PROGRESS TANAM BIBIT CLONE APRIL 2021

UPDATE SD.TANGGAL 20 JUNI 2021


UNIT BLOK CPT STAND LUAS JENIS LAHAN PROGRES LAPANGAN TANGGAL TANAM
03 BANDING ANYAR 22 a1 13.62 LOA Selesai Tanam 29-Mar-21
03 BANDING ANYAR 20 e 9.33 LOA Selesai Tanam 19-Apr-21
03 BANDING ANYAR 18 c1 7.41 LOA Selesai Tanam 29-Mar-21
03 SUBAN JERIJI 15 c3 8.74 LOA Selesai Tanam 10-Apr-21
03 SUBAN JERIJI 10 b2 3.11 LOA Selesai Tanam 10-Apr-21
03 SUBAN JERIJI 16 c2 3.91 LOA Selesai Tanam 4-Apr-21
03 SUBAN JERIJI 16 c 29.97 LOA Selesai Tanam 15-Apr-21
03 SUBAN JERIJI 16 c1 20.08 LOA Selesai Tanam 20-Apr-21
05 SODONG SELATAN 15 a6 27.05 LOA Selesai Tanam 10-Apr-21
05 SODONG SELATAN 23 b2 14.87 LOA Selesai Tanam 10-Apr-21
05 SODONG SELATAN 20 a 5.72 LOA Selesai Tanam 10-Apr-21
W1 Total 143.81
08 IPUH 02 a 21.03 LOA Selesai Tanam 24-Apr-21
08 IPUH 02 b 20.56 LOA Selesai Tanam 27-Apr-21
W2 Total 41.59
15 KERUH 1 15 a 18.14 LOA Sudah BAP Tanam 3-Apr-21
15 KONENG 05 a 15.13 LOA Sudah BAP Tanam 3-Apr-21
15 KONENG 07 a 22.98 LOA Sudah BAP Tanam 10-Apr-21
15 KONENG 07 b 15.82 LOA Sudah BAP Tanam 10-Apr-21
15 KONENG 07 b 14.04 LOA Sudah BAP Tanam 10-Apr-21
15 KONENG 15 b 25.78 LOA Sudah BAP Tanam 10-Apr-21
W3 Total 111.89
MHP Total 297.29
RENCANA TANAM BIBIT CLONE MAY 2021
UPDATE SD.TANGGAL 20 JUNI 2021
UNIT BLOK CPT STAND LUAS JENIS LAHAN PROGRES LAPANGAN TANGGAL TANAM
03 SUBAN JERIJI 06 a 4.21 LOA Selesai Tanam 27-Apr-21
03 SUBAN JERIJI 05 a 7.48 LOA Selesai Tanam 27-Apr-21
03 BANDING ANYAR 18 b2 23.58 LOA Selesai Tanam 20-May-21
04 SODONG TIMUR 34 B 10.72 LOA Selesai Tanam 21-Apr-21
04 CABAN SELATAN 40 a1 9.13 LOA Selesai Tanam 3-May-21
04 CABAN SELATAN 14 e 9.71 LOA Selesai Tanam 6-May-21
04 CABAN SELATAN 14 c 14.88 LOA Selesai Tanam 10-May-21
05 SODONG SELATAN 32 a 12.15 LOA Selesai Tanam 16-May-21
05 SODONG SELATAN 32 b 1.36 LOA Selesai Tanam 20-May-21
05 SODONG SELATAN 32 c 15.17 LOA Selesai Tanam 10-May-21
W1 Total 108.39
15 JERNIH 14 b 15.36 LOA Selesai Tanam 3-May-21
15 JERNIH 12 c 13.17 LOA Selesai Tanam 5-May-21
15 KONENG 02 a 19.01 LOA Selesai Tanam 10-May-21
15 KONENG 04 a 14.1 LOA Selesai Tanam 1-May-21
15 KONENG 18 g 21.86 LOA Selesai Tanam 5-May-21
15 KERUH 1 37 a 3.02 LOA Selesai Tanam 5-May-21
W3 Total 86.52
MHP Total 194.91
RENCANA TANAM BIBIT CLONE JUN 2021
UPDATE SD.TANGGAL 26 SEP 2021
UNIT BLOK CPT STAND LUAS JENIS LAHAN PROGRES LAPANGAN TANGGAL TANAM
03 BANDING ANYAR 20 a 8.46 LOA Selesai Tanam 11-Juni-21
03 SUBAN JERIJI 05 a 9.67 LOA Selesai Tanam 18-Juni-21
04 CABAN SELATAN 39 b 14.04 LOA Selesai Tanam 10-Juni-21
05 SODONG SELATAN 32 d11 15.38 LOA Selesai Tanam 04-Juni-21
05 SODONG SELATAN 16 c 21.47 LOA Selesai Tanam 20-May-21
05 SODONG SELATAN 22 a1 4.25 LOA Selesai Tanam 26-Mei-21
05 LENGI 21 a6 6.77 LOA Selesai Tanam 22-Jun-21
W1 Total 80.04
11 SIALANG 12 d 25.05 LOA Selesai Tanam 10-Jun-21
W2 Total 25.05
10 KERUH2 13 b 7.52 LOA Selesai Tanam 6-Jun-21
10 KERUH2 22 b 18.00 LOA Selesai Tanam 6-Jun-21
13 LANTINGAN TIMUR 03 a 9.76 LOA Selesai Tanam 2-Jun-21
13 LANTINGAN TIMUR 03 a 14.56 LOA Selesai Tanam 12-Jun-21
13 LANTINGAN TIMUR 03 c 5.56 LOA Selesai Tanam 9-Jun-21
15 SUBAT 32 b2 3.44 LOA Selesai Tanam 25-Jun-21
15 SUBAT 34 e 11.03 LOA Selesai Tanam 10-Jun-21
15 SUBAT 34 f 19.80 LOA Selesai Tanam 10-Jun-21
15 KONENG 05 b 19.24 LOA Selesai Tanam 16-Jun-21
15 JERNIH 13 a 12.44 LOA Selesai Tanam 6-Jun-21
W3 Total 121.35
MHP Total 226.44
RENCANA TANAM BIBIT CLONE JUL 2021
UPDATE SD.TANGGAL 26 SEP 2021
UNIT BLOK CPT STAND LUAS JENIS LAHAN PROGRES LAPANGAN TANGGAL TANAM
02 MERBAU 1 03 a1 6.25 LOA Selesai Tanam 13-Jul-21
02 MERBAU 1 13 c 4.54 LOA Selesai Tanam 13-Jul-21
02 MERBAU 1 13 c 4.33 LOA Selesai Tanam 10-Jul-21
02 MERBAU 1 16 a 5.15 LOA Selesai Tanam 13-Jul-21
02 MERBAU 1 16 a 26.01 LOA Selesai Tanam 13-Jul-21
02 MERBAU 1 17 d 5.12 LOA Selesai Tanam 11-Jul-21
02 MERBAU 1 17 c 1.99 LOA Selesai Tanam 17-Jul-21
03 BANDING ANYAR 04 d 2.13 LOA Selesai Tanam 3-Jul-21
04 SODONG UTARA 28 a 15.00 LOA Selesai Tanam 25-Jun-21
04 SODONG UTARA 28 c 22.20 LOA Selesai Tanam 29-Jun-21
05 SODONG SELATAN 31 c 20.46 LOA Selesai Tanam 15-Jun-21
05 SODONG SELATAN 31 a 10.59 LOA Selesai Tanam 24-Jun-21
05 SODONG SELATAN 32 c 2.97 LOA Selesai Tanam 1-Jul-21
W1 Total 126.74
11 SIALANG 14 d 21.47 LOA Selesai Tanam 7-Jul-21
11 SIALANG 14 b 25.81 LOA Selesai Tanam 4-Jul-21
W2 Total 47.28
13 SERDANG UTARA 07 b 19.98 LOA Selesai Tanam 11-Jul-21
13 SERDANG UTARA 07 h 22.55 LOA Selesai Tanam 31-Jul-21
W3 Total 42.53
MHP Total 216.55
RENCANA TANAM BIBIT CLONE AUG 2021
UPDATE SD.TANGGAL 26 SEP 2021
UNIT BLOK CPT STAND LUAS JENIS LAHAN
PROGRES LAPANGAN
GAL TANAM
02 MERBAU 1 25 g 19.54 LOA Selesai Tanam 5-Aug-21
02 MERBAU 1 25 f 3.04 LOA Selesai Tanam 7-Aug-21
03 BANDING ANYAR 20 c 15.24 LOA Selesai Tanam 5-Aug-21
04 SODONG UTARA 35 b 4.93 LOA Selesai Tanam 15-Aug-21
04 SODONG UTARA 35 a 8.99 LOA Selesai Tanam 15-Aug-21
04 SODONG UTARA 38 a 26.47 LOA Selesai Tanam 2-Aug-21
05 LENGI 06 b 8.62 LOA Selesai Tanam 5-Aug-21
05 LENGI 06 a 6.97 LOA Selesai Tanam 5-Aug-21
05 LENGI 21 b 23.48 LOA Selesai Tanam 5-Aug-21
05 LENGI 21 d 5.70 LOA Selesai Tanam 10-Aug-21
05 LENGI 45 b 5.18 LOA Selesai Tanam 10-Aug-21
W1 Total 128.16
11 SIALANG 31 c 17.38 LOA Selesai Tanam 18-Aug-21
11 SIALANG 31 f 14.87 LOA Selesai Tanam 18-Aug-21
W2 Total 32.25
13 SERDANG SELATAN 01 a 24.14 LOA Selesai Tanam 5-Aug-21
13 LANTINGAN TIMUR 16 c 21.14 LOA Selesai Tanam 7-Aug-21
15 KERUH 1 18 a 13.13 LOA Selesai Tanam 4-Aug-21
15 KERUH 1 20 a2 13.18 LOA Selesai Tanam 6-Aug-21
W3 Total 71.59
MHP Total 232.00 - - -
RENCANA TANAM BIBIT CLONE SEP 2021
UPDATE SD.TANGGAL 15 Okt 2021
UNIT BLOK CPT STAND LUAS JENIS LAHANPROGRES LAPANGAN TANGGAL TANAM
2 MERBAU 1 15 a 6.89 LOA Selesai Tanam 3-Sep-21
2 MERBAU 2 25 c 14.29 LOA Selesai Tanam 6-Sep-21
3 MERBAU 3 2 d 20.17 LOA Selesai Tanam 4-Sep-21
3 MERBAU 3 2 c 17.16 LOA Selesai Tanam 9-Sep-21
3 SUBANJERIJI 02 a 7.32 LOA Selesai Tanam 9-Sep-21
4 SODONG UTARA 29 b 22.76 LOA Selesai Tanam 3-Sep-21
4 SODONG UTARA 34 c 18.85 LOA Selesai Tanam 2-Sep-21
4 SODONG UTARA 34 b 9.51 LOA Selesai Tanam 10-Sep-21
5 LENGI 18 a 4.49 HOA Selesai Tanam 18-Sep-21
5 LENGI 18 b 6.25 HOA Selesai Tanam 21-Sep-21
5 LENGI 06 b 10.29 HOA Selesai Tanam 20-Sep-21
5 LENGI 07 b 14.49 HOA Selesai Tanam 20-Sep-21
5 LENGI 07 a 10.76 HOA Selesai Tanam 20-Sep-21
W1 Total 163.23 - -
8 IPUH 13 c 10.13 LOA Selesai Tanam 11-Sep-21
11 SIALANG 29 d 21.59 LOA Selesai Tanam 2-Sep-21
11 SIALANG 31 b 20.45 LOA Selesai Tanam 4-Sep-21
W2 Total 52.17
10 KERUH 2 57 d 4.96 LOA Selesai Tanam 10-Sep-21
10 KERUH 2 57 c 2.67 LOA Selesai Tanam 8-Sep-21
13 SERDANG UTARA 05 e2 20.35 LOA Selesai Tanam 1-Sep-21
13 SERDANG UTARA 05 e1 19.90 LOA Selesai Tanam 2-Sep-21
15 JERNIH 15 b 19.36 LOA Selesai Tanam 6-Sep-21
15 SUBAT 9 a 11.42 LOA Selesai Tanam 4-Sep-21
78.66 -
MHP Total 294.06
UPDATE SD.TANGGAL 20 Oktober 2021

UNIT BLOK CPT STAND LUAS JENIS LAHAN PROGRES LAPANGAN TANGGAL TANAM
1 SUNGAI LANGIT 36 a1 18.04 LOA Selesai Tanam 3-Oct-21
2 MERBAU 1 13 f 19.03 LOA Selesai Tanam 1-Oct-21
2 MERBAU2 20 e 18.49 LOA Selesai Tanam 27-Oct-21
4 SODONG UTARA 34 a 22.31 LOA Selesai Tanam 28-Sep-21
4 SODONG UTARA 39 a 13.02 LOA Selesai Tanam 1-Oct-21
5 LENGI 02 a1 9.67 LOA Selesai Tanam 10-Oct-21
5 LENGI 04 a1 13.04 LOA Selesai Tanam 10-Oct-21
5 LENGI 04 c 8.52 LOA Selesai Tanam 10-Oct-21
5 LENGI 18 b 17.86 LOA Selesai Tanam 4-Oct-21
5 LENGI 18 d 12.02 LOA Selesai Tanam 4-Oct-21
5 LENGI 18 e 8.44 LOA Selesai Tanam 4-Oct-21
W1 Total 160.44 - -
11 PENYEMBANGAN 29 f 19.99 LOA Selesai Tanam 13-Oct-21
W2 Total 19.99
10 PANGLERO 25 f 17.82 LOA Selesai Tanam 13-Oct-21
13 SERDANG UTARA 16 a 28.04 LOA Selesai Tanam 7-Oct-21
13 SERDANG UTARA 19 d 15.09 LOA Selesai Tanam 8-Oct-21
14 SERAI 55 c 19.10 LOA Selesai Tanam 24-Sep-21
80.05 -
MHP Total 260.48
UPDATE SD.TANGGAL 3 November 2021

