Doc No RP-EHS-F013

Mock Drill Report Rev, Dt 1, 16May2019

Site / Plant Name Shreyas Solar farms pvt ltd, Khetusar,20MW

Mock Drill Date 09.08.2022 Mock Drill 15:30 AM


Time

1. Type of Mock Drill Mockdrill on Snake/Scorpion Bite

2. Nature of emergency Incident Management

Mr. Giriraj Purohit Renew Power

Mr. Kundan Singh Param Renewables

Mr. Roopa Ram Param Renewables


Mr. Pappu Singh Swangiya Ray
Mr. Ashok Singh Swangiya ray

Mr. Meghram Swangiya ray

Mr. Khet singh Vehicle-Driver

3. First information given by Mr. Meghram


Emergency Warning/
4. Communication Heard all over Communicated to working group verbally
the site. (as per scope applicable)
5. Evacuation of Entire site or part
Part of the site
of the site ordered
6. A Responsible or in Charge
Mr. Kundan Singh
present at assembly point
If yes, Name/Designation Head count not applicable
7. Head count taken at assembly
point.
Head Count details

8. Rescue of affected person carried


Mr. Mehgram
out effectively
9. Emergency Commander /Rescue
Adequate
Team reaction is adequacy
10. Emergency escape routes are free
Un obstructed
from obstruction
Description Time

First Information 15.31 Hrs

Communication spread 15.32 Hrs


11. Details of the Drill First Man arrived at the Incident point 15.33 Hrs

Team arrived 15.35 Hrs

Vehicle Arrived 15.37 Hrs


Technician rescued and Vehicle reached to the 16.00 Hrs
The information in this document is the property of ReNew Power Ltd. and may not be copied or communicated to a third party, or used for any purpose
other than that for which it is supplied without the express written consent of ReNew Power Ltd. Page 1 of 2
Doc No RP-EHS-F013
Mock Drill Report Rev, Dt 1, 16May2019
nearest hospital
Briefing given 17.00 Hrs

All Clear siren given 18:30 Hrs

12. No. of First Aiders Responded 1

13. No of Fire Fighters are responded Not Applicable

S.N Fire Extinguisher type Number

14. Fire Extinguishers used

15. Fire Extinguished start & end


NA
time
16. Areas of strength Communication

17. Areas needs Improvement Handling situation

Remarks
1. Driver should be aware of route marking in case of emergency exit
2. Victim should be handled more carefully
3. More off-role employees should take part in the Mockdrill

Prepared by Name Designation Signature


Giriraj Purohit Engineer-SAM