 160,000 x 20 cubic
meters = 3,200,000

A type 36 house requires around 1 cubic meter of gravel. The estimated price of
gravel is IDR 300,000 per cubic meter. The costs that need to be incurred are as
follows. IDR 300,000 x 1 cubic meter = IDR 300,000 The next cost that needs to be
paid is the cost of nails. The costs that must be incurred to buy various types of
nails are as follows. Rp. 400,000

4. Roof Construction Calculations A type 36 house requires approximately 40 sheets


of tin roofing. The current estimated price for zinc is around IDR 70,000 per
share. You also need 5 sheets of zinc shingles, with a unit price of IDR 20,000.
The total costs that need to be spent on materials for making the roof are as
follows. (Rp. 70,000 x 40) + (Rp. 20,000 x 5) = Rp. 2,800,000 + Rp. 100,000 = Rp.
2,900,000

5. Calculations for Making Frames and Windows A type 36 house with 2 bedrooms and 1
bathroom requires 5 doors. Details of the costs for making frames, doors and
windows are as follows. PVC door measuring 70 x 200cm, estimated price IDR 500,000
per piece. The total cost for the door is as follows. IDR 500,000 x 5 = IDR
2,500,000

Door frame measuring 70 x 200cm, estimated price IDR 250,000 per piece. The total
costs for the frame are as follows. IDR 250,000 x 5 = IDR 1,250,000

A type 36 house requires 4 windows, the estimated price for one window is IDR
250,000 per piece. Windows also require 4 frames, with an estimated price of Rp.
100,000 per window frame. The total costs for windows and frames are as follows.
(Rp. 250,000 x 4) + (Rp. 100,000 x 4) = Rp. 1,000,000 + Rp. 400,000 = Rp.
1,400,000.

6. Labor Costs The following is a complete cost breakdown

Semi-skilled handyman/laborer's helper Rp.87.000/Day

Skilled handyman/laborer helper


Rp97.000/Day

Digger
Rp82.000/Day

Skilled carpenter
Rp118.000/Day

Skilled concrete ironworker


Rp125.000/Day

Painter/polisher
Rp120.000/Day

Skilled blacksmith
Rp130.000/Day

Plumber
Rp120.000/Day

Electrician
Rp125.000/Day

Cost of installing ceramic tiles


Rp65.000/m2

Brick installation costs


Rp35.000/m2

Ceiling installation costs


Rp45.000/m2

Wall plaster costs


Rp30.000/m2
Electrical installation costs
Rp.60.000/point

Land excavation costs


Rp.80.000/m2

Concrete installation costs


Rp.30.000/m2

Concrete casting costs


Rp.150.000/m2

Ironworking costs
Rp.3000/Kg

Cost of paving block work


Rp.25.000/m2

7. Table of House Building Costs Per Meter You can use the data above as an
estimate in calculating the cost of building a house per meter. The following are
the details in table form.

Calculation of land prices


IDR 360.000.000

Calculation of foundation
IDR 17.280.000

costs Brick material


IDR 7.500.000

costs Purchase of cement materials


IDR 5,850,000

Sand material costs


IDR 3.200.000

Gravel material costs


IDR 300.000

Nail material costs


IDR 400.00

Roof construction costs


IDR 2.900.000

Cost of PVC doors


IDR 2.500.000

Door frame manufacturing


IDR 1.250.000

Cost of windows and window frames


IDR 1.400.000

Total total cost


IDR 402.580.000
Estimated construction costs per square meter
IDR 6.709.666