UNIT BLOK CPT STAND LUAS JENIS LAHAN PROGRES LAPANGAN TANGGAL TANAM
1 SUNGAI LANGIT 43 b/3 4.73 LOA Selesai Tanam 10-Nov-21
1 SUNGAI LANGIT 43 a/4 6.69 LOA Selesai Tanam 12-Nov-21
5 LENGI 02 a 24.76 LOA Selesai Tanam 16-Oct-21
5 LENGI 02 e 20.50 LOA Selesai Tanam 16-Oct-21
5 LENGI 04 a 8.69 LOA Selesai Tanam 10-Nov-21
W1 Total 65.37 -
7 SUBAN ULU 09 b 26.81 LOA Selesai Tanam 1-Nov-21
11 BUKIT KULIM 4 B 22.02 LOA Selesai Tanam 19-Nov-21
11 BUKIT KULIM 4 E 11.92 LOA Selesai Tanam 19-Nov-21
W2 Total 60.75 - -
10 PANGLERO 16 f 25.30 LOA Selesai Tanam 22-Nov-21
10 PANGLERO 25 g 18.14 LOA Selesai Tanam 21-Nov-21
13 SERDANG UTARA 09 b 26.24 LOA Selesai Tanam 11-Nov-21
13 SERDANG UTARA 09 c 27.46 LOA Selesai Tanam 28-Oct-21
14 IBUL 50 a 5.87 LOA Selesai Tanam 10-Nov-21
103.01 - -
MHP Total 229.13 - -
UPDATE SD.TANGGAL 23 DESEMBER 2021
JENIS PROGRES TANGGAL
UNIT BLOK CPT STAND LUAS
LAHAN LAPANGAN TANAM
1 SUNGAI LANGIT 27 d/1 15.45 LOA SELESAI TANAM 15-Dec-21
2 MERBAU 2 12 b 19.10 LOA SELESAI TANAM 15-Dec-21
3 TOMAN 1 24 b4 6.63 RA SELESAI TANAM 26-Nov-21
4 CABAN UTARA 5 h 10.77 LOA SELESAI TANAM 15-Dec-21
4 CABAN UTARA 15 d 5.46 LOA SELESAI TANAM 29-Nov-21
4 CABAN UTARA 15 c 1.76 LOA SELESAI TANAM 3-Dec-21
4 CABAN UTARA 6 a 3.57 LOA SELESAI TANAM 17-Dec-21
4 CABAN UTARA 5 h 10.77 LOA SELESAI TANAM
4 CABAN UTARA 16 b 2.77 LOA SELESAI TANAM 17-Dec-21
W1 Total 76.28 - -
7 SUBAN ULU 11 a 10.65 LOA SELESAI TANAM 22-Dec-21
9 CAWANG 04 d 16.81 LOA SELESAI TANAM 5-Dec-21
11 BUKIT KULIM 21 b 21.20 LOA SELESAI TANAM 31-Dec-21
W2 Total 48.66 - -
10 PANGLERO 02 c 11.90 LOA SELESAI TANAM 6-Dec-21
10 PANGLERO 16 c 17.22 LOA SELESAI TANAM 21-Dec-21
13 SERDANG UTARA 10 d 26.72 LOA SELESAI TANAM 5-Dec-21
13 SERDANG UTARA 10 e 17.77 LOA SELESAI TANAM 4-Dec-21
13 SERDANG UTARA 10 f 21.40 LOA SELESAI TANAM 15-Dec-21
95.01 - -
MHP Total 219.95 - -
RENCANA TANAM BIBIT CLONE JANUARI 2022
UPDATE SD.TANGGAL 25 JANUARI 2022
PROGRES
UNIT BLOK CPT STAND LUAS JENIS LAHAN
LAPANGAN
1 SUNGAI LANGIT 21 a/1 19.53 LOA Selesai Tanam
1 SUNGAI LANGIT 45 b/8 18.26 LOA Selesai Tanam
1 SUNGAI LANGIT 45 d/5 6.76 LOA Selesai Tanam
1 SUNGAI LANGIT 44 c/3 12.72 LOA Selesai Tanam
1 SUNGAI TUHA 44 b1/2 26.68 LOA Selesai Tanam
1 SUNGAI LANGIT 43 a/1 17.69 LOA Selesai Tanam
1 SUNGAI TUHA 22 a/3 24.72 LOA Selesai Tanam
1 SUNGAI TUHA 23 a/1 2.71 LOA Selesai Tanam
1 SUNGAI TUHA 37 a/15 5.31 LOA Selesai Tanam
2 MERBAU 2 14 A 2.64 LOA Selesai Tanam
2 MERBAU 2 14 B 12.63 LOA Selesai Tanam
2 MERBAU 2 20 E 26.37 LOA Selesai Tanam
2 MERBAU 2 20 I 20.13 LOA Selesai Tanam
2 MERBAU 3 01 d 3.39 LOA Proses Tanam
2 MERBAU 3 12 F 16.95 LOA Selesai Tanam
2 MERBAU 3 12 l 22.96 LOA Selesai Tanam
4 CABAN UTARA 06 b 7.73 LOA Selesai Tanam
5 SODONG BARAT 18 A 5.38 LOA Selesai Tanam
5 SODONG BARAT 18 A 10.34 LOA Selesai Tanam
W1 Total 262.90 - -
9 CAWANG 27 a 15.60 LOA Selesai Tanam
W2 Total 15.60
13 SERDANG UTARA 07 a 24.96 LOA Selesai Tanam
13 SERDANG UTARA 10 b 27.10 LOA Selesai Tanam
13 SERDANG UTARA 15 a 12.81 LOA Selesai Tanam
13 SERDANG UTARA 05 i 27.73 LOA Selesai Tanam
14 IBUL 22 a 19.24 LOA Selesai Tanam
111.84
MHP Total 390.34
TANGGAL Luas Tanam Jumlah Bibit
NO SPK TANGGAL SPK
TANAM (ha) terkirim (btg)
10-Jan-22 028431.SPK.01.TNM-LOA.01.2022 11-Jan-22 19.53 36,060
10-Jan-21 028465.SPK.01.TNM-LOA.01.2022 15-Jan-22 18.26 34,560
1-Jan-22 028385.SPK.01.TNM-LOA.01.2022 7-Jan-22 6.76 12,420
20-Jan-22 028466.SPK.01.TNM-LOA.01.2022 15-Jan-22 12.72 22,800
10-Jan-22 028547.SPK.01.TNM-LOA.01.2022 23-Jan-22 26.68 54,480
10-Jan-21 028446.SPK.01.TNM-LOA.01.2022 13-Jan-22 17.69 32,220
5-Jan-21 028429.SPK.01.TNM-LOA.01.2022 11-Jan-22 24.72 49,860
14-Jan-22 028586.SPK.01.TNM-LOA.01.2022 28-Jan-22 2.71 4,550
14-Jan-22 028464.SPK.01.TNM-LOA.01.2022 15-Jan-22 5.31 9,600
7-Jan-21 028383.SPK.02.TNM-LOA.01.2022 7-Jan-22 2.64 4,320
7-Jan-21 028382.SPK.02.TNM-LOA.01.2022 7-Jan-22 12.63 23,280
10-Jan-21 028468.SPK.02.TNM-LOA.01.2022 16-Jan-22 26.37 48,900
19-Jan-22 028445.SPK.02.TNM-LOA.01.2022 13-Jan-22 20.13 38,160
14-Jan-21 027862.SPK.02.TNM-LOA.11.2021 20-Nov-21 3.39 6,120
12-Jan-21 028380.SPK.02.TNM-LOA.01.2022 7-Jan-22 16.95 30,900
1-Jan-21 028381.SPK.02.TNM-LOA.01.2022 7-Jan-22 22.96 41,280
12-Jan-22 028423.SPK.04.TNM-LOA.01.2022 11-Jan-22 7.73 14,400
12-Jan-22 028425.SPK.05.TNM-LOA.01.2022 11-Jan-22 5.38 9,960
11-Jan-22 028427.SPK.05.TNM-LOA.01.2022 11-Jan-22 10.34 19,740
- 262.90 493,610
021898.SPK.09.TNM-LOA.01.2022 11-Jan-22 15.60 30,840
15.60 30,840
26-Dec-21 023490.SPK.13.TNM-LOA.01.2022 3-Jan-22 24.96 47,400
29-Dec-21 023407.SPK.13.TNM-LOA.12.2021 23-Dec-21 27.10 54,300
23-Dec-21 023406.SPK.13.TNM-LOA.12.2021 23-Dec-21 12.81 23,100
16-Jan-22 023663.SPK.13.TNM-LOA.1.2022 15-Jan-22 27.73 51,960
1-Jan-22 023628.SPK.14.TNM-LOA.01.2022 11-Jan-22 19.24 34,200
111.84 210,960
390.34 735,410
No BAP Tanggal BAP
Luas BAP Tanam KETERANGAN
Tanam Tanam
002769.BAP.01 19.53 2/28/2022 Sudah BAP Tanam
002724.BAP.01 18.26 2/19/2022 Sudah BAP Tanam
002660.BAP.01 6.76 1/16/2022 Sudah BAP Tanam
002700.BAP.01 12.72 31-Jan-22 Sudah BAP Tanam
002711.BAP.01 26.68 2/11/2022 Sudah BAP Tanam
002742.BAP.01 17.69 2/25/2022 Sudah BAP Tanam
002667.BAP.01 24.72 01/22/2022 Sudah BAP Tanam
002728.BAP.01 2.71 2/20/2022 Sudah BAP Tanam
002670.BAP.01 5.31 01/22/2022 Sudah BAP Tanam
002729.BAP.02 2.64 01/30/2022 Sudah BAP Tanam
002719.BAP.02 12.63 01/28/2022 Sudah BAP Tanam
002745.BAP.02 26.37 31-Jan-22 Sudah BAP Tanam
002747.BAP.02 20.13 31-Jan-22 Sudah BAP Tanam
Selesai Tanam / Masalah Sosial
002794.BAP.02 16.95 2/25/2022 Sudah BAP Tanam
002739.BAP.02 22.96 31-Jan-22 Sudah BAP Tanam
003452.BAP.04 7.73 28-Jan-22 Sudah BAP Tanam
006270.BAP.05 5.38 01/31/2022 Sudah BAP Tanam
006271.BAP.05 10.34 01/31/2022 Sudah BAP Tanam
- 259.51 535,214.00
003847.BAP.09 15.60 31-Jan-22 Sudah BAP Tanam
- 15.60
004825.BAP.13 24.96 29-Jan-22 Sudah BAP Tanam
004813.BAP.13 27.10 23-Jan-22 Sudah BAP Tanam
004849.BAP.13 12.81 31-Jan-22 Sudah BAP Tanam
004846.BAP.13 27.73 31-Jan-22 Sudah BAP Tanam
004644.BAP.14 19.24 31-Jan-22 Sudah BAP Tanam
- 111.84
- 386.95
RENCANA TANAM BIBIT CLONE FEBRUARI 2022
UPDATE SD.TANGGAL
UNIT BLOK CPT STAND LUAS JENIS LAHAN PROGRES LAPANGAN

2 MERBAU 2 21 d 12.80 LOA Selesai Tanam


2 MERBAU 3 12 e 27.21 LOA Selesai Tanam
2 MERBAU 3 12 m 19.06 LOA Selesai Tanam
4 CABAN UTARA 5 h2 5.54 LOA Selesai Tanam
W1 Total 64.61 - -
8 TB.INDAH 2 03 g 6.56 LOA Selesai Tanam
8 TB.INDAH 2 27 a1 23.49 LOA Selesai Tanam
8 TERAS 03 a1 27.39 LOA Selesai Tanam
9 DERAS 13 g 20.58 LOA Selesai Tanam
9 DERAS 13 h 11.29 LOA Selesai tanam
W2 Total 89.31 - -
13 SERDANG UTARA 31 a1 17.38 LOA Selesai Tanam
13 SERDANG UTARA 31 b1 37.01 LOA Selesai Tanam
13 SERDANG UTARA 31 d1 15.90 LOA Selesai Tanam
13 SERDANG UTARA 10 c1 30.12 LOA Selesai Tanam
14 IBUL 22 c 13.01 LOA Selesai Tanam
W3 Total 113.42 -
MHP Total 267.34
TANGGAL Luas Tanam Jumlah Bibit
NO SPK TANGGAL SPK
TANAM (ha) terkirim (btg)
31-Jan-22 028593.SPK.02.TNM-LOA.01.2022 28-Jan-22 12.80 22200
29-Jan-22 028743.SPK.01.TNM-LOA.02.2022 10-Feb-22 27.21 54960
29-Jan-22 028742.SPK.02.TNM-LOA.02.2022 10-Feb-22 19.06 49,980
15-Dec-21 028607.SPK.04.TNM-LOA.01.2022 30-Jan-22 5.54 10,061
- 64.61 137,200.64
12-Feb-22 022172.SPK.08.TNM-LOA.02.2022 10-Feb-22 6.56 51,480
4-Feb-22 022094.SPK.08.TNM-LOA.02.2022 3-Feb-22 23.49 43,260
4-Feb-22 022093.SPK.08.TNM-LOA.02.2022 3-Feb-22 27.39 12,120
2-Feb-22 022056.SPK.09.TNM-LOA.01.2022 31-Jan-22 20.58 37,020
19-Feb-22 022159.SPK.09.TNM-LOA.02.2022 9-Feb-22 11.29 21,180
- 89.31 165,060.00
26-Jan-22 023841.SPK.13.TNM-LOA.01.2022 26-Jan-22 17.38 31,980
30-Jan-22 024048.SPK.13.TNM-LOA.02.2022 12-Feb-22 37.01 67,860
28-Jan-22 023861.SPK.13.TNM-LOA.01.2022 28-Jan-22 15.90 31,140
6-Feb-22 023904.SPK.13.TNM-LOA.02.2022 1-Feb-22 30.12 60,120
20-Feb-22 024108.SPK.14.TNM-LOA.02.2022 19-Feb-22 13.01 23,100
113.42 214,200
267.34 516,461
-
Tanggal BAP
No BAP Tanam Luas BAP Tanam
Tanam
002848.BAP.02.TNM-LOA.03.2022 12.80 ###
002824.BAP.02.TNM-LOA.03.2022 27.21 ###
002790.BAP.02.TNM-LOA.02.2022 19.06 24-Feb-22
003485.BAP.04.TNM-LOA.02.2022 5.54 24-Feb-22
64.61
006886.BAP.08.TNM-LOA.02.2022 6.56 28-Feb-22
006899.BAP.08.TNM-LOA.02.2022 23.49 28-Feb-22
006945.BAP.08.TNM-LOA.03.2022 27.39 25-Mar-2022
003902.BAP.09.TNM-LOA.02.2022 20.58 23-Feb-22
003919.BAP.09.TNM-LOA.02.2022 11.29 28-Feb-22
89.31
004916.BAP.13.TNM-LOA.02.2022 17.38 28-Feb-22
004926.BAP.13.TNM-LOA.03.2022 37.01 5-Mar-22
004911.BAP.13.TNM-LOA.02.2022 15.90 28-Feb-22
004967.BAP.13.TNM-LOA.03.2022 30.12 25-Mar-22
004703.BAP.14.TNM-LOA.03.2022 13.01 3-Mar-22
113.42
267.34
KETERANGAN

Sudah BAP Tanam


Sudah BAP Tanam
Sudah BAP Tanam
CLONE 148

Sudah BAP Tanam


Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam

Sudah BAP Tanam


Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
RENCANA TANAM BIBIT CLONE MARET 2022
UPDATE SD.TANGGAL 31 MARET 22
TANGGAL
UNIT BLOK CPT STAND LUAS PROGRES LAPANGAN
TANAM
3 SUBANJERIJI 14 b 6.00 Selesai Tanam 16-Mar-22
4 SODONG UTARA 04 a 14.40 Selesai Tanam 1-Mar-22
4 CABAN SELATAN 35 a 15.51 Selesai Tanam 7-Mar-22
5 SODONG BARAT 5 b 3.30 Selesai Tanam 10-Mar-22
5 SODONG BARAT 5 a 2.81 Selesai Tanam 10-Mar-22
W1 Total 42.02 - 223,144.00

W2 Total - -
13 LANTINGAN BARAT 18 a1 3.70 Selesai Tanam 13-Mar-22
13 SERDANG UTARA 31 e 23.94 Selesai Tanam 5-Mar-22
13 SERDANG SELATAN 23 a5 13.62 Selesai Tanam 4-Mar-22
14 IBUL 22 b2 18.49 Selesai Tanam 1-Mar-22
59.75
MHP Total 101.77
Luas Tanam Jumlah Bibit
NO SPK TANGGAL SPK No BAP Tanam
(ha) terkirim (btg)
029134.SPK.0 15-Mar-22 6.00 10,320 004599.BAP.03.TNM-LOA.03.2022
029023.SPK.0 7-Mar-22 14.4 27,600 003548.BAP.04.TNM-LOA.03.2022
029139.SPK.0 15-Mar-22 15.51 28,020 003549.BAP.04.TNM-LOA.03.2022
029077.SPK.0 11-Mar-22 3.30 6,060 006313.BAP.05.TNM-LOA.03.2022
029076.SPK.0 11-Mar-22 2.81 5,280 006312.BAP.05.TNM-LOA.03.2022
- 223,159.00 42.02 77,280.00 -

- - - -
024353.SPK.1 14-Mar-22 3.70 7,740 004990.BAP.13.TNM-LOA.03.2022
024295.SPK.1 8-Mar-22 23.94 48,420 004992.BAP.13.TNM-LOA.03.2022
024063.SPK.1 15-Feb-22 13.62 28,680 005003.BAP.13.TNM-LOA.03.2022
024157.SPK.1 22-Feb-22 18.49 34,740 004754.BAP.14.TNM-LOA.03.2022
59.75 119,580 -
101.77 196,860 -
-
Tanggal BAP
Luas BAP Tanam KETERANGAN
Tanam
6.00 27-Mar-2022 Sudah BAP Tanam
14.40 27-Mar-2022 Sudah BAP Tanam
15.51 27-Mar-2022 Sudah BAP Tanam
3.30 28-Mar-2022 Sudah BAP Tanam
2.81 28-Mar-2022 Sudah BAP Tanam
42.02

-
3.70 30-Mar-22 Sudah BAP Tanam
23.94 30-Mar-22 Sudah BAP Tanam
13.62 31-Mar-22 Sudah BAP Tanam
18.49 30-Mar-22 Sudah BAP Tanam
59.75
101.77
April May Jun
Wilayah Unit
Target Target Actual Luas BAP Target Actual
1
2
1 3 96.17 35 35 35 18 18
4 - 44 44 44 14 14
5 47.64 29 29 29 48 48
7
8 41.59 - - - - -
2
9
11 - - - - 25 25
10 - - - - 26 26
13 - - - - 30 30
3
14
15 111.89 87 87 87 66 66
Total 297.29 195 195 195 226 226

Clone Planting Target in Feb 22


Feb 22
Wilayah Unit
Target
1
2 40.01
3
1
4
5
7
8 57.44
2
9 Err:509
11
10
13 100.41
3
14 13.01
15
Total Err:509
Jun Jul Aug Sep
Luas BAP Target Actual Luas BAP Target Actual Luas BAP Target

53 53 53 23 23 23 59
18 2 2 2 15 15 15 7
14 37 37 37 40 40 40 51
48 34 34 34 50 50 50 46

- - - - - - - 10

25 47 47 47 32 32 32 42
26 - - - - - 8
30 43 43 43 45 45 45 40

66 - - - 26 26 26 31
226 217 217 217 232 232 232 294
Sep Oct Nov
Actual Luas BAP Target Actual Luas BAP Target Actual Luas BAP
18 18 18 11 11 11
59 59 38 38 38
7 7
51 51 35 35 35
46 46 70 70 70 54 54 54
27 27 27
10 10 -

42 42 20 20 20 34 34 34
8 8 18 18 18 43 43 43
40 40 43 43 43 54 54 54
19 19 19 6 6 6
31 31 - -
294 294 260 260 260 229 229 229
- -
Dec Jan-22 Feb-22
Target Actual Luas BAP Target Actual Luas BAP Target Actual
15 15 15 134 134 134
19 19 19 105 105 102 59 59
7 7 7
35 35 35 8 8 8 6 6
16 16 16
11 11 11
57 57
17 17 17 16 16 16 32 32
21 21 21
29 29 29
66 66 66 93 93 93 100 100
19 19 19 13 13

220 220 220 390 390 387 267 267


- - - (3.39) -

4702
Feb-22 Mar-22 Up to March
Luas BAP Target Actual Luas BAP Target Actual Luas BAP
179.29 179.29 179.29
59 355.24 355.24 351.85
6 6 6 186.89 186.89 186.89
6 40 40 40 310.88 310.88 310.88
6 6 6 399.77 399.77 399.77
37.46 37.46 37.46
57 26 26 26 134.66 134.66 134.66
32 64.28 64.28 64.28
14 14 14 235.97 235.97 235.97
123.53 123.53 123.53
100 41 41 60 554.93 554.93 573.42
13 18 18 17 75.71 75.71 74.67
321.45 321.45 321.45
267 152 152 169 2,980 2,980 2,994
- - 17.45 - 14.06
3,068.00 2,994 73.88
Clone planting November result (monitoring result of January planting)
Up to Des 21 Jan Feb
Area Unit
Target BAP Target BAP Target BAP
1 45 45 35 134 - -
2 159 191 69 102 54 59
1 3 167 181 - - - -
4 248 258 8 8 6 6
5 495 378 16 16 - -
7 37 37 - - - -
8 52 52 - - 57 57
2
9 17 17 16 16 32 32
11 252 222 - - - -
10 124 124 - - - -
13 317 321 93 93 93 100
3
14 25 25 19 19 13 13
15 355 321 - - - -
Total 2,295 2,171 255 387 255 267
(124)
1,905 - -
Clone Planting Target in Jan
2295
Wilayah Unit

