1. Nature of Emergency Earthquake 2. Department :Machining area 3. Area/ Location: MCD Area 4. Date & Emergency start time: 20.08.2019 at 2:00 pm. 5. Observations: As per Annexure. S. Responsibility Action taken/ Remarks No. Recommendations (Agency) Time Frame To fill in 1 Training to be provided to All Participants Sukhwinder Masih Target 21.08.2019 during earthquake emergency. Target 25.08.2019
6. Recommendations / Action taken * :
* Note: Compliance report to be submitted by the concerned agencies.
Activities/ Observations during drill
Happy Forgings Limited 1. Incharge declares Mock Drill: (Telephonic information to shop HOD) Time: 02:00 hrs. 2. Time of intimating External Agencies ( Within 2 Minutes) (By Shop HoD / Designated person)
S. Location Time Remarks/Observation
No. 1 Plant Control 02:01 hrs. Ok 2 Fire Services/Ambulance 02:03 hrs. Ok
3. Check List of Activities at control posts.
S. Activities at control posts Status Observation/ Remarks
No. I Main to observer at control post
a. List of emergency contact Nos Availability Yes/No Yes
b. List of First Aid trained persons-Availability Yes/No Yes c. List of fire fighter trained person availability Yes/No Yes d. List of emergency equipment (Fire Extinguisher, First aid Yes/No Yes box, mask, Emergency light, etc.)-Availability / condition e. Internal communication equipment-Availability / condition Yes/No Yes f. Identification board / route sign -Availability / condition Yes/No Yes g. Emergency siren – function or not Yes/No Yes h. Reporting time of Hod/Designated person. 02:02 hrs. (2 minute)
II Assembly Point (Near center gate dispensary) Yes/No Yes
a. Reporting time of area incharge designated person (2 02:02 hrs.
Minute) b. Identification Board/Route sign – Available. condition Yes/No Yes c. Verify employees presence working at emergency site Yes/No Verified within 12minutes (within 15 Minutes) ok d. Head Count In/Actual 250/250 e. Rescue of casualty, if required. No III Emergency Site a. Reporting time of first aid person. Yes/No 02:02 hrs. (2 minute) b. Reporting time of fire fighter person. Yes/No 02:01 hrs. (2 minute)
Preparatory work sheet for Mock drill
Department: - Machining Area Happy Forgings Limited Area/Location: - MCD Date & Time: - 20. At 02:00 pm.
S. Location Observer (S/Sri)
No. 1. Control centre Amit Puri
2. Assembly point Sukhwinder / Bikramjeet / Balram/