1
2
1 3
4
5
9
2 11
10
13
3
14
15
Total
Mar Up to Mar 22
Target BAP Target BAP
- - 80 179.29
- 3 - 279 351.85 351.53 - 0.32
6 6 173 186.89 - 186.89
40 48 301 318.62 308.54 - 10.08
6 6 517 399.77 - 399.77
- - 37 37.46 - 37.46
26 26 135 134.66 81.77 - 52.89
- - 64 64.28 - 64.28
14 28 266 250.07 235.85 - 14.22
- - 124 123.53 - 123.53
- 7 60 496 573.42 555.21 - 18.21
18 17 76 74.67 75.71 1.04
- 12 355 333.44 333.44 -
100 203 2,905 3,027.95 #REF!
(154.60) 122.65
(75) 2,960.07
- 67.88
RENCANA TANAM BIBIT CLONE APRIL 2022
UPDATE SD.TANGGAL 15 APRIL 22
JENIS PROGRES
UNIT BLOK CPT STAND LUAS
LAHAN LAPANGAN
2 MERBAU 2 19 b 20.73 LOA Selesai Tanam
4 SODONG UTARA 30 b1 10.08 LOA Selesai Tanam
4 CABAN SELATAN 05 a 4.86 LOA Selesai Tanam
4 SODONG UTARA 22 c 11.93 LOA Selesai Tanam
4 SODONG UTARA 08 b 13.51 LOA Selesai Tanam
W1 Total 61.11 - -
8 TERAS 2 a1 25.50 LOA Selesai tanam
11 PENYEMBANGAN 38 g 13.53 LOA Selesai Tanam
11 BUKIT KULIM 30 b 15.14 LOA Selesai Tanam
11 BUKIT KULIM 12 b 14.22 LOA Selesai Tanam
11 BUKIT KULIM 30 a 11.72 LOA Selesai Tanam
W2 Total 80.11 - -
13 LANTINGAN BARAT 19 c1 18.07 LOA Selesai Tanam
13 LANTINGAN BARAT 19 c4 1.14 LOA Selesai Tanam
13 LANTINGAN BARAT 19 a1 29.01 LOA Selesai Tanam
13 LANTINGAN BARAT 19 b1 16.14 LOA Selesai Tanam
13 LANTINGAN BARAT 19 d 28.15 LOA Selesai Tanam
13 SERDANG SELATAN 13 c 10.63 LOA Selesai Tanam
13 SERDANG SELATAN 23 b8 20.52 LOA Selesai Tanam
13 SERDANG UTARA 31 c1 13.63 LOA Selesai Tanam
15 SUBAT 54 b 18.28 LOA Selesai Tanam
15 SUBAT 39 b1 17.45 LOA Selesai Tanam
15 SUBAT 42 b1 18.44 LOA Selesai Tanam
15 SUBAT 50 f 8.87 LOA Selesai Tanam
W3 Total 200.33 - -
MHP Total 341.55 - -
Luas Tanam Jumlah Bibit
TANGGAL TANAM NO SPK TANGGAL SPK
(ha) terkirim (btg)
14-Mar-22 029068.SPK.02.TNM-LOA.03.2022 10-Mar-22 20.73 2,789
17-Mar-22 029140.SPK.04.TNM-LOA.03.2022 15-Mar-22 10.08 18,600
16-Apr-22 029410.SPK.04.TNM-LOA.04.2022 11-Apr-22 4.86 9360
21-Apr-00 029463.SPK.04.TNM-LOA.04.2022 19-Apr-22 11.93 21780
16-Apr-22 029422.SPK.04.TNM-LOA.04.2022 13-Apr-22 13.51 25980
- 223,261.00 61.11 78,509.07
15-Mar-22 022489.SPK.08.TNM-LOA.03.2022 10-Mar-22 25.50 51,180
8-Mar-22 022467.SPK.11.TNM-LOA.03.2022 7-Mar-22 13.53 21,941
13-Apr-22 022804.SPK.11.TNM-LOA.04.2022 17-Apr-22 15.14 27,300
10-Mar-22 022490.SPK.11.TNM-LOA.03.2022 10-Mar-22 14.22 29,400
13-Apr-22 022776.SPK.11.TNM-LOA.04.2022 9-Apr-22 11.72 21,180
- 80.11 151,001.00
15-Mar-22 024290.SPK.13.TNM-LOA.03.2022 8-Mar-22 18.07 37,200
30-Mar-22 024543.SPK.13.TNM-LOA.03.2022 29-Mar-22 1.14 2,088
16-Apr-22 024656.SPK.13.TNM-LOA.04.2022 11-Apr-22 29.01 58,320
15-Apr-22 024654.SPK.13.TNM-LOA.04.2022 11-Apr-22 16.14 32,340
20-Mar-22 024352.SPK.13.TNM-LOA.03.2022 20-Mar-22 28.15 57,960
18-Apr-22 024617.SPK.13.TNM-LOA.04.2022 8-Apr-22 10.63 19,320
9-Mar-22 024293.SPK.13.TNM-LOA.03.2022 8-Mar-22 20.52 40,140
9-Apr-22 024630.SPK.13.TNM-LOA.04.2022 9-Apr-22 13.63 24,600
05-Apr-2022 024634.SPK.15.TNM-LOA.04.2022 9-Apr-22 18.28 38,460
15-Mar-22 024340.SPK.15.TNM-LOA.03.2022 13-Mar-2022 17.45 33,240
15-Mar-22 024332.SPK.15.TNM-LOA.03.2022 10-Mar-2022 18.44 39,480
10-Apr-22 024631.SPK.15.TNM-LOA.04.2022 9-Apr-22 8.87 16,200
535,803.00 - 200.33 399,348.00
535,803.00 - 341.55 628,858.07
-
Tanggal BAP
Nomor Clone No BAP Tanam Luas BAP Tanam
Tanam
002869.BAP.02.TNM-LOA.04.2022 20.73 02-Apr-2022
003595.BAP.04.TNM-LOA.04.2022 10.08 15-Apr-22
003620.BAP.04.TNM-LOA.04.2022 4.86 24-Apr-22
003631.BAP.04.TNM-LOA.04.2022 11.93 26-Apr-22
003621.BAP.04.TNM-LOA.04.2022 13.51 24-Apr-22
- - 61.11
47 006966.BAP.08.TNM-LOA.04.2022 25.50 04-Apr-2022
47 003568.BAP.11.TNM-LOA.04.2022 13.53 8-Apr-22
47 003638.BAP.11.TNM-LOA.04.2022 15.14 30-Apr-22
47 003607.BAP.11.TNM-LOA.04.2022 14.22 18-Apr-22
47 003640.BAP.11.TNM-LOA.04.2022 11.72 30-Apr-22
- 80.11
005073.BAP.13.TNM-LOA.04.2022 18.07 21-Apr-22
005074.BAP.13.TNM-LOA.04.2022 1.14 21-Apr-22
005102.BAP.13.TNM-LOA.04.2022 29.01 30-Apr-22
005112.BAP.13.TNM-LOA.04.2022 16.14 30-Apr-22
005103.BAP.13.TNM-LOA.04.2022 28.15 30-Apr-22
005116.BAP.13.TNM-LOA.04.2022 10.63 30-Apr-22
005020.BAP.13.TNM-LOA.04.2022 20.52 6-Apr-22
005089.BAP.13.TNM-LOA.04.2022 13.63 26-Apr-22
006182.BAP.15.TNM-LOA.04.2022 18.28 30-Apr-22
006041.BAP.15.TNM-LOA.04.2022 17.45 6-Apr-22
006043.BAP.15.TNM-LOA.04.2022 18.44 6-Apr-22
006135.BAP.15.TNM-LOA.04.2022 8.87 26-Apr-22
- 200.33
- 341.55 -
KETERANGAN

Sudah BAP Tanam


Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam

Sudah BAP Tanam


Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam

Sudah BAP Tanam


Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
RENCANA TANAM BIBIT CLONE MAY 2022
UPDATE SD.TANGGAL 31 MAY 22
JENIS PROGRES TANGGAL
UNIT BLOK CPT STAND LUAS
LAHAN LAPANGAN TANAM
2 MERBAU 1 23 a 26.43 LOA Selesai Tanam 28-May-2022
3 TOMAN 2 18 a7 1.88 LOA Selesai Tanam 19-Ma-2022
4 SODONG UTARA 33 b6 3.89 LOA Selesai Tanam 15-May-2022
4 SODONG UTARA 33 c6 5.63 LOA Selesai Tanam 17-May-2022
4 SODONG UTARA 16 d1 16.66 LOA Selesai Tanam 13-May-2022
4 SODONG UTARA 16 b10 18.48 LOA Selesai Tanam 14-May-2022
4 CABAN SELATAN 50 b1 15.17 LOA Selesai Tanam 19-May-2022
W1 Total 88.14 - -
9 CAWANG 12 f5 17.19 LOA Selesai Tanam 15-Apr-2022
9 SELIBING 11 a2 23.96 LOA Selesai Tanam 20-May-2022
11 PENYEMBANGAN 29 d 16.32 LOA Selesai Tanam 07-May-2022
11 PENYEMBANGAN 37 j 16.47 LOA Selesai Tanam 17-May-2022
11 PENYEMBANGAN 37 b 15.91 LOA Selesai Tanam 12-May-2022
W2 Total 89.85 - -
13 SERDANG SELATAN 23 c 27.38 LOA Selesai Tanam 12-Apr-2022
13 SERDANG SELATAN 21 c3 6.11 LOA Selesai Tanam 19-May-2022
14 IBUL 02 b 27.54 LOA Selesai Tanam 07-Apr-2022
15 SUBAT 42 a1 18.28 LOA Selesai Tanam 15-Mar-22
15 SUBAT 50 c1 18.45 LOA Selesai Tanam 10-May-2022
15 SUBAT 55 b1 27.92 LOA Selesai Tanam 10-May-2022
W3 Total 125.68 - -
MHP Total 303.67 - -
Luas Tanam Jumlah Bibit No BAP
NO SPK TANGGAL SPK Nomor Clone
(ha) terkirim (btg) Tanam
029742.S 24-May-22 26.43 46200 002982.BAP.02
029659.SPK.03.TNM-LOA.05.2022
17-May-22 1.88 3,000 004757.BAP.03
029645.S 16-May-22 3.89 10620 003691.BAP.04
029644.S 16-May-22 5.63 7260 003690.BAP.04
029585.S 10-May-22 16.66 15000 003694.BAP.04
029584.S 10-May-22 18.48 20400 003677.BAP.04
029643.S 16-May-22 15.17 30480 003692.BAP.04
- 88.14 65,880
022819.S 13-Apr-22 17.19 544,800 47 004068.BAP.0
022992.S 8-May-22 23.96 18,000 47 004134.BAP.09
022970.S 5/7/2022 16.32 34320 47 003734.BAP.1
023049.S 5/12/2022 16.47 32460 47 003721.BAP.11
023050.S 5/12/2022 15.91 33000 47 003719.BAP.11
- 89.85 662,580.00 -
024665.S 11-Apr-22 27.38 54,600 005154.BAP.13
024863.S 13-May-22 6.11 10,800 005151.BAP.13
024594.S 7-Apr-22 27.54 56,340 004838.BAP.14.TN
024332.S 10-Mar-2022 18.28 39,480 006043.BAP.15
024882.S 11-May-22 18.45 36,000 006258.BAP.15.TN
024883.S 11-May-22 27.92 54,060 006281.BAP.15
- 125.68 251,280.00 -
- 303.67 979,740.00 -
-
Tanggal BAP
Luas BAP Tanam
Tanam
26.43 31-May-22
1.88 31-May-22
3.89 31-May-22
5.63 31-May-22
16.66 31-May-22
18.48 31-May-22
15.17 31-May-22
88.14
17.19 11-May-22
23.96 31-May-22
16.32 31-May-22
16.47 31-May-22
15.91 31-May-22
89.85
27.38 31-May-22
6.11 31-May-22
27.54 31-May-22
18.44 6-Apr-22
18.28 31-May-22
27.92 31-May-22
125.67
303.66
KETERANGAN

Sudah BAP Tanam


Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam

Sudah BAP Tanam


Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam

Sudah BAP Tanam


Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
RENCANA TANAM BIBIT CLONE JUNI 2022
UPDATE SD.TANGGAL 5 Juli 22
JENIS
UNIT BLOK CPT STAND LUAS PROGRES LAPANGAN
LAHAN
3 SUBANJERIJI 24 a 11.80 RA Selesai Tanam
3 SUBANJERIJI 24 b 1.32 RA Selesai Tanam
3 SUBANJERIJI 24 g 0.37 RA Selesai Tanam
4 SODONG UTARA 11 b 4.39 LOA Selesai Tanam
4 SODONG UTARA 21 a 24.11 LOA Selesai Tanam
4 SODONG UTARA 21 a 22.03 LOA Selesai Tanam
4 SODONG UTARA 16 c 9.22 LOA Selesai Tanam
4 SODONG UTARA 16 b 17.12 LOA Selesai Tanam
W1 Total 90.36 - -
9 CAWANG 12 d5 23.99 LOA Selesai Tanam
11 PENYEMBANGAN 44 a 12.50 LOA Selesai Tanam
11 PENYEMBANGAN 29 k 10.60 LOA Selesai Tanam
11 PENYEMBANGAN 05 c 22.86 LOA Selesai Tanam
W2 Total 69.95 - -
13 LANTINGAN BARAT 01 c4 15.23 LOA Selesai Tanam
13 LANTINGAN BARAT 03 b1 15.90 LOA Selesai Tanam
13 LANTINGAN BARAT 13 c 20.10 LOA Selesai Tanam
13 LANTINGAN BARAT 47 a 7.41 LOA Selesai Tanam
13 LANTINGAN BARAT 06 f 16.17 LOA Selesai Tanam
13 SERDANG SELATAN 22 b1 23.43 LOA Selesai Tanam
15 SUBAT 54 a 7.72 LOA Selesai Tanam
15 SUBAT 53 a 13.47 LOA Selesai Tanam
W3 Total 119.43 - -
MHP Total 279.74 - -
TANGGAL Luas Tanam Jumlah Bibit
NO SPK TANGGAL SPK
TANAM (ha) terkirim (btg)
24-May-2022 030133.SPK.03.TNM-R.A.06.2022 23-Jun-22 11.80 23,400
03-Jun-2022 030092.SPK.03.TNM-R.A.06.2022 20-Jun-22 1.32 2,100
02-Jun-2022 029940.SPK.03.TNM-R.A.06.2022 9-Jun-22 0.37 780
27-May-2022 029872.SPK.04.TNM-LOA.06.2022 5-Jun-22 4.39 7980
25-May-2022 029741.SPK.04.TNM-LOA.05.2022 24-May-22 24.11 43860
05-Jun-2022 029946.SPK.04.TNM-LOA.06.2022 10-Jun-22 22.03 42720
25-May-2022 029663.SPK.04.TNM-LOA.05.2022 18-May-22 9.22 16860
28-May-2022 029919.SPK.04.TNM-LOA.06.2022 7-Jun-22 17.12 31360
90.36 169,060.00
13 MEI 2022 022991.SPK.09.TNM-LOA.05.2022 8-May-22 23.99 43,565.84
### 023264.SPK.11.TNM-LOA.06.2022 6-Jun-22 12.50 26220
15-May-2022 022969.SPK.11.TNM-LOA.05.2022 5/7/2022 10.60 20640
### 023248.SPK.11.TNM-LOA.06.2022 4-Jun-22 22.86 41400
69.95 131,825.84
08-Jun-2022 025159.SPK.13.TNM-LOA.06.2022 6-Jun-22 15.23 30,660.00
11-Jun-2022 025237.SPK.13.TNM-LOA.06.2022 11-Jun-22 15.90 32,460.00
15-Jun-2022 025351.SPK.13.TNM-LOA.06.2022 17-Jun-22 20.10 39,780.00
01-Jun-2022 024862.SPK.13.TNM-LOA.05.2022 10-May-22 7.41 13,260.00
01-Jun-2022 025032.SPK.13.TNM-LOA.05.2022 27-May-22 16.17 33,180.00
16-May-22 024913.SPK.13.TNM-LOA.05.2022 14-May-22 23.43 46,200.00
22-May-2022 025004.SPK.15.TNM-LOA.05.2022 23-May-22 7.72 14,100.00
31-May-2022 025077.SPK.15.TNM-LOA.05.2022 31-May-22 13.47 24,420.00
119.43 234,060.00
279.74 534,945.84
No BAP Tanggal BAP
Nomor Clone Luas BAP Tanam
Tanam Tanam
004863.BAP.03 11.80 6/30/2022
004847.BAP.03 1.32 6/24/2022
004788.BAP.03 0.37 6/9/2022
003718.BAP.04 4.39 6/16/2022
003733.BAP.04 24.11 6/23/2022
003746.BAP.04 22.03 6/30/2022
003708.BAP.04 9.22 6/12/2022
003729.BAP.04 17.12 6/22/2022
90.36
47 004176.BAP.09 23.99 21-Jun-22
148 003786.BAP.11 12.50 6/25/2022
47 003756.BAP.11 10.60 6/9/2022
47 003815.BAP.11 22.86 6/30/2022
69.95
005278.BAP.13 15.23 30-Jun-22
005275.BAP.13 15.90 30-Jun-22
005277.BAP.13 20.10 30-Jun-22
005215.BAP.13 7.41 20-Jun-22
005268.BAP.13 16.17 30-Jun-22
005244.BAP.13 23.43 25-Jun-22
006346.BAP.15 7.72 21-Jun-22
006349.BAP.15 13.47 21-Jun-22
119.43
279.74
KETERANGAN

Sudah BAP Tanam


Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam

Sudah BAP Tanam


Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam

Sudah BAP Tanam


Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
RENCANA TANAM BIBIT CLONE JULI 2022
UPDATE SD.TANGGAL 7 Agustus 22
JENIS
UNIT BLOK CPT STAND LUAS PROGRES LAPANGAN
LAHAN
2 MERBAU 2 19 d 17.83 LOA Selesai Tanam
2 MERBAU 2 19 k 10.87 LOA Selesai Tanam
2 MERBAU 2 13 d 14.41 LOA Selesai Tanam
4 CABAN SELATAN 26 c 18.89 LOA Selesai Tanam
4 SODONG TIMUR 11 b 17.73 LOA Selesai Tanam
4 SODONG UTARA 10 a 9.83 LOA Selesai Tanam
4 SODONG UTARA 8 d 14.26 LOA Selesai Tanam
4 SODONG UTARA 12 a 13.72 LOA Selesai Tanam
4 SODONG UTARA 14 a 4.58 LOA Selesai Tanam
W1 Total 122.12 - -
7 SUBAN ULU 09 a 16.83 LOA Selesai Tanam
11 PENYEMBANGAN 28 k 8.16 LOA Selesai Tanam
W2 Total 24.99
13 LANTINGAN BARAT 23 b2 8.67 LOA Selesai Tanam
13 LANTINGAN BARAT 06 b 9.83 LOA Selesai Tanam
13 LANTINGAN BARAT 05 e3 26.63 LOA Selesai Tanam
13 SERDANG SELATAN 26 a3 10.28 LOA Selesai Tanam
13 SERDANG SELATAN 26 d2 7.85 LOA Selesai Tanam
13 LANTINGAN BARAT 06 a1 30.93 LOA Selesai Tanam
15 SUBAT 53 B1 18.94 LOA Selesai Tanam
15 SUBAT 44 e1 26.19 LOA Selesai Tanam
15 SUBAT 54 C1 6.22 LOA Selesai Tanam
W3 Total 145.54
MHP Total 292.65
315.00
22.35
266.65
TANGGAL Luas Tanam Jumlah Bibit
NO SPK TANGGAL SPK
TANAM (ha) terkirim (btg)
11-Jul-2022 030339.SPK.02.TNM-LOA.07.2022 12-Jul-22 17.83 34,560
11-Jul-2022 030340.SPK.02.TNM-LOA.07.2022 12-Jul-22 10.87 20,220
30-May-2022 029781.SPK.02.TNM-LOA.05.2022 30-May-22 14.41 26,160
25-Jun-2022 030175.SPK.04.TNM-LOA.06.2022 27-Jun-22 18.89 35,580
06-Jul-2022 030338.SPK.04.TNM-LOA.07.2022 12-Jul-22 17.73 34,357
01-Jul-2022 030298.SPK.04.TNM-LOA.07.2022 7-Jul-22 9.83 19,860
06-Jul-2022 030288.SPK.04.TNM-LOA.07.2022 6-Jul-22 14.26 25,860
16-juli-2022 030284.SPK.04.TNM-LOA.07.2022 6-Jul-22 13.72 24,900
05-Jul-2022 030341.SPK.04.TNM-LOA.07.2022 12-Jul-22 4.58 8,640
122.12 230,137
07-Jul-2022 023598.SPK.07.TNM-LOA.07.2022 6-Jul-22 16.83 34,440
### 023641.SPK.11.TNM-LOA.07.2022 12-Jul-22 8.16 14,760
24.99 49,200
09-Jul-2022 025628.SPK.13.TNM-LOA.07.2022 7-Jul-22 8.67 18,420
04-Jun-2022 025033.SPK.13.TNM-LOA.05.2022 27-May-22 9.83 19,680
02-Jul-2022 025708.SPK.13.TNM-LOA.07.2022 18-Jul-22 26.63 55920
14-Jul-2022 025706.SPK.13.TNM-LOA.07.2022 18-Jul-22 10.28 22,680
14-Jul-2022 025596.SPK.13.TNM-LOA.07.2022 6-Jul-22 7.85 16,560
29-Jul-2022 025796.SPK.13.TNM-LOA.07.2022 29-Jul-22 31.23 64,860
18-Jul-2022 025673.SPK.15.TNM-LOA.07.2022 16-Jul-2022 18.94 39,180
30-Jun-2022 025449.SPK.15.TNM-LOA.06.2022 24-Jun-22 26.19 52,620
01-Jul-2022 025448.SPK.15.TNM-LOA.06.2022 24-Jun-22 6.22 11,280
145.84 301,200
292.95 580,537
No BAP Tanggal BAP
Nomor Clone Luas BAP Tanam KETERANGAN
Tanam Tanam
003096.BAP.02 17.54 31-Jul-22 Sudah BAP Tanam
003095.BAP.02 10.82 31-Jul-22 Sudah BAP Tanam
003031.BAP.02 14.38 8-Jul-22 Sudah BAP Tanam
003804.BAP.04 19.11 31-Jul-22 Sudah BAP Tanam
003810.BAP.04 17.74 31-Jul-22 Sudah BAP Tanam
003807.BAP.04 9.44 31-Jul-22 Sudah BAP Tanam
003809.BAP.04 13.74 31-Jul-22 Sudah BAP Tanam
003806.BAP.04 13.53 31-Jul-22 Sudah BAP Tanam
003796.BAP.04 4.49 31-Jul-22 Sudah BAP Tanam
120.79
47 001345.BAP.07 16.49 31-Jul-22 Sudah BAP Tanam
47 003883.BAP.11 8.18 31-Jul-22 Sudah BAP Tanam
24.67
005362.BAP.13 8.92 29-Jul-22 Sudah BAP Tanam
005341.BAP.13 9.73 21-Jul-22 Sudah BAP Tanam
005382.BAP.13 26.81 31-Jul-22 Sudah BAP Tanam
005383.BAP.13 11.14 31-Jul-22 Sudah BAP Tanam
005385.BAP.13 8.08 31-Jul-22 Sudah BAP Tanam
005380.BAP.13 31.08 31-Jul-22 Sudah BAP Tanam
006525.BAP.15 19.05 31-Jul-22 Sudah BAP Tanam
006523.BAP.15 26.52 31-Jul-22 Sudah BAP Tanam
006433.BAP.15 6.16 17-Jul-22 Sudah BAP Tanam
147.49
292.95
RENCANA TANAM BIBIT CLONE AGUSTUS 2022
UPDATE SD.TANGGAL 20 Agustus 22
JENIS PROGRES
UNIT BLOK CPT STAND LUAS
LAHAN LAPANGAN
2 MERBAU 1 23 b 13.83 LOA Selesai Tanam
3 TOMAN 2 18 c 10.30 LOA Selesai Tanam
3 SUBANJERIJI 24 h 2.19 RA Selesai Tanam
3 SUBANJERIJI 18 c 3.53 LOA Selesai Tanam
4 SODONG UTARA 8 a5 12.83 LOA Selesai Tanam
4 SODONG UTARA 10 b1 13.43 LOA Selesai Tanam
4 SODONG UTARA 11 a4 16.49 LOA Selesai Tanam
4 SODONG UTARA 11 b1 17.64 LOA Selesai Tanam
4 SODONG UTARA 32 a5 17.62 LOA Selesai Tanam
W1 Total 107.86 - -
7 BAUNG UTARA 20 a7 6.31 LOA Selesai Tanam
8 TEBING INDAH 2 27 b 20.80 LOA Selesai Tanam
11 PENYEMBANGAN 43 h 18.47 LOA Selesai Tanam
11 PENYEMBANGAN 28 b 18.60 LOA Selesai Tanam
W2 Total 64.18
13 LANTINGAN BARAT 04 b1 21.75 LOA Selesai Tanam
13 LANTINGAN BARAT 04 b8 27.48 LOA Selesai Tanam
13 LANTINGAN BARAT 24 c2 0.29 LOA Selesai Tanam
13 LANTINGAN BARAT 03 e1 28.63 LOA Selesai Tanam
15 SUBAT 45 d1 24.52 LOA Selesai Tanam
W3 Total 102.67
MHP Total 274.71

233.00
242.94 291 48
9.94
TANGGAL Luas Tanam Jumlah Bibit Nomor
NO SPK
TANAM (ha) terkirim (btg) Clone
14-Jul-2022 030328.SPK.02.TNM-LOA.07.2022 13.83 27,000
29-Apr-2022 029417.SPK.03.TNM-LOA.04.2022 10.30 18,660
03-Jun-2022 030506.SPK.03.TNM-R.A.07.2022 2.19 3,960
18-Jul-2022 030367.SPK.03.TNM-LOA.07.2022 3.53 6,300
18-juli-2022 030286.SPK.04.TNM-LOA.07.2022 12.83 23,280
02-Aug-2022 030726.SPK.04.TNM-LOA.08.2022 13.43 24,600
05-Aug-2022 030477.SPK.04.TNM-LOA.07.2022 16.49 29,040
01-Aug-2022 030475.SPK.04.TNM-LOA.07.2022 17.64 29,400
10-Aug-2022 030657.SPK.04.TNM-LOA.08.2022 17.62 27,600
107.86 189,840
15-Aug-22 023929.SPK.07.TNM-LOA.08.2022 6.31 12,660 148
04-Jul-2022 023950.SPK.08.TNM-LOA.08.2022 20.80 36,000 47
### 023593.SPK.11.TNM-LOA.07.2022 18.47 30,771 47
18-Jul-22 023702.SPK.11.TNM-LOA.07.2022 18.60 30,988 47
64.18 110,419
11-Aug-2022 025882.SPK.13.TNM-LOA.08.2022 21.75 48,120
11-Aug-2022 025968.SPK.13.TNM-LOA.08.2022 27.48 55,860
28-Jul-2022 025768.SPK.13.TNM-LOA.07.2022 0.29 540
09-Aug-2022 025946.SPK.13.TNM-LOA.08.2022 28.63 58,080
5-Aug-22 025710.SPK.15.TNM-LOA.07.2022 24.52 48,840
102.67 211,440
274.71 511,699
31.29

18
Tanggal BAP
No BAP Tanam Luas BAP Tanam
Tanam
003153.BAP.02.TNM-LOA.08.2022 13.83 23-Aug-22
004989.BAP.03.TNM-LOA.08.2022 10.04 31-Aug-22
004930.BAP.03.TNM-R.A.08.2022 2.18 10-Aug-22
004974.BAP.03.TNM-LOA.08.2022 3.71 31-Aug-22
003835.BAP.04.TNM-LOA.08.2022 12.45 13-Aug-22
003880.BAP.04.TNM-LOA.08.2022 13.34 31-Aug-22
003867.BAP.04.TNM-LOA.08.2022 16.44 31-Aug-22
003877.BAP.04.TNM-LOA.08.2022 17.47 31-Aug-22
003879.BAP.04.TNM-LOA.08.2022 17.72 31-Aug-22
107.18
001362.BAP.07.TNM-LOA.08.2022 6.56 27-Aug-22
007307.BAP.08.TNM-LOA.08.2022 20.74 31-Aug-22
003978.BAP.11.TNM-LOA.08.2022 16.74 23-Aug-22
003990.BAP.11.TNM-LOA.08.2022 18.18 28-Aug-22
- 62.22
005505.BAP.13.TNM-LOA.08.2022 21.75 31-Aug-22
005506.BAP.13.TNM-LOA.08.2022 27.48 31-Aug-22
005471.BAP.13.TNM-LOA.08.2022 0.29 26-Aug-22
005512.BAP.13.TNM-LOA.08.2022 28.63 31-Aug-22
006595.BAP.15.TNM-LOA.08.2022 23.92 27-Aug-22
102.07
271.47
KETERANGAN

Sudah BAP Tanam


Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam

Sudah BAP Tanam


Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam

Sudah BAP Tanam


Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
RENCANA TANAM BIBIT CLONE SEPTEMBER 2022
UPDATE SD.TANGGAL 4 October 22
JENIS PROGRES
UNIT BLOK CPT STAND LUAS
LAHAN LAPANGAN
2 MERBAU 1 26 b 13.10 LOA Selesai Tanam
2 MERBAU 1 28 c 8.84 LOA Selesai Tanam
4 CABAN SELATAN 34 A2 6.62 LOA SELESAI TANAM
4 CABAN SELATAN 45 E1 19.43 LOA SELESAI TANAM
4 SODONG UTARA 14 B2 21.20 LOA SELESAI TANAM
4 SODONG UTARA 14 A6 13.41 LOA SELESAI TANAM
4 SODONG UTARA 20 A1 20.29 LOA SELESAI TANAM
4 SODONG UTARA 01 A 22.22 LOA SELESAI TANAM
W1 Total 125.11
7 SUBAN ULU 17 b4 6.75 LOA Selesai Tanam
W2 Total 6.75
10 KERUH 2 28 b 18.53 LOA Selesai Tanam
13 SERDANG SELATAN 18 g1 24.88 LOA Selesai Tanam
13 SERDANG SELATAN 21 a3 25.57 LOA Selesai Tanam
13 LANTINGAN BARAT 13 a2 29.39 LOA Selesai Tanam

W3 Total 98.37
MHP Total 230.23

Luncuran Agust 123.38


Murni Sep
TANGGAL Luas Tanam Jumlah Bibit
NO SPK TANGGAL SPK
TANAM (ha) terkirim (btg)
04-Aug-2022 030521.SPK.02.TNM-LOA.08.2022 3-Aug-22 13.10 27,480
04-Aug-2022 030520.SPK.02.TNM-LOA.08.2022 3-Aug-22 8.84 18,420
5.9.2022 030890.SPK.04.TNM-LOA.09.2022 4-Sep-22 6.62 12,000
10.9.2022 030872.SPK.04.TNM-LOA.09.2022 2-Sep-22 19.43 35,100
1.9.2022 030953.SPK.04.TNM-LOA.09.2022 9-Sep-22 21.20 39,660
2.9.2022 030742.SPK.04.TNM-LOA.08.2022 20-Aug-22 13.41 24,300
5.9.2022 030785.SPK.04.TNM-LOA.08.2022 25-Aug-22 20.29 38,040
10.9.2022 030867.SPK.04.TNM-LOA.09.2022 2-Sep-22 22.22 41,220
125.11 236,220
14-Aug-22 023866.SPK.07.TNM-LOA.08.2022 4-Aug-22 6.75 13,980
6.75 13,980
2-Sep-22 026018.SPK.10.TNM-LOA.08.2022 14-Aug-22 18.53 36,180
05-Sep-2022 026217.SPK.13.TNM-LOA.09.2022 3-Sep-22 24.88 49,500
03-Sep-2022 026045.SPK.13.TNM-LOA.08.2022 17-Aug-22 25.57 50,040
02-Aug-2022 025859.SPK.13.TNM-LOA.08.2022 1-Aug-22 29.39 59,160

98.37 158,700
230.23 408,900
Tanggal BAP
Nomor Clone No BAP Tanam Luas BAP Tanam
Tanam
003214.BAP.02.TNM-LOA.09.2022 12.68 14-Sep-2022
003215.BAP.02.TNM-LOA.09.2022 8.66 14-Sep-2022
003914.BAP.04.TNM-LOA.09.2022 6.57 19-Sep-2022
003950.BAP.04.TNM-LOA.09.2022 18.8 30-Sep-2022
003909.BAP.04.TNM-LOA.09.2022 20.87 18-Sep-2022
003916.BAP.04.TNM-LOA.09.2022 12.85 20-Sep-2022
003919.BAP.04.TNM-LOA.09.2022 20.82 20-Sep-2022
003952.BAP.04.TNM-LOA.09.2022 21.88 30-Sep-2022
123.13
148 001412.BAP.07.TNM-LOA.09.2022 6.75 30-Sep-22
6.75
005633.BAP.10.TNM-LOA.09.2022 18.55 14-Aug-22
005594.BAP.13.TNM-LOA.09.2022 25.52 30-Sep-22
005593.BAP.13.TNM-LOA.09.2022 25.00 30-Sep-22
005573.BAP.13.TNM-LOA.09.2022 28.96 28-Sep-22

98.03
227.91
KETERANGAN

Sudah BAP Tanam


Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam

Sudah BAP Tanam

Sudah BAP Tanam


Sudah BAP Tanam
Sudah BAP Tanam
Sudah BAP Tanam
RENCANA TANAM BIBIT CLONE OKTOBER 2022
UPDATE SD.TANGGAL 31 October 22
JENIS
UNIT BLOK CPT STAND LUAS PROGRES LAPANGAN
LAHAN
4 CABAN SELATAN 43 b 10.97 LOA Selesai Tanam
4 CABAN SELATAN 40 b 8.98 LOA Selesai Tanam
4 SODONG TIMUR 08 b 10.12 LOA Selesai Tanam
4 SODONG UTARA 21 b 3.56 LOA Selesai Tanam
5 NIRU 01 d/7 10.47 LOA Selesai Tanam
5 NIRU 06 a/1 4.30 LOA Selesai Tanam
5 NIRU 06 a/6 8.23 LOA Selesai Tanam
5 NIRU 06 C/2 8.34 LOA Selesai Tanam
5 SODONG BARAT 21 b/5 25.49 LOA Selesai Tanam
5 SODONG BARAT 21 d/1 16.28 LOA Selesai Tanam
W1 Total 106.74
10 KERUH 2 29 b3 8.70 LOA Selesai Tanam
10 KERUH 2 31 b 23.51 LOA Selesai Tanam
13 RESAM 06 e1 20.33 LOA Selesai Tanam
13 LANTINGAN BARAT 24 b1 19.53 LOA Selesai Tanam
13 LANTINGAN BARAT 24 d1 21.26 LOA Selesai Tanam
13 SERDANG SELATAN 21 b2 16.52 LOA Selesai Tanam
13 SERDANG SELATAN 21 b4 15.89 LOA Selesai Tanam
15 SUBAT 13 c2 14.75 LOA Selesai Tanam
W3 Total 140.49
MHP Total 247.23
TANGGAL Luas Tanam Jumlah Bibit
NO SPK TANGGAL SPK
TANAM (ha) terkirim (btg)
2-Oct-22 031089.SPK.04.TNM-LOA.09.2022 22-Sep-22 10.97 19,920
2-Oct-22 031096.SPK.04.TNM-LOA.09.2022 22-Sep-22 8.98 16,200
17-Oct-22 031371.SPK.04.TNM-LOA.10.2022 13-Oct-22 10.12 16,800
10-Oct-22 031343.SPK.04.TNM-LOA.10.2022 12-Oct-22 3.56 6,000
12-Oct-22 031298.SPK.05.TNM-LOA.10.2022 9-Oct-22 10.47 18,720
14-Oct-22 031338.SPK.05.TNM-LOA.10.2022 12-Oct-22 4.30 8,100
14-Oct-22 031340.SPK.05.TNM-LOA.10.2022 12-Oct-22 8.23 14,940
20-Oct-22 031418.SPK.05.TNM-LOA.10.2022 19-Oct-22 8.34 15,060
16-Oct-22 031228.SPK.05.TNM-LOA.10.2022 3-Oct-22 25.49 49,380
11-Oct-22 031230.SPK.05.TNM-LOA.10.2022 3-Oct-22 16.28 34,320
106.74 199,440
18-Oct-2022 026662.SPK.10.TNM-LOA.10.2022 10-Oct-22 8.70 15,799
13-Oct-2022 026311.SPK.10.TNM-LOA.09.2022 11-Sep-22 23.51 46,320
07-Oct-2022 026505.SPK.13.TNM-LOA.09.2022 29-Sep-22 20.33 42,300
08-Oct-2022 026632.SPK.13.TNM-LOA.10.2022 6-Oct-22 19.53 40,860
12-Oct-2022 026683.SPK.13.TNM-LOA.10.2022 11-Oct-22 21.26 42,540
04-Oct-2022 026577.SPK.13.TNM-LOA.10.2022 2-Oct-22 16.52 33,600
11-Oct-2022 026610.SPK.13.TNM-LOA.10.2022 6-Oct-22 15.89 32,820
10-Oct-2022 026585.SPK.15.TNM-LOA.10.2022 3-Oct-22 14.75 29,520
140.49 283,759
247.23 483,199
Tanggal BAP
Nomor Clone No BAP Tanam Luas BAP Tanam
Tanam
003996.BAP.04.TNM-LOA.10.2022 10.95 21-Oct-22
003983.BAP.04.TNM-LOA.10.2022 9.19 17-Oct-22
004005.BAP.04.TNM-LOA.10.2022 9.93 23-Oct-22
004003.BAP.04.TNM-LOA.10.2022 3.81 23-Oct-22
006570.BAP.05.TNM-LOA.10.2022 10.21 23-Oct-22
006568.BAP.05.TNM-LOA.10.2022 4.29 23-Oct-22
006566.BAP.05.TNM-LOA.10.2022 8.17 23-Oct-22
006591.BAP.05.TNM-LOA.10.2022 8.13 26-Oct-22
006611.BAP.05.TNM-LOA.10.2022 24.72 31-Oct-22
006609.BAP.05.TNM-LOA.10.2022 15.94 31-Oct-22
105.34
005751.BAP.10.TNM-LOA.10.2022 8.63 31-Oct-22
005692.BAP.10.TNM-LOA.10.2022 23.15 16-Oct-22
005701.BAP.13.TNM-LOA.11.2022 20.68 31-Oct-22
005704.BAP.13.TNM-LOA.10.2022 19.43 31-Oct-22
005705.BAP.13.TNM-LOA.10.2022 20.83 31-Oct-22
005683.BAP.13.TNM-LOA.10.2022 16.44 31-Oct-22
005684.BAP.13.TNM-LOA.10.2022 16.36 31-Oct-22
006796.BAP.15.TNM-LOA.10.2022 14.88 31-Oct-22
140.40
245.74
KETERANGAN
RENCANA TANAM BIBIT CLONE NOVEMBER 2022
UPDATE SD.TANGGAL 30 Nopember 22
JENIS
UNIT BLOK CPT STAND LUAS
LAHAN PROGRES LAPANGAN
2 MERBAU 1 04 B 4.52 LOA Selesai Tanam
2 MERBAU 1 28 A 15.25 LOA Selesai Tanam
2 MERBAU 1 25 B 4.42 LOA Selesai Tanam
4 CABAN SELATAN 12 b16 13.90 LOA Selesai Tanam
4 CABAN SELATAN 39 a12 8.30 LOA Selesai Tanam
4 CABAN SELATAN 38 a3 6.69 LOA Selesai Tanam
4 CABAN SELATAN 16 a1 8.03 LOA Selesai Tanam
4 SODONG UTARA 4 b1 2.81 LOA Selesai Tanam
4 SODONG TIMUR 7 a 6.83 LOA Selesai Tanam
5 NIRU 06 e/1 13.55 LOA Selesai Tanam
5 NIRU 06 b/1 18.20 LOA Selesai Tanam
5 SODONG BARAT 20 b/6 0.79 LOA Selesai Tanam
5 SODONG BARAT 18 a/2 5.88 LOA Selesai Tanam
W1 Total 109.17 -
8 IPUH 1 c3 7.00 LOA Selesai Tanam
8 TEBING INDAH 2 45 h1 28.26 LOA Selesai Tanam
9 DERAS 06 A3 7.64 LOA Selesai Tanam
11 PENYEMBANGAN 43 g 11.61 LOA Selesai Tanam
11 PENYEMBANGAN 43 l 8.84 LOA Selesai Tanam
W2 Total 63.35 - -
10 KERUH 2 29 a 13.29 LOA Selesai Tanam
10 KERUH 2 30 b 30.17 LOA Selesai Tanam
15 KERUH 1 01 a1 1.88 LOA Selesai Tanam
15 KERUH 1 01 c1 16.36 LOA Selesai Tanam
15 KERUH 1 01 a2 20.95 LOA Selesai Tanam
15 KERUH 1 01 b4 9.26 LOA Selesai Tanam
15 SUBAT 13 c 11.83 LOA Selesai Tanam
W3 Total 103.74
MHP Total 276.26

Luncuran Oct 61.53


Murni Nov 214.73
TANGGAL Luas Tanam Jumlah Bibit
NO SPK TANGGAL SPK
TANAM (ha) terkirim (btg)
26-Oct-22 031493.SPK.02.TNM-LOA.10.2022 24-Oct-22 4.52 8,760
1-Nov-22 031618.SPK.02.TNM-LOA.11.2022 1-Oct-22 15.25 29,700
10-Oct-22 031666.SPK.02.TNM-LOA.11.2022 8-Nov-22 4.42 8,400
1-Nov-22 031568.SPK.04.TNM-LOA.10.2022 31-Oct-22 13.90 29,220
1-Nov-22 031566.SPK.04.TNM-LOA.10.2022 31-Oct-22 8.30 15,000
16-Nov-22 031742.SPK.04.TNM-LOA.11.2022 15-Nov-22 6.69 12,540
6-Nov-22 031633.SPK.04.TNM-LOA.11.2022 5-Nov-22 8.03 14,580
1-Nov-22 031564.SPK.04.TNM-LOA.10.2022 31-Oct-22 2.81 3,600
6-Nov-22 031631.SPK.04.TNM-LOA.11.2022 5-Nov-22 6.83 12,360
26-Oct-22 031452.SPK.05.TNM-LOA.10.2022 21-Oct-22 13.55 23,100
10-Nov-22 031597.SPK.05.TNM-LOA.11.2022 2-Nov-22 18.20 37,260
7-Nov-22 031641.SPK.05.TNM-LOA.11.2022 6-Nov-22 0.79 1,500
5-Nov-22 031604.SPK.05.TNM-LOA.11.2022 4-Nov-22 5.88 11,040
109.17 207,060
3-Nov-22 024847.SPK.08.TNM-LOA.11.2022 1-Nov-22 7.00 13,320
20-Nov-22 024929.SPK.08.TNM-LOA.11.2022 7-Nov-22 28.26 56,700
17-Nov-22 025054.SPK.09.TNM-LOA.11.2022 17-Nov-22 7.64 14,700
1-Nov-22 024838.SPK.11.TNM-LOA.10.2022 31-Oct-22 11.61 23,700
3-Nov-22 024872.SPK.11.TNM-LOA.11.2022 3-Nov-22 8.84 16,020
- 63.35 124,440
26-Oct-22 026889.SPK.10.TNM-LOA.10.2022 26-Oct-2022 13.29 27,540
3-Oct-22 026554.SPK.10.TNM-LOA.10.2022 1-Oct-22 30.17 59,040
6-Nov-22 027030.SPK.15.TNM-LOA.11.2022 5-Nov-22 1.88 3,360
1-Nov-22 026870.SPK.15.TNM-LOA.10.2022 23-Oct-22 16.36 29,700
1-Nov-22 026898.SPK.15.TNM-LOA.10.2022 27-Oct-22 20.95 38,040
3-Nov-22 027004.SPK.15.TNM-LOA.11.2022 2-Nov-22 9.26 16,800
26-Oct-22 026739.SPK.15.TNM-LOA.10.2022 15-Oct-22 11.83 23,520
103.74 362,160
276.26 693,660
Luas BAP Tanggal BAP
Nomor Clone No BAP Tanam
Tanam Tanam
003351.BAP.02.TNM-LOA.11.2022 4.21 24-Nov-22
003370.BAP.02.TNM-LOA.11.2022 15.19 30-Nov-22
003373.BAP.02.TNM-LOA.11.2022 4.43 30-Nov-22
004093.BAP.04.TNM-LOA.11.2022 13.89 30-Nov-22
004070.BAP.04.TNM-LOA.11.2022 8.26 15-Nov-22
004095.BAP.04.TNM-LOA.11.2022 6.73 30-Nov-22
004099.BAP.04.TNM-LOA.11.2022 7.82 30-Nov-22
004058.BAP.04.TNM-LOA.11.2022 2.75 12-Nov-22
004100.BAP.04.TNM-LOA.11.2022 6.83 30-Nov-22
006631.BAP.05.TNM-LOA.11.2022 13.04 10-Nov-22
006694.BAP.05.TNM-LOA.11.2022 18.01 30-Nov-22
006700.BAP.05.TNM-LOA.11.2022 0.79 30-Nov-22
006672.BAP.05.TNM-LOA.11.2022 5.83 25-Nov-22
107.78
47 007493.BAP.08.TNM-LOA.11.2022 7.15 17-Nov-22
148 007546.BAP.08.TNM-LOA.11.2022 27.98 30-Nov-22
148 004524.BAP.09.TNM-LOA.11.2022 7.57 30-Nov-22
47 004347.BAP.11.TNM-LOA.11.2022 11.13 20-Nov-22
47 004374.BAP.11.TNM-LOA.11.2022 8.74 25-Nov-22
62.57
005776.BAP.10.TNM-LOA.11.2022 13.42 8-Nov-22
005855.BAP.10.TNM-LOA.11.2022 29.93 30-Nov-22
006852.BAP.15.TNM-LOA.11.2022 1.86 23-Nov-22
006851.BAP.15.TNM-LOA.11.2022 16.38 23-Nov-22
006858.BAP.15.TNM-LOA.11.2022 20.87 25-Nov-22
006864.BAP.15.TNM-LOA.11.2022 9.29 30-Nov-22
006859.BAP.15.TNM-LOA.11.2022 11.78 25-Nov-22
103.53
273.88
KETERANGAN
RENCANA TANAM BIBIT CLONE DESEMBER 2022
UPDATE SD.TANGGAL 29 Desember 22

JENIS
UNIT BLOK CPT STAND LUAS
LAHAN PROGRES LAPANGAN

3 TOMAN 1 17 f1 13.88 LOA Selesai Tanam


4 CABAN SELATAN 45 a1 4.39 LOA Selesai Tanam
4 CABAN SELATAN 43 b4 11.89 LOA Selesai Tanam
5 NIRU 1 a1 1.06 LOA Selesai Tanam
5 NIRU 18 b1 18.44 LOA Selesai Tanam
5 SODONG BARAT 20 b/9 10.57 LOA Selesai Tanam
5 SODONG BARAT 9 a1 6.41 LOA Selesai Tanam
5 SODONG SELATAN 20 a 4.33 LOA Selesai Tanam
W1 Total 70.97 - -
8 TEBING INDAH 1 37 a 24.84 LOA Selesai Tanam
8 TEBING INDAH 1 37 b 22.56 LOA Selesai Tanam
8 TEBING INDAH 2 45 m 17.67 LOA Selesai Tanam
8 TEBING INDAH 2 45 n 18.22 LOA Selesai Tanam
9 DERAS 06 c7 34.36 LOA Selesai Tanam
9 DERAS 06 F2 12.30 LOA Selesai Tanam
W2 Total 129.95 - -
10 KERUH 2 23 c2 7.71 LOA Selesai Tanam
10 KERUH 2 23 c2 7.19 LOA Selesai Tanam
15 SUBAT 14 c1 21.27 LOA Selesai Tanam
15 SUBAT 40 b1 18.21 LOA Selesai Tanam
15 KERUH 1 20 c3 2.86 LOA Selesai Tanam
15 KERUH 1 20 a6 6.84 LOA Selesai Tanam
15 KERUH 1 18 b1 1.86 LOA Selesai Tanam
W3 Total 65.94 - -
MHP Total 266.86 - -
TANGGAL Luas Tanam Jumlah Bibit
NO SPK TANGGAL SPK
TANAM (ha) terkirim (btg)

03-Dec-2022 031880.SPK.03.TNM-LOA.12.2022 12/1/2022 13.88 27,240


13-Dec-2022 031943.SPK.04.TNM-LOA.12.2022 6-Dec-22 4.39 7,980
06-Dec-2022 031895.SPK.04.TNM-LOA.12.2022 2-Dec-22 11.89 21,600
26-Nov-22 031836.SPK.05.TNM-LOA.11.2022 25-Nov-22 1.06 1,920
4-Dec-22 031898.SPK.05.TNM-LOA.12.2022 3-Dec-22 18.44 38,760
10-Nov-22 031673.SPK.05.TNM-LOA.11.2022 9-Nov-22 10.57 20,220
15-Dec-22 032026.SPK.05.TNM-LOA.12.2022 14-Dec-22 6.41 11,700
7-Dec-22 031939.SPK.05.TNM-LOA.12.2022 6-Dec-22 4.33 7,860
- 70.97 137,280
12-Dec-22 025360.SPK.08.TNM-LOA.12.2022 12-Dec-22 24.84 18,000
29-Nov-22 025167.SPK.08.TNM-LOA.11.2022 29-Nov-22 22.56 31,920
11-Nov-22 025008.SPK.08.TNM-LOA.11.2022 12-Nov-22 17.67 34,740
11-Nov-22 025007.SPK.08.TNM-LOA.11.2022 12-Nov-22 18.22 39,240
10-Des-2022 025403.SPK.09.TNM-LOA.12.2022 16-Dec-22 34.36 36,000
17-Nov-2022 025098.SPK.09.TNM-LOA.11.2022 21-Nov-22 12.30 22,337
- 129.95 182,237
5-Dec-22 027261.SPK.10.TNM-LOA.11.2022 24-Nov-22 7.71 13,980
30-Nov-22 027263.SPK.10.TNM-LOA.11.2022 24-Nov-22 7.19 14,280
30/11/22 027306.SPK.15.TNM-LOA.11.2022 11/28/2022 21.27 43,020
06/12/22 027363.SPK.15.TNM-LOA.12.2022 12/2/2022 18.21 38,580
13/12/22 027447.SPK.15.TNM-LOA.12.2022 12/8/2022 2.86 5,160
16/12/22 027445.SPK.15.TNM-LOA.12.2022 12/8/2022 6.84 12,420
13/12/22 027446.SPK.15.TNM-LOA.12.2022 12/8/2022 1.86 3,360
- 65.94 130,800
- 266.86 450,317
Luas BAP Tanggal BAP
Nomor Clone No BAP Tanam
Tanam Tanam

148 005150.BAP.03.T 13.91 24-Dec-22


148 004145.BAP.04.T 4.41 27-Dec-22
047 004138.BAP.04.T 12.22 25-Dec-22
047 006747.BAP.05.T 1.02 24-Dec-22
148 006771.BAP.05.T 18.58 31-Dec-22
148 006748.BAP.05.T 10.19 24-Dec-22
148 006762.BAP.05.T 6.03 27-Dec-22
047 006766.BAP.05.T 4.66 30-Dec-22
- 71.02
047 007636.BAP.08.T 24.63 31-Dec-22
047 007638.BAP.08.T 22.31 31-Dec-22
148 007626.BAP.08.T 16.67 31-Dec-22
047 007634.BAP.08.T 18.49 31-Dec-22
047 004593.BAP.09.T 34.08 31-Dec-22
148 004591.BAP.09.T 12.74 31-Dec-22
128.92
148 005923.BAP.10.T 7.72 14-Dec-22
047 005969.BAP.10.T 7.48 31-Dec-22
148 006965.BAP.15.T 21.32 30-Dec-22
047 006945.BAP.15.T 18.11 26-Dec-22
227 006964.BAP.15.T 2.91 30-Dec-22
047 006976.BAP.15.T 6.94 31-Dec-22
148 006977.BAP.15.T 1.84 31-Dec-22
66.32
266.26
KETERANGAN
RENCANA TANAM BIBIT CLONE JANUARI 2023
UPDATE SD.TANGGAL 5 Feb 23

UNIT BLOK CPT STAND LUAS


JENIS PROGRES
LAHAN LAPANGAN

3 TOMAN 1 15 a/3 20.78 LOA Selesai Tanam


3 TOMAN 1 15 b/1 22.35 LOA Selesai Tanam
3 TOMAN 1 21 c/1 6.05 LOA Selesai Tanam
W1 Total 49.18 - -
7 BAUNG UTARA 20 E1 21.46 LOA Selesai Tanam
8 TEBING INDAH 1 36 d 13.75 LOA Selesai Tanam
W2 Total 35.21 - -
10 KERUH 2 27 b 10.70 LOA Selesai Tanam
15 SUBAT 33 a2 18.12 LOA Selesai Tanam
15 SUBAT 29 d1 12.23 LOA Selesai Tanam
15 KERUH 1 22 a2 14.58 LOA Selesai Tanam
15 KERUH 1 16 f 2.75 LOA Selesai Tanam
15 KERUH 1 16 h 16.81 LOA Selesai Tanam
15 KERUH 1 16 g 12.29 LOA Selesai Tanam
15 KERUH 1 17 b3 6.82 LOA Selesai Tanam
W3 Total 94.30 - -
MHP Total 178.69 - -

NC W1 W2 W3
47 42.61 27.25 70
148 6.05 34.52 63.04 104
227 2.58 3
48.66 34.52 92.87 176
TANGGAL Luas Tanam Jumlah Bibit
NO SPK TANGGAL SPK
TANAM (ha) terkirim (btg)

5-Jan-23 032124.SPK.03.TNM-LOA.12.2022 23-Dec-22 20.59 40,860


9-Jan-23 032215.SPK.03.TNM-LOA.01.2023 3-Jan-23 22.02 43,860
22-Dec-22 032112.SPK.03.TNM-LOA.12.2022 21-Dec-22 6.05 10,860
- 48.66 95,580
12-Jan-23 025706.SPK.07.TNM-LOA.01.2023 12-Jan-23 20.57 31,440
13-Dec-22 025368.SPK.08.TNM-LOA.12.2022 13-Dec-22 13.95 29,220
- 34.52 60,660
5-Dec-22 027262.SPK.10.TNM-LOA.11.2022 24-Nov-22 10.45 23,280
9-Jan-23 027759.SPK.15.TNM-LOA.01.2023 8-Jan-23 17.87 36,180
15-Jan-23 027809.SPK.15.TNM-LOA.01.2023 13-Jan-23 12.40 24,300
2-Jan-23 027669.SPK.15.TNM-LOA.12.2022 29-Dec-22 14.20 29,640
3-Jan-23 027671.SPK.15.TNM-LOA.12.2022 29-Dec-22 2.58 4,980
3-Jan-23 027701.SPK.15.TNM-LOA.01.2023 1-Jan-23 16.80 33,420
3-Jan-23 027672.SPK.15.TNM-LOA.12.2022 29-Dec-22 11.90 24,720
3-Jan-23 027692.SPK.15.TNM-LOA.12.2022 31-Dec-22 6.67 12,360
- 92.87 165,600
- 176.05 321,840
Nomor Luas BAP Tanggal BAP
No BAP Tanam
Clone Tanam Tanam

047 032124.SPK.03.TNM-LOA.12.2022 20.59 25-Jan-23


047 005179.BAP.03.TNM-LOA.01.2023 22.02 25-Jan-23
148 005165.BAP.03.TNM-LOA.01.2023 6.05 14-Jan-23
- 48.66
148 001577.BAP.07.TNM-LOA.01.2023 20.57 31-Jan-23
148 007672.BAP.08.TNM-LOA.01.2023 13.95 15-Jan-23
34.52
047 006022.BAP.10.TNM-LOA.01.2023 10.45 19-Jan-23
148 007080.BAP.15.TNM-LOA.01.2023 17.87 31-Jan-23
148 007084.BAP.15.TNM-LOA.01.2023 12.40 31-Jan-23
148 007043.BAP.15.TNM-LOA.01.2023 14.20 25-Jan-23
227 007077.BAP.15.TNM-LOA.01.2023 2.58 31-Jan-23
047 007079.BAP.15.TNM-LOA.01.2023 16.80 31-Jan-23
148 007081.BAP.15.TNM-LOA.01.2023 11.90 31-Jan-23
148 007032.BAP.15.TNM-LOA.01.2023 6.67 21-Jan-23
92.87
176.05
KETERANGAN
RENCANA TANAM BIBIT CLONE FEB 2023
UPDATE SD.TANGGAL 05 Maret 2023

UNIT BLOK CPT STAND LUAS


JENIS PROGRES TANGGAL
LAHAN LAPANGAN TANAM

2 MERBAU 1 29 f 23.67 LOA Selesai Tana 28-Jan-23


2 MERBAU 1 29 A 14.12 LOA Selesai Tana 6-Feb-23
4 CABAN SELATAN 43 B 20.48 LOA Selesai Tana 27-Jan-23
4 SODONG TIMUR 22 C 5.17 LOA Selesai Tana 11-Feb-23
5 SODONG SELATAN 18 a/1 18.65 LOA Selesai Tana 23-Feb-23
W1 Total 82.09 - -
6 BAUNG SELATAN 31 B 24.26 LOA Selesai Tana 31-Dec-22
W2 Total 24.26 - -

15 SUBAT 33 a 12.78 LOA Selesai Tana 2-Feb-23


15 SUBAT 33 d 16.94 LOA Selesai Tana 3-Feb-23
15 SUBAT 29 a1 5.34 LOA Selesai Tana 12-Feb-23
15 SUBAT 24 b 14.88 LOA Selesai Tana 28-Jan-23
15 SUBAT 23 c 5.53 LOA Selesai Tana 4-Feb-23
15 SUBAT 15 b1 10.44 LOA Proses Tana 10-Feb-23
W3 Total 65.91 - -
MHP Total 172.26

NC W1 W2 W3
47 56.87 14.46
148 5.09 24.26 50.32
227 20.26
82.22 24.26 64.78 171
No
Luas Tanam Jumlah Bibit Nomor BAP Luas BAP Tanggal BAP
NO SPK TANGGAL SPK
(ha) terkirim (btg) Clone Tan Tanam Tanam
am
032617.SPK.02.TN 9-Feb-23 23.67 41,760 047 0035 23.64 28-Feb-23
032591.SPK.02.TN 4-Feb-23 14.12 25,620 047 0035 14.33 28-Feb-23
032497.SPK.04.TN 26-Jan-23 20.48 36,000 227 0042 20.26 28-Feb-23
032618.SPK.04.TN 9-Feb-23 5.17 9,000 148 0042 5.09 28-Feb-23
032736.SPK.05.TN 18-Feb-23 18.65 33,868 047 0069 18.90 28-Feb-23
- 82.09 146,248 - 82.22
025530.SPK.06.TN 31-Dec-22 24.26 48,600 148 0010 24.25 28-Feb-23
- 24.26 48,600 24.25

028017.SPK.15.TN 01-Feb-23 12.78 23,160 148 0071 12.45 28-Feb-23


028047.SPK.15.TN 02-Feb-23 16.94 30,300 148 0071 16.80 28-Feb-23
027977.SPK.15.TN 29-Jan-23 5.34 9,660 148 0071 5.17 28-Feb-23
027891.SPK.15.TN 19-Jan-23 14.88 30,720 047 0071 14.46 28-Feb-23
027963.SPK.15.TN 27-Jan-23 5.53 10,020 148 0071 5.48 28-Feb-23
028125.SPK.15.TN 09-Feb-23 10.44 18,900 148 0071 10.42 28-Feb-23
- 65.91 122,760 64.78
172.26 317,608.40 171.25
KETERANGAN
RENCANA TANAM BIBIT CLONE MAR 2023
UPDATE SD.TANGGAL 31 MAR 23

JENIS
UNIT BLOK CPT STAND LUAS
LAHAN PROGRES LAPANGAN

W1 Total 110.13 - -
8 TEBING INDAH II 03 d2 12.86 LOA BAP Tanam
8 TEBING INDAH II 22 b3 25.49 LOA BAP Tanam
9 DERAS 13 J1 17.86 LOA Selesai Tanam
9 DERAS 13 A1 24.08 LOA Proses Tanam

W2 Total 80.29 - -
W3 Total 102.64 - -
MHP Total 293.06
TANGGAL Luas Tanam Jumlah Bibit
NO SPK TANGGAL SPK
TANAM (ha) terkirim (btg)

- 8.63 -
8-Mar-23 026378.SPK.08.TNM-LOA.03.2023 12-Mar-23
16-Mar-23 026442.SPK.08.TNM-LOA.03.2023 19-Mar-23
17.86
20.00

- - -
- - -
8.63 -
Nomor Luas BAP Tanggal BAP
No BAP Tanam
Clone Tanam Tanam

- -
47 007847.BAP.08.T 12.76 3/31/2023
47 007849.BAP.08.T 26.30 3/31/2023

12.76
-
12.76
KETERANGAN
RENCANA TANAM BIBIT CLONE AGUSTUS 2023
UPDATE SD.TANGGAL 08 AGUSTUS 23

JENIS
UNIT BLOK CPT STAND WA LUAS
LAHAN

8 TERAS 06 a 1 22.14 LOA


8 TERAS 06 b 1 8.43 LOA
8 TEBING INDAH II 02 h 1 22.76 LOA
8 TEBING INDAH II 21 e 1 24.12 LOA
8 TEBING INDAH II 21 f 1 12.06 LOA
8 TEBING INDAH II 21 b 1 15.35 LOA
8 TEBING INDAH II 21 a 4 24.08 LOA
8 TEBING INDAH II 21 a 3 18.32 LOA
8 TEBING INDAH II 26 a 1 4.44 LOA
8 TEBING INDAH II 26 j 1 21.12 LOA
8 TEBING INDAH II 26 m 1 19.85 LOA
8 TEBING INDAH II 26 n 1 18.10 LOA
8 TEBING INDAH II 27 c 1 22.76 LOA
8 TEBING INDAH II 28 d 1 8.70 LOA
W2 Total 251.65 -

W3 Total - -
MHP Total 251.65
TANGGAL
PROGRES LAPANGAN TANAM
NO SPK TANGGAL SPK

Selesai tanam / tidak layak 9-Jul-23 029510.SPK.08.TNM-LOA.07.2023 16-Jul-2023


Selesai tanam / tidak layak 7-Jul-23 029511.SPK.08.TNM-LOA.07.2023 16-Jul-2023
selesai tanam 11-Aug-23 029704.SPK.08.TNM-LOA.08.2023 10-Aug-2023
ppts tanam 2-Aug-23 029616.SPK.08.TNM-LOA.08.2023 01-Aug-2023
selesai tanam 6-Aug-23 029648.SPK.08.TNM-LOA.08.2023 04-Aug-2023
ppts tanam 29-Jul-23 029578.SPK.08.TNM-LOA.07.2023 26-Jul-2023
Selesai tanam 28-Jul-23 029591.SPK.08.TNM-LOA.07.2023 28-Jul-2023
Selesai tanam 6-Aug-23 029663.SPK.08.TNM-LOA.08.2023 07-Aug-2023
ppts ripper
selesai ripper
selesai tanam 10-Aug-23 029680.SPK.08.TNM-LOA.08.2023 09-Aug-2023
ppts tanam 13-Aug-23 029746.SPK.08.TNM-LOA.08.2023 14-Aug-2023
Proses Tanam 14-Aug-23 029704.SPK.08.TNM-LOA.08.2023 10-Aug-2023
Proses Tanam 19-Aug-2023 029764.SPK.08.TNM-LOA.08.2023 19-Aug-2023
- -

- -
Luas Tanam Jumlah Bibit Nomor Luas BAP Tanggal BAP
No BAP Tanam
(ha) terkirim (btg) Clone Tanam Tanam

22.14 34,620 148


8.43 16,500 227
22.76 41,280 47
24.12 45,280 47
12.06 21,840 148
15.35 25,020 227
24.08 46,860 47
18.32 33,240 227

19.85 36,000 148


18.10 32,820 148
15.20 41,280 227
5.00 7,000
200.41 34,620.00 -

- - -
200.41 34,620 -
KETERANGAN

seedling
RENCANA TANAM BIBIT CLONE September 2023
UPDATE SD.TANGGAL 03 Oktober 23
STAN JENIS
UNIT BLOK CPT WA LUAS
D LAHAN
8 TEBING INDAH 2 26 a 1 4.44 LOA
8 TEBING INDAH 2 26 c 1 17.56 LOA
8 TEBING INDAH 2 26 b 1 20.8 LOA
8 TEBING INDAH 2 26 b 3 13.43 LOA
8 TEBING INDAH 2 26 j 1 21.12 LOA
8 TEBING INDAH 2 27 j 1 7.41 LOA
8 TEBING INDAH 2 27 h 1 8.19 LOA
8 TEBING INDAH 2 37 a 1 14.14 LOA
8 TEBING INDAH 2 37 b 1 21.46 LOA
8 TEBING INDAH 2 37 d 1 17.25 LOA
8 TEBING INDAH 2 37 m 1 21.55 LOA
8 TEBING INDAH 2 26 f 1 16.26 LOA
8 TEBING INDAH 2 37 d 3 6.66 LOA
8 TEBING INDAH 2 39 d 1 17.16 LOA
8 TEBING INDAH 2 39 l 1 27.91 LOA
8 IPUH 22 l 1 13.09 LOA
8 IPUH 23 d 1 17.99 LOA
W2 Total 266.42 -

W3 Total - -
MHP Total #REF!
TANGGAL TANGGAL
PROGRES LAPANGAN NO SPK
TANAM SPK
Selesai tanam 5-Sep-23 029921.SPK.08.TNM-LOA.09.2023 9/5/2023
layak 13-Sep-23 030019.SPK.08.TNM-LOA.09.202 9/12/2023
BAP tanam 6-Sep-23 029883.SPK.08.TNM-LOA.09.2023 9/2/2023
layak 3-Sep-23 029952.SPK.08.TNM-LOA.09.2023 9/9/2023
Selesai tanam 5-Sep-23 029884.SPK.08.TNM-LOA.09.2023 9/2/2023
BAP tanam 26-Aug-23 029846.SPK.08.TNM-LOA.08.2023 8/27/2023
BAP tanam 28-Aug-23 029851.SPK.08.TNM-LOA.08.2023 8/27/2023
Selesai tanam 15-Sep-23 030029.SPK.08.TNM-LOA.09.202 9/13/2023
Selesai tanam 18-Sep-23 030042.SPK.08.TNM-LOA.09.202 9/15/2023
Selesai tanam 18-Sep-23 030041.SPK.08.TNM-LOA.09.202 9/15/2023
Selesai tanam 18-Sep-23 030043.SPK.08.TNM-LOA.09.202 9/15/2023
proses tanam 20-Sep-23 030069.SPK.08.TNM-LOA.09.202 9/17/2023
Selesai tanam 20-Sep-23 030068.SPK.08.TNM-LOA.09.202 9/17/2023
proses drone 25-Sep-23
proses tanam 25-Sep-23 030134.SPK.08.TNM-LOA.09.202 9/24/2023
proses drone 28-Sep-23
tunggu drone 28-Sep-23
- -

- -
Luas Tanam Jumlah Bibit Nomor No BAP Luas BAP Tanggal
(ha) terkirim (btg) Clone Tanam Tanam BAP Tanam
4.44 8,040 227
17.56 31,860.0 148
20.80 37,740 227 008296.BAP.08 20.82 9/29/2023
13.43 24,360 227
21.12 38,340 047
7.41 13,440 148 008213.BAP.08.T 7.5 8/31/2023
8.19 18,360 047 008257.BAP.08 8.14 9/19/2023
14.14 15,000 148
21.46 31,500 047
10.00 25,500 047
21.55 15,360 227
10.00 6,000 148
6.66 6,000 047

12.00 48,840 047

188.76 320,340.00 36.46

- - -
#REF! #REF! #REF!

38,353.92
KETERANGAN

BAP

BAP
BAP
Luas SPK No SPK Tgl SPK User Name User Date User Time Wilayah Unit Blok
18.1 029746.SPK. 14/8/2023 RUDYH 45152 0.37149306 Wilayah II 08 TEBING INDA
22.74 029747.SPK. 14/8/2023 RUDYH 45152 0.38525463 Wilayah II 08 TEBING INDA
20.36 029748.SPK. 14/8/2023 RUDYH 45152 0.40487269 Wilayah II 08 TEBING INDA
15.73 029702.SPK. 10/8/2023 RIZZON 45148 0.58163194 Wilayah II 08 TEBING INDA
14.49 029703.SPK. 10/8/2023 RIZZON 45148 0.58465278 Wilayah II 08 TEBING INDA
22.76 029704.SPK. 10/8/2023 RIZZON 45148 0.58789352 Wilayah II 08 TEBING INDA
19.85 029680.SPK. 9/8/2023 RIZZON 45147 0.38947917 Wilayah II 08 TEBING INDA
18.32 029663.SPK. 7/8/2023 RUDYH 45145 0.41763889 Wilayah II 08 TEBING INDA
12.06 029648.SPK. 4/8/2023 RUDYH 45142 0.35482639 Wilayah II 08 TEBING INDA
19.25 029639.SPK. 3/8/2023 RUDYH 45141 0.41091435 Wilayah II 08 TEBING INDA
24.12 029616.SPK. 1/8/2023 RUDYH 45139 0.39350694 Wilayah II 08 TEBING INDA
24.08 029591.SPK. 28/7/2023 HENDRI 45135 0.37732639 Wilayah II 08 TEBING INDA
15.35 029578.SPK. 26/7/2023 RIZZON 45133 0.39743056 Wilayah II 08 TEBING INDA
10.96 029579.SPK. 26/7/2023 RIZZON 45133 0.40678241 Wilayah II 08 TEBING INDA
17.14 029563.SPK. 19/7/2023 RUDYH 45126 0.3384375 Wilayah II 08 TEBING INDA
26.73 029564.SPK. 19/7/2023 RUDYH 45126 0.34269676 Wilayah II 08 TEBING INDA
22.14 029510.SPK. 16/7/2023 RUDYH 45123 0.45758102 Wilayah II 08 TERAS
8.43 029511.SPK. 16/7/2023 RUDYH 45123 0.45982639 Wilayah II 08 TERAS
21.91 029461.SPK. 11/7/2023 RIZZON 45118 0.33679398 Wilayah II 08 TEBING INDA
5.81 029462.SPK. 11/7/2023 RIZZON 45118 0.34501157 Wilayah II 08 TEBING INDA
18.52 029463.SPK. 11/7/2023 RIZZON 45118 0.34902778 Wilayah II 08 TEBING INDA
8.43 029441.SPK. 8/7/2023 RIZZON 45115 0.50849537 Wilayah II 08 TEBING INDA
16.04 029305.SPK. 16/6/2023 RIZZON 45093 0.6244213 Wilayah II 08 TEBING INDA
18.39 029306.SPK. 16/6/2023 RIZZON 45093 0.62584491 Wilayah II 08 TEBING INDA
21.05 029307.SPK. 16/6/2023 RIZZON 45093 0.62905093 Wilayah II 08 IPUH
0.71 029287.SPK. 14/6/2023 RIZZON 45091 0.3665162 Wilayah II 08 TERAS
21.81 029255.SPK. 10/6/2023 RUDYH 45087 0.58355324 Wilayah II 08 TERAS
17.65 029153.SPK. 27/5/2023 RUDYH 45073 0.49244213 Wilayah II 08 TERAS
7.57 029156.SPK. 27/5/2023 RUDYH 45073 0.52864583 Wilayah II 08 TERAS
19.81 029112.SPK. 26/5/2023 RUDYH 45072 0.31761574 Wilayah II 08 TEBING INDA
18.77 029007.SPK. 12/5/2023 RUDYH 45058 0.34824074 Wilayah II 08 IPUH
22.9 028979.SPK. 10/5/2023 YOAN 45056 0.39689815 Wilayah II 08 TEBING INDA
9.52 028936.SPK. 6/5/2023 HENDRI 45052 0.38990741 Wilayah II 08 TERAS
11.58 028877.SPK. 29/4/2023 YOAN 45045 0.32866898 Wilayah II 08 TERAS
3.71 028863.SPK. 28/4/2023 YOAN 45044 0.40353009 Wilayah II 08 TEBING INDA
21.35 028847.SPK. 18/4/2023 HENDRI 45034 0.56618056 Wilayah II 08 TEBING INDA
4.64 028848.SPK. 18/4/2023 HENDRI 45034 0.56790509 Wilayah II 08 TEBING INDA
9.55 028849.SPK. 18/4/2023 HENDRI 45034 0.57269676 Wilayah II 08 TEBING INDA
16.45 028833.SPK. 17/4/2023 HENDRI 45033 0.38047454 Wilayah II 08 TERAS
16.72 028834.SPK. 17/4/2023 HENDRI 45033 0.39081019 Wilayah II 08 TERAS
6.13 028835.SPK. 17/4/2023 HENDRI 45033 0.39302083 Wilayah II 08 TERAS
2.21 028836.SPK. 17/4/2023 HENDRI 45033 0.39457176 Wilayah II 08 TERAS
1.06 028829.SPK. 16/4/2023 HENDRI 45032 0.57496528 Wilayah II 08 TEBING INDA
7.04 028830.SPK. 16/4/2023 HENDRI 45032 0.57755787 Wilayah II 08 TEBING INDA
14.56 028831.SPK. 16/4/2023 HENDRI 45032 0.57987269 Wilayah II 08 TEBING INDA
28.09 026715.SPK. 14/4/2023 RUDYH 45030 0.37809028 Wilayah II 08 TERAS
16.62 026699.SPK. 11/4/2023 RUDYH 45027 0.58342593 Wilayah II 08 TEBING INDA
17.95 026592.SPK. 3/4/2023 HENDRI 45019 0.32376157 Wilayah II 08 TERAS
16.77 026586.SPK. 2/4/2023 HENDRI 45018 0.42001157 Wilayah II 08 IPUH
22.74 026522.SPK. 27/3/2023 HENDRI 45012 0.37665509 Wilayah II 08 IPUH
25.69 026442.SPK. 19/3/2023 YOAN 45004 0.4668287 Wilayah II 08 TEBING INDA
22.15 026426.SPK. 18/3/2023 YOAN 45003 0.33944444 Wilayah II 08 TEBING INDA
14.53 026374.SPK. 12/3/2023 HENDRI 44997 0.44920139 Wilayah II 08 TEBING INDA
12.85 026378.SPK. 12/3/2023 HENDRI 44997 0.4797338 Wilayah II 08 TEBING INDA
19.38 026354.SPK. 10/3/2023 HENDRI 44995 0.27391204 Wilayah II 08 IPUH
0.73 026340.SPK. 9/3/2023 HENDRI 44994 0.2996875 Wilayah II 08 TEBING INDA
10.11 026341.SPK. 9/3/2023 HENDRI 44994 0.30498843 Wilayah II 08 TEBING INDA
9.94 026335.SPK. 8/3/2023 HENDRI 44993 0.45327546 Wilayah II 08 IPUH
23.44 026190.SPK. 21/2/2023 RUDYH 44978 0.40121528 Wilayah II 08 IPUH
2.53 026162.SPK. 18/2/2023 RUDYH 44975 0.40950231 Wilayah II 08 IPUH
9.66 026122.SPK. 16/2/2023 YOAN 44973 0.39988426 Wilayah II 08 IPUH
12.33 026080.SPK. 12/2/2023 HENDRI 44969 0.39503472 Wilayah II 08 IPUH
18.09 026042.SPK. 9/2/2023 HENDRI 44966 0.38761574 Wilayah II 08 IPUH
29.49 026018.SPK. 6/2/2023 HENDRI 44963 0.5984838 Wilayah II 08 IPUH
20.46 026019.SPK. 6/2/2023 HENDRI 44963 0.59972222 Wilayah II 08 IPUH
21.38 025962.SPK. 4/2/2023 HENDRI 44961 0.35275463 Wilayah II 08 IPUH
6.04 025810.SPK. 20/1/2023 HENDRI 44946 0.39793981 Wilayah II 08 TEBING INDA
22.17 025811.SPK. 20/1/2023 HENDRI 44946 0.40086806 Wilayah II 08 TEBING INDA
13.1 025754.SPK. 14/1/2023 YOAN 44940 0.41143519 Wilayah II 08 IPUH
16.2 025755.SPK. 14/1/2023 YOAN 44940 0.41568287 Wilayah II 08 IPUH
16.84 025679.SPK. 8/1/2023 HENDRI 44934 0.44997685 Wilayah II 08 IPUH
2.64 025682.SPK. 8/1/2023 HENDRI 44934 0.46006944 Wilayah II 08 TEBING INDA
4.8 025647.SPK. 6/1/2023 HENDRI 44932 0.35350694 Wilayah II 08 IPUH
8.52 025643.SPK. 5/1/2023 HENDRI 44931 0.59158565 Wilayah II 08 IPUH
25.74 025620.SPK. 3/1/2023 HENDRI 44929 0.39981481 Wilayah II 08 TEBING INDA
26.4 025611.SPK. 2/1/2023 HENDRI 44928 0.58172454 Wilayah II 08 IPUH
Cpt Stand Work Area Luas Peta GIKontraktor Kode Pelaks Pelaksana SuperintendSupervisor
26 n 1 18.55 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPAGUS IRFAN
27 c 1 22.78 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPSUGENG
27 i 1 20.32 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPABDUL KHOLI
22 f 1 15.92 EKSANFAT JA13101 ISTIROHA JAYARI, S.TPHOKY SANDR
22 g 1 14.68 BENAKAT ME13102 LESTARI JAYARI, S.TPSUGENG
02 h 1 22.84 ANDESTA MI13096 MANTAP JAYARI, S.TPTAUFIK HID
26 m 1 20.17 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPTAUFIK HID
21 a 3 19.06 EKSANFAT JA13101 ISTIROHA JAYARI, S.TPSUGENG
21 f 1 12.05 EKSANFAT JA13101 ISTIROHA JAYARI, S.TPHOKY SANDR
21 g 1 19.85 BENAKAT ME13102 LESTARI JAYARI, S.TPRISWAN
21 e 1 24.58 BENAKAT ME13102 LESTARI JAYARI, S.TPTAUFIK HID
21 a 4 23.31 PUTRA SUBA13098 RHAMA MAHJAYARI, S.TPAGUS IRFAN
21 b 1 15.46 PUTRA BENM13097 ICON TEWA JAYARI, S.TPHOKY SANDR
21 h 1 10.9 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPTAUFIK HID
21 b 3 17.49 BENAKAT ME13102 LESTARI JAYARI, S.TPTAUFIK HID
21 d 2 26.91 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPHOKY SANDR
06 a 1 22.09 EKSANFAT JA13101 ISTIROHA JAYARI, S.TPAGUS IRFAN
06 d 6 8.81 BENAKAT ME13102 LESTARI JAYARI, S.TPRISWAN
21 c 1 22.32 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPHOKY SANDR
09 c1 1 5.58 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPTAUFIK HID
22 a 1 17.75 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPSUGENG
35 d 1 8.22 BENAKAT ME13102 LESTARI JAYARI, S.TPTAUFIK HID
30 h 1 15.02 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPSUGENG
30 a 1 16.83 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPTAUFIK HID
25 k 1 20.72 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPPRASETYA A
08 a 8 0.78 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPRISWAN
07 b 6 21.98 BENAKAT ME13102 LESTARI JAYARI, S.TPRISWAN
08 a 4 17.3 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPPRASETYA A
08 a 5 7.37 BENAKAT ME13102 LESTARI JAYARI, S.TPTAUFIK HID
38 a 3 19.07 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPTAUFIK HID
22 c 2 18.44 BERDIRI BE 13085 KHIMAS HAKJAYARI, S.TPAHMAD RIFA'
08 b 2 22.94 BENAKAT ME13102 LESTARI JAYARI, S.TPDWI FRANATA
09 b 3 9.37 BENAKAT ME13102 LESTARI JAYARI, S.TPRISWAN
07 a 4 11.95 BENAKAT ME13102 LESTARI JAYARI, S.TPRISWAN
20 b 1 3.91 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPPRASETYA A
38 j 1 21.85 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPI PUTU YULI
38 n 1 4.48 PUTRA BENM13097 ICON TEWA JAYARI, S.TPAHMAD RIFA'
38 c 1 9.42 PUTRA BENM13097 ICON TEWA JAYARI, S.TPAHMAD RIFA'
03 a 2 16.15 ANDESTA MI13096 MANTAP JAYARI, S.TPRISWAN
05 a 1 16.49 BENAKAT ME13102 LESTARI JAYARI, S.TPRISWAN
06 c 1 6.11 BENAKAT ME13102 LESTARI JAYARI, S.TPRISWAN
05 b 2 2.14 BENAKAT ME13102 LESTARI JAYARI, S.TPRISWAN
09 b 1 1.06 BENAKAT ME13102 LESTARI JAYARI, S.TPTAUFIK HID
09 j 1 6.77 BENAKAT ME13102 LESTARI JAYARI, S.TPTAUFIK HID
09 c 1 14.67 BENAKAT ME13102 LESTARI JAYARI, S.TPDWI FRANATA
04 a 1 28.33 BENAKAT ME13102 LESTARI JAYARI, S.TPRISWAN
17 b 2 15.93 BENAKAT ME13102 LESTARI JAYARI, S.TPTAUFIK HID
03 b 1 18.12 BENAKAT ME13102 LESTARI JAYARI, S.TPPRASETYA A
25 a 1 16.15 BENAKAT ME13102 LESTARI JAYARI, S.TPAGUS IRFAN
25 i 1 23.11 BENAKAT ME13102 LESTARI JAYARI, S.TPAHMAD RIFA'
22 b 3 26.3 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPDWI FRANATA
11 b 1 21.84 BERDIRI BE 13085 KHIMAS HAKJAYARI, S.TPTAUFIK HID
28 e 2 14.42 BENAKAT ME13102 LESTARI JAYARI, S.TPAGUS IRFAN
03 d 2 12.76 PUTRA BENM13097 ICON TEWA JAYARI, S.TPDWI FRANATA
25 b 1 19.12 BENAKAT ME13102 LESTARI JAYARI, S.TPAGUS IRFAN
11 m 1 0.65 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPTAUFIK HID
11 n 1 9.89 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPTAUFIK HID
15 g 1 9.8 BENAKAT ME13102 LESTARI JAYARI, S.TPAHMAD RIFA'
15 f 1 22.62 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPDWI FRANATA
15 d 3 2.58 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPPRASETYA AD
25 l 1 10.01 BENAKAT ME13102 LESTARI JAYARI, S.TPAGUS IRFAN
31 a 2 12.26 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPAHMAD RIFA'
31 d 1 18.1 BENAKAT ME13102 LESTARI JAYARI, S.TPPRASETYA A
31 b 4 28.79 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPAGUS IRFAN
31 c 1 20.13 BENAKAT ME13102 LESTARI JAYARI, S.TPI PUTU YULI
31 e 1 20.99 PUTRA BENM13097 ICON TEWA JAYARI, S.TPPRASETYA A
12 l 1 6.09 BENAKAT ME13102 LESTARI JAYARI, S.TPTAUFIK HID
12 a 1 21.94 BENAKAT ME13102 LESTARI JAYARI, S.TPRISWAN
30 a 8 13.23 BENAKAT ME13102 LESTARI JAYARI, S.TPAHMAD RIFA'
26 a 2 16.25 BENAKAT ME13102 LESTARI JAYARI, S.TPAHMAD RIFA'
26 i 1 16.57 BENAKAT ME13102 LESTARI JAYARI, S.TPPRASETYA A
11 d 1 2.69 BENAKAT ME13102 LESTARI JAYARI, S.TPTAUFIK HID
25 a3 1 4.48 BENAKAT ME13102 LESTARI JAYARI, S.TPRISWAN
09 b 2 6.37 BENAKAT ME13102 LESTARI JAYARI, S.TPPRASETYA A
36 a 1 26.05 SATRIA TANI13095 SUPRIYONO JAYARI, S.TPTAUFIK HID
30 d 1 26.32 PUTRA BENM13097 ICON TEWA JAYARI, S.TPAHMAD RIFA'
Tahun Kerja Tahun Tana Jenis Lahan Species Kode Keg AcKegiatan ActHarga Satua Periode s/d
20232024 2023 Eucalyptus 20231103 Penanaman - 1490000 45152 48836
20232024 2023 Eucalyptus 20231103 Penanaman - 1490000 45152 45183
20232024 2023 Eucalyptus 20231103 Penanaman - 1490000 45152 45183
20232024 2023 Eucalyptus 20231103 Penanaman - 1490000 45148 45178
20232024 2023 Eucalyptus 20231103 Penanaman - 1490000 45148 45168
20232024 2023 Eucalyptus 20231103 Penanaman - 1490000 45148 45163
20232024 2023 Clone 47 20231103 Penanaman - 1490000 45147 45163
20232024 2023 Eucalyptus 20231103 Penanaman - 1490000 45145 45176
20232024 2023 Eucalyptus 20231103 Penanaman - 1490000 45142 45173
20232024 2023 Eucalyptus 20231103 Penanaman - 1490000 45141 45172
20232024 2023 Eucalyptus 20231103 Penanaman - 1490000 45139 45170
20232024 2023 Eucalyptus 20231103 Penanaman - 1490000 45135 45166
20232024 2023 Clone 47 20231103 Penanaman - 1490000 45133 45137
20232024 2023 LOA Clone 47 20231103 Penanaman - 1490000 45133 45137
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1490000 45126 45157
20232024 2023 Eucalyptus 20231103 Penanaman - 1490000 45126 45157
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1490000 45123 45154
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1490000 45123 45154
20232024 2023 LOA Clone 47 20231103 Penanaman - 1490000 45118 45149
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1490000 45118 45149
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1490000 45118 45149
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1490000 45115 45122
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1490000 45093 45102
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1490000 45093 45102
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1490000 45093 45102
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1490000 45091 45102
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1490000 45087 45117
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1185000 45073 45104
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1185000 45073 45104
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1185000 45072 45103
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1185000 45058 45092
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1185000 45056 45087
20232024 2023 LOA Clone 148 20231103 Penanaman - 1185000 45052 45083
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1185000 45045 45075
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1185000 45044 45074
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1185000 45034 45064
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1185000 45034 45064
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1185000 45034 45064
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1185000 45033 45063
20232024 2023 LOA Clone 148 20231103 Penanaman - 1185000 45032 45062
20232024 2023 LOA Clone 227 20231103 Penanaman - 1185000 45033 45063
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1185000 45033 45063
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1185000 45032 45062
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1185000 45032 45062
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1185000 45032 45062
20232024 2023 LOA Clone 148 20231103 Penanaman - 1185000 45030 45060
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1185000 45027 45057
20232024 2023 LOA Clone 148 20231103 Penanaman - 1185000 45019 45049
20232024 2023 LOA Eucalyptus 20231103 Penanaman - 1185000 45018 45050
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 45012 45043
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 45004 45035
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 45003 45034
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44997 45028
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44997 45028
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44995 45026
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44994 45025
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44994 45025
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44993 45024
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44978 45006
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44975 45003
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44973 45001
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44969 44997
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44966 44994
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44963 44991
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44963 44991
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44961 44624
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44946 44977
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44946 44977
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44940 44971
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44940 44971
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44934 44965
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44934 44965
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44932 44963
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44931 44962
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44929 44960
20222023 2022 LOA Eucalyptus 20231103 Penanaman - 1092371 44928 44959
PPh % PPn % Progres HariProgres HariTanggal Luas Harian Bibit TSP Tablet Pupuk
2 11 1 0 18000 2110.46 0
2 11 1 0 0 2651.48 0
2 11 1 0 4200 2373.98 0
2 0 1 0 15470 1834.12 0
2 0 1 0 6300 0 0
2 0 1 0 18000 2653.82 0
2 11 1 0 26520 2314.51 0
2 0 1 0 33240 2136.11 0
2 0 1 0 21840 1406.2 0
2 0 1 0 34930 2244.55 0
2 0 1 0 28320 2812.39 0
0 0 1 0 46860 2807.73 0
2 0 1 0 25020 1789.81 0
2 11 Selesai 45136 10.96 19860 1277.94 0
2 0 Selesai 45128 17.14 33660 2068.52 0
2 11 1 0 45010 3245.02 0
2 0 Selesai 45128 22.14 34620 2581.52 0
2 0 Selesai 45126 8.43 16500 1075.94 0
2 11 Selesai 45126 21.91 42180 2692.21 0
2 11 Selesai 45123 5.81 11410 677.45 0
2 11 Selesai 45124 18.52 31710 2159.43 0
2 0 Selesai 45118 8.43 16450 1056.39 0
2 0 Selesai 45096 16.04 29120 2014.26 0
2 11 Selesai 45098 18.39 39200 2350.27 0
2 11 Selesai 45118 21.05 45780 2592.43 0
2 11 Selesai Selesai 45102 0.71 1260 82.79 0
2 0 Selesai 45097 21.81 43080 2752.93 0
2 11 Selesai Selesai 45091 17.65 34720 2197.99 0
2 0 Selesai Selesai 45094 7.57 7980 882.66 0
2 11 Selesai Selesai 45084 19.81 39060 2507.85 0
2 0 Selesai Selesai 45066 18.77 36120 2188.58 0
2 0 Selesai Selesai 45064 22.9 41860 2880.14 0
2 0 Selesai Selesai 45056 9.52 18780 1110.03 0
2 0 Selesai Selesai 45083 11.58 22800 1478.23 0
2 11 Selesai Selesai 45091 3.71 6720 432.59 0
2 11 Selesai 45038 21.35 42000 2707.41 0
2 0 Selesai 45050 4.64 9520 573.66 0
2 0 Selesai 45036 9.55 17710 1178.53 0
2 0 Selesai 45085 16.45 36480 1918.07 0
2 0 Selesai Selesai 45057 16.72 32820 2092.55 0
2 0 Selesai Selesai 45082 6.13 11100 779.76 0
2 0 Selesai 45079 2.21 3960 257.69 0
2 11 Selesai 45047 1.06 1890 123.6 0
2 0 Selesai 45035 7.04 14700 967.86 0
2 11 Selesai 45053 14.56 21700 1857.7 0
2 0 Selesai Selesai 45058 28.09 39120 3519.29 0
2 0 Selesai 45032 16.62 32690 2075.47 0
2 0 Selesai 45055 17.95 38280 2092.97 0
2 0 Selesai Selesai 45060 16.77 32970 1955.38 0
2 0 Selesai 45024 22.74 41230 2651.48 0
2 11 Selesai 45006 25.69 49980 2995.45 0
2 0 Selesai 45010 22.15 43610 2582.69 0
2 0 Selesai 45004 14.53 27860 1694.2 0
2 0 Selesai 45001 12.85 24900 0 1498.31
2 0 Selesai 45006 19.38 37940 2259.71 0
2 11 Selesai 44994 0.73 1260 0 85.12
2 11 Selesai 44999 10.11 18340 0 1178.83
2 0 Selesai 44999 9.94 17990 0 1159
2 11 Selesai 44980 23.44 46060 0 2733.1
2 11 Selesai 44976 2.53 4550 0 295
2 0 Selesai 44977 9.66 18970 0 1126.36
2 11 Selesai 44974 12.33 23660 0 1437.68
2 0 Selesai 44974 18.09 35140 0 2109.29
2 11 Selesai 44977 29.49 57680 0 3438.53
2 0 Selesai 44973 20.46 39900 0 2385.64
2 0 Selesai 44968 21.38 45780 0 2492.91
2 0 Selesai 44948 6.04 14420 0 704.26
2 0 Selesai 44962 22.17 43750 0 2585.02
2 0 Selesai 44960 13.1 23730 0 1527.46
2 0 Selesai 44943 16.2 31850 0 1888.92
2 0 Selesai 44942 16.84 33320 0 1963.54
2 0 Selesai 44937 2.64 4760 0 307.82
2 0 Selesai 44934 4.8 8680 0 559.68
2 0 Selesai 44935 8.52 15470 0 993.43
2 11 Selesai 44939 25.74 49350 0 2750
2 0 Selesai 44946 26.4 52150 0 3078.24
Gliposat MetilmetsufAqushop Kixor KAO Touchdown Bacterisida Bacterisida Umur SPK
0 0 72.4 0 0 0 0 0 1
0 0 90.96 0 0 0 0 0 1
0 0 81.44 0 0 0 0 0 1
0 0 62.92 0 0 0 0 0 5
0 0 0 0 0 0 0 0 5
0 0 91.04 0 0 0 0 0 5
0 0 79.4 0 0 0 0 0 6
0 0 73.28 0 0 0 0 0 8
0 0 48.24 0 0 0 0 0 11
0 0 77 0 0 0 0 0 12
0 0 96.48 0 0 0 0 0 14
0 0 96.32 0 0 0 0 0 18
0 0 61.4 0 0 0 0 0 20
0 0 43.84 0 0 0 0 0 20
0 0 68.56 0 0 0 0 0 27
0 0 106.92 0 0 0 0 0 27
0 0 88.56 0 0 0 0 0 30
0 0 33.72 0 0 0 0 0 30
0 0 87.64 0 0 0 0 0 35
0 0 23.24 0 0 0 0 0 35
0 0 74.08 0 0 0 0 0 35
0 0 33.72 0 0 0 0 0 38
0 0 64.16 0 0 0 0 0 60
0 0 73.56 0 0 0 0 0 60
0 0 84.2 0 0 0 0 0 60
0 0 2.84 0 0 0 0 0 62
0 0 87.24 0 0 0 0 0 66
0 0 0 0 0 0 0 0 80
0 0 0 0 0 0 0 0 80
0 0 0 0 0 0 0 0 81
0 0 0 0 0 0 0 0 95
0 0 0 0 0 0 0 0 97
0 0 0 0 0 0 0 0 101
0 0 0 0 0 0 0 0 108
0 0 0 0 0 0 0 0 109
0 0 0 0 0 0 0 0 119
0 0 0 0 0 0 0 0 119
0 0 0 0 0 0 0 0 119
0 0 0 0 0 0 0 0 120
0 0 0 0 0 0 0 0 120
0 0 0 0 0 0 0 0 120
0 0 0 0 0 0 0 0 120
0 0 0 0 0 0 0 0 121
0 0 0 0 0 0 0 0 121
0 0 0 0 0 0 0 0 121
0 0 0 0 0 0 0 0 123
0 0 0 0 0 0 0 0 126
0 0 0 0 0 0 0 0 134
0 0 0 0 0 0 0 0 135
0 0 0 0 0 0 0 0 141
0 0 0 0 0 0 0 0 149
0 0 0 0 0 0 0 0 150
0 0 0 0 0 0 0 0 156
0 0 0 0 0 0 0 0 156
0 0 0 0 0 0 0 0 158
0 0 0 0 0 0 0 0 159
0 0 0 0 0 0 0 0 159
0 0 0 0 0 0 0 0 160
0 0 0 0 0 0 0 0 175
0 0 0 0 0 0 0 0 178
0 0 0 0 0 0 0 0 180
0 0 0 0 0 0 0 0 184
0 0 0 0 0 0 0 0 187
0 0 0 0 0 0 0 0 190
0 0 0 0 0 0 0 0 190
0 0 0 0 0 0 0 0 192
0 0 0 0 0 0 0 0 207
0 0 0 0 0 0 0 0 207
0 0 0 0 0 0 0 0 213
0 0 0 0 0 0 0 0 213
0 0 0 0 0 0 0 0 219
0 0 0 0 0 0 0 0 219
0 0 0 0 0 0 0 0 221
0 0 0 0 0 0 0 0 222
0 0 0 0 0 0 0 0 224
0 0 0 0 0 0 0 0 225
Tgl Rekom QHasil QC Nilai QC Luas BAP No BAP Tgl BAP Harga Satua Total BAP Jour Code
367 0 0 367 0 0
367 0 0 367 0 0
367 0 0 367 0 0
367 0 0 367 0 0
367 0 0 367 0 0
367 0 0 367 0 0
367 0 0 367 0 0
367 0 0 367 0 0
367 0 0 367 0 0
367 0 0 367 0 0
367 0 0 367 0 0
367 0 0 367 0 0
367 0 0 367 0 0
367 0 10.9 008131.BAP. 45138 1620000 19145748 BA08
367 0 17.49 008130.BAP. 45138 1379921 22029113 BA08
367 0 0 367 0 0
367 0 0 367 0 0
367 0 0 367 0 0
367 0 22.32 008128.BAP. 45138 1620000 38015380 BA08
367 0 0 367 0 0
367 0 0 367 0 0
367 0 8.22 008129.BAP. 45138 1620000 12966315.1 BA08
367 0 15.02 008077.BAP. 45107 1620000 23792663 BA08
367 0 16.83 008079.BAP. 45107 1620000 28149974 BA08
367 0 20.72 008134.BAP. 45138 1490000 30985173 BA08
367 0 0.78 008067.BAP. 45107 1620000 1377324 BA08
367 0 21.98 008073.BAP. 45107 1620000 33868950 BA08
367 0 17.3 008081.BAP. 45107 1092371 19126644 BA08
367 0 7.37 008064.BAP. 45107 1092371 7703807.03 BA08
367 0 19.07 008049.BAP. 45099 1270000 24455130 BA08
367 0 18.44 007998.BAP. 45077 1185000 16592378.4 BA08
367 0 22.94 007971.BAP. 45077 1270000 28091982 BA08
367 0 9.37 007964.BAP. 45076 1270000 11467543 BA08
367 0 11.95 008050.BAP. 45101 1185000 13381784 BA08
367 0 3.91 008072.BAP. 45107 1185000 4966474.32 BA08
367 0 21.85 007932.BAP. 45046 1185000 27229432 BA08
367 0 4.48 007944.BAP. 45059 1185000 5122992 BA08
367 0 9.42 007931.BAP. 45046 1270000 10679712 BA08
367 0 16.15 008078.BAP. 45107 1092371 17171414 BA08
367 0 16.49 007976.BAP. 45077 1185000 19037821 BA08
367 0 6.11 008016.BAP. 45089 1270000 7414769.56 BA08
367 0 2.14 008021.BAP. 45089 1092371 2290920.46 BA08
367 0 1.06 007996.BAP. 45077 1270000 847770.98 BA08
367 0 6.77 007933.BAP. 45046 1270000 7881689.11
367 0 14.67 007995.BAP. 45077 1270000 18151512 BA08
367 0 28.33 007977.BAP. 45077 1270000 33118580 BA08
367 0 15.93 007934.BAP. 45046 1270000 19289285 BA08
367 0 18.12 007997.BAP. 45077 1092371 18835199 BA08
367 0 16.15 007957.BAP. 45070 1270000 19293679 BA08
367 0 23.11 007894.BAP. 45043 1176750 25983613 BA08
367 0 26.3 007849.BAP. 45016 1092371 30442107 BA08
367 0 21.84 007904.BAP. 45046 1176750 23878180 BA08
367 0 14.42 007854.BAP. 45016 1176750 16396719 BA08
367 0 12.76 007847.BAP. 45016 1176750 14715023.4 BA08
367 0 19.12 007850.BAP. 45016 1176750 20767502 BA08
367 0 0.65 007846.BAP. 45016 1176750 833727.38 BA08
367 0 9.89 007848.BAP. 45016 1092371 11775869 BA08
367 0 9.8 007839.BAP. 45013 1176750 11301507 BA08
367 0 22.62 007785.BAP. 44985 1176750 29013713 BA08
367 0 2.58 007782.BAP. 44985 1092371 3071965.73 BA08
367 0 10.01 007788.BAP. 44985 1176750 11543682 BA08
367 0 12.26 007780.BAP. 44985 1176750 15508977 BA08
367 0 18.1 007787.BAP. 44985 1176750 20553704 BA08
367 0 28.79 007781.BAP. 44985 1176750 36419530 BA08
367 0 20.13 007783.BAP. 44985 1176750 22858898 BA08
367 0 20.99 007784.BAP. 44985 1176750 23835483 BA08
367 0 6.09 007710.BAP. 44957 1176750 7023079.35 BA08
367 0 21.94 007743.BAP. 44974 1176750 25301537.1 BA08
367 0 13.23 007779.BAP. 44985 1176750 15023508 BA08
367 0 16.25 007702.BAP. 44957 1176750 18739744 BA08
367 0 16.57 007703.BAP. 44957 1176750 19108773 BA08
367 0 2.69 007685.BAP. 44951 1176750 3102148.35 BA08
367 0 4.48 007765.BAP. 44982 1176750 4754479.54 BA08
367 0 6.37 007691.BAP. 44957 1092371 6819235.2 BA08
367 0 26.05 007677.BAP. 44947 1176750 33413228 BA08
367 0 26.32 007706.BAP. 44957 1176750 29888037.9 BA08
Jour No Potongan KePotongan TidAdendum Payment BAkode Kelom Nama Kelo Nilai MHBM User BAP
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
23070158 93093 0 0 100 0 RUDYH
23070160 1656131 0 0 100 0 RUDYH
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
23070140 1281904 0 0 100 0 RUDYH
0 0 0 0 0
0 0 0 0 0
23070157 85466 0 0 100 0 RUDYH
23060109 2504269 0 0 100 0 RUDYH
23060111 1438936 0 0 100 0 HENDRI
23070156 2446036 0 0 100 0 RUDYH
23060091 0 0 0 100 0 RUDYH
23060093 1047447 0 0 100 0 RUDYH
23060113 1350639 0 0 100 0 HENDRI
23060092 189747 0 0 100 0 RUDYH
23060056 1469942 0 0 100 1.5 RUDYH
23050090 4920402 0 0 100 0 HENDRI
23050067 468512 0 0 100 0 YOAN
23050053 198326 0 0 100 0 YOAN
23060051 505868 0 0 100 0 RUDYH
23060104 76952 0 0 100 0 RUDYH
23040103 562546 0 0 100 1.5 HENDRI
23050008 0 0 0 100 1.5 YOAN
23040102 896341 0 0 100 1.5 HENDRI
23060110 119941 0 0 100 0 RUDYH
23050078 114302 0 0 100 0 RUDYH
23060023 193609 0 0 100 0 RUDYH
23060018 0 0 0 100 0 RUDYH
23050085 481128 0 0 100 0 HENDRI
555360 0 0 100 0 HENDRI
23050087 108949 0 0 100 0 HENDRI
23050077 2184631 0 0 100 0 RUDYH
23040105 548156 0 0 100 0 HENDRI
23050091 574172 0 0 100 0 HENDRI
23050045 823072 0 0 100 0 YOAN
23040055 680801 0 0 100 0 RUDYH
23030138 800819 0 0 100 0 HENDRI
23040065 1334730 0 0 100 0 YOAN
23030161 237389 0 0 100 0 RUDYH
23030141 0 0 0 100 0 HENDRI
23030139 1308132 0 0 100 0 HENDRI
23030142 0 0 0 100 0 HENDRI
23030140 0 0 0 100 0 HENDRI
23030119 0 0 0 100 0 HENDRI
23020098 0 0 0 100 0 HENDRI
23020099 0 0 0 100 0 HENDRI
23020094 0 0 0 100 0 HENDRI
23020101 0 0 0 100 1.5 HENDRI
23020097 0 0 0 100 1.5 HENDRI
23020103 0 0 0 100 1.5 HENDRI
23020100 0 0 0 100 1.5 HENDRI
23020095 0 0 0 100 1.5 HENDRI
23010105 0 0 0 100 0 RUDYH
23020041 0 0 0 100 0 YOAN
23020102 0 0 0 100 1.5 HENDRI
23010090 0 0 0 100 0 YOAN
23010091 0 0 0 100 0 YOAN
23010022 0 0 0 100 0 HENDRI
23020065 420330 0 0 100 0 YOAN
23010055 0 0 0 100 0 YOAN
23010028 0 0 0 100 0 HENDRI
23010110 0 0 0 100 1.5 HENDRI
Date BAP Tanggal Vali Tgl Approve Status Appr Seedlot Provenance
367 367 367
367 367 367
367 367 367 210903002 11
367 367 367 210903002 11
367 367 367 210903002 11
367 367 367
367 367 367
367 45147 367
367 45147 367
367 45147 367 210903002 11
367 367 367
367 45144 367
367 45139 367
45138 45143 367
45138 45138 367 210903002 11
367 45138 367 210903002 11
367 45130 367
367 45130 367
45138 45145 367
367 45138 367 210903002 11
367 45138 367 210903002 11
45138 45130 367 200903002 11
45107 45095 367 201301007 10
45107 45095 367 201301007 10
45138 45095 367 200903005 11
45107 45091 367 200903005 11
45107 45087 367
45107 45115 367 201301007 10
45107 45095 367 201301007 10
45099 45074 367 201301007 10
45077 45060 367 201301007 10
45077 45060 367 201301007 10
45076 45054 367
45101 45046 367
45107 45046 367 201301007 10
45046 45042 367 201301007 10
45059 45042 367 201301007 10
45046 45042 367 201301007 10
45107 45033 367
45077 45033 367
45089 45033 367
45089 45033 367
45077 45033 367 201301007 10
45046 45033 367 201301007 10
45077 45033 367 201301007 10
45077 45031 367
45046 45031 367 201301007 10
45077 45025 367
45070 45023 367 201301007 10
45043 45014 367 200202001 04
45016 45009 367
45046 45009 367 200202001 04
45016 45016 367 200202001 04
45016 45009 367
45016 44999 367 200202001 04
45016 44999 367 200202001 04
45016 44999 367 200202001 04
45013 44994 367 200202001 04
44985 44980 367 200202001 04
44985 44980 367 200202001 04
44985 44983 367 200202001 04
44985 44980 367 200202001 04
44985 44967 367 200202001 04
44985 44964 367 200202001 04
44985 44964 367 200202001 04
44985 44964 367 201281002 09
44957 44949 367 201281002 09
44974 44949 367 201281002 09
44985 44943 367 201281002 09
44957 44943 367 201281002 09
44957 44934 367 201281002 09
44951 44934 367 201281002 09
44982 44934 367 201281002 09
44957 44934 367 201281002 04
44947 44930 367 201281002 09
44957 44930 367 201281002 09
Jarak TanamMHBM AreaKode Kegiat Nama KegiatNo PengeluaJenis Kegiat Kabupaten
2x3 2023104 PENANAMAN C1. Tanam Musi Rawas
2023104 PENANAMAN C1. Tanam Musi Rawas
2x3 2023104 PENANAMAN C1. Tanam Musi Rawas
2x3 2023104 PENANAMAN C1. Tanam Musi Rawas
2x3 2023104 PENANAMAN C1. Tanam Musi Rawas
2x3 2023104 PENANAMAN C1. Tanam Musi Rawas
2x3 2023104 PENANAMAN C1. Tanam Musi Rawas
2x3 2023104 PENANAMAN C1. Tanam Musi Rawas
2x3 2023104 PENANAMAN C1. Tanam Musi Rawas
2x3 2023104 PENANAMAN C1. Tanam Musi Rawas
2x3 2023104 PENANAMAN C1. Tanam Musi Rawas
2x3 2023104 PENANAMAN C1. Tanam Musi Rawas
2x3 2023104 PENANAMAN C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2308220000C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2307220434C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2307220448C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2307220384C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2307220372C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2307220220C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2307220344C1. Tanam PALI
2x3 2023104 PENANAMA 2307220449C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2307220222C1. Tanam Muara Enim
2x3 2023104 PENANAMA 2306220269C1. Tanam Muara Enim
2x3 2023104 PENANAMA 2306220298C1. Tanam Muara Enim
2x3 2023104 PENANAMA 2307220109C1. Tanam Muara Enim
2x3 2023104 PENANAMA 2306220341C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2306220298C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2307220232C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2306220012C1. Tanam Musi Rawas
2x3 Pagar Dewa 2023104 PENANAMAN C1. Tanam Muara Enim
2x3 2023104 PENANAMA 2305220383C1. Tanam Muara Enim
2x3 2023104 PENANAMA 2305220289C1. Tanam Muara Enim
2x3 2023104 PENANAMA 2305220126C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2306220028C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2305220210C1. Tanam Musi Rawas
2x3 Pagar Dewa 2023104 PENANAMAN C1. Tanam Muara Enim
2x3 Pagar Dewa 2023104 PENANAMAN C1. Tanam Muara Enim
2x3 Pagar Dewa 2023104 PENANAMAN C1. Tanam Muara Enim
2x3 2023104 PENANAMA 2304220221C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2305220247C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2306220052C1. Tanam Musi Rawas
2x3 2023104 PENANAMAN C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2305220181C1. Tanam PALI
2x3 2023104 PENANAMAN C1. Tanam PALI
2x3 2023104 PENANAMAN C1. Tanam PALI
2x3 2023104 PENANAMA 2306220052C1. Tanam Musi Rawas
2x3 2023104 PENANAMAN C1. Tanam Muara Enim
2x3 2023104 PENANAMAN C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2305220010C1. Tanam Muara Enim
2x3 2023104 PENANAMAN C1. Tanam Muara Enim
2x3 2023104 PENANAMA 2303220249C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2303220365C1. Tanam Muara Enim
2x3 2023104 PENANAMAN C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2303220214C1. Tanam Musi Rawas
2x3 2023104 PENANAMA 2303220245C1. Tanam Muara Enim
2x3 2023104 PENANAMA 2303220325C1. Tanam Muara Enim
2x3 2023104 PENANAMA 2303220325C1. Tanam Muara Enim
2x3 2023104 PENANAMA 2203220202C1. Tanam Muara Enim
2x3 2023104 PENANAMAN C1. Tanam Muara Enim
2x3 2023104 PENANAMAN C1. Tanam Muara Enim
2x3 2023104 PENANAMAN C1. Tanam Muara Enim
2x3 Ujan Mas La2023104 PENANAMAN C1. Tanam Muara Enim
2x3 Ujan Mas La2023104 PENANAMAN C1. Tanam Muara Enim
2x3 Ujan Mas La2023104 PENANAMAN C1. Tanam Muara Enim
2x3 Ujan Mas La2023104 PENANAMAN C1. Tanam Muara Enim
2x3 Ujan Mas La2023104 PENANAMAN C1. Tanam Muara Enim
2x3 2023104 PENANAMAN C1. Tanam Muara Enim
2x3 2023104 PENANAMAN C1. Tanam Muara Enim
2x3 Ujan Mas La2023104 PENANAMAN C1. Tanam Muara Enim
2x3 2023104 PENANAMAN C1. Tanam Muara Enim
2x3 2023104 PENANAMAN C1. Tanam Muara Enim
2x3 2023104 PENANAMAN C1. Tanam Muara Enim
2x3 2023104 PENANAMAN C1. Tanam Muara Enim
2x3 2023104 PENANAMA 2301220073C1. Tanam Muara Enim
2x3 2023104 PENANAMAN C1. Tanam Muara Enim
2x3 Ujan Mas La2023104 PENANAMAN C1. Tanam Muara Enim
Apr-22 May-22
Wilayah Unit
Target Actual Luas BAP Target Actual Luas BAP
1
2 20.73 20.73 20.73 26.43 26.43 26.43
1 3 12.18 12.18 11.92
4 40.38 40.38 40.38 59.83 59.83 59.83
5
6
7
2 8 25.50 25.50 25.50
9 41.15 41.15 41.15
11 54.61 54.61 54.61 59.30 59.30 48.70
10
13 137.29 137.29 137.29 33.49 33.49 33.49
3
14 27.54 27.54 27.54
15 63.04 63.04 63.04 64.65 64.65 64.64
Total 341.55 341.55 341.55 324.57 324.57 313.70
Jun-22 Jul-22 Aug-22
Target Actual Luas BAP Target Actual Luas BAP Target Actual Luas BAP

14.41 14.41 14.38 43 43 43 13.83 13.83 14


13 13 13 16 16 16.02 16.02 16
77 77 77 79 79 78 78.01 78.01 77

17 17 16 6.31 6.31 7
20.80 20.80 21
24 24 24
46 46 46 27 27 8 37.07 37.07 35

98 98 98 94 94 96 78.15 78.15 78

21 21 21 51 51 52 24.52 24.52 24
294 294 294 327 327 293 274.71 274.71 271
Sep-22 Oct-22 Nov-22
Target Actual Luas BAP Target Actual Luas BAP Target Actual Luas BAP

22 22 21 24 24 24

103 103 102 34 34 34 47 47 46


73 73 71 38 38 38

7 7 7
35 35 35
8 8 8
20 20 20
19 19 19 32 32 32 43 43 43
80 80 79 94 94 94 60

15 15 15 60 60
230 230 228 247 247 246 276 276 274
- (2.38)
Dec-22 Jan-23 Feb-23
Target Actual Luas BAP Target Actual Luas BAP Target Actual Luas BAP
-
- 38 38 38
14 14 14 49 49 49
16 16 17 26 26 25
41 41 40 19 19 19
- 24 - - 24 24 24
- 21 21 21
76 76 82 40 14 14
47 47 47
-
15 15 15 11 10 10
-
- 70
51 51 51 123 82 82 98 66 65
260 260 266 268 176 176 274 172 171
- - 6.26 - (91.95) (91.95) (101.74) (102.75)
Up to Feb 23
Target Actual Luas BAP
- - -
202.43 202.43 201.25
120.77 120.25 103.91
559.39 559.39 556.48
170.99 170.99 168.51 1,030.15
48.52 24.26 24.25
51.35 50.46 50.37
197.49 171.94 177.42
119.44 119.44 119.53
244.02 244.02 212.24 583.81
119.80 119.55 119.33
614.73 615.03 676.33
97.32 27.54 27.54
571.59 499.15 437.72 1,260.92
3,118 2,924 2,875 2,874.88
Clone planting Oct result
Apr-22 May-22
Area Unit
Budget Target BAP Budget Target
1 - -
2 22 21 21 26 26
1 3 - - 12
4 65 40 40 60 60
5 - - - - -
W1 87 61 61 86 98
6 - - - - -
7 - - - - -
2 8 20 26 26 - -
9 - - - 41 29
11 50 55 55 60 44
W2 70 80 80 101 73
10 - - - - -
13 103 137 137 33 33
3
14 - - - - 28
15 - 63 63 39 65
W3 103 200 200 72 126
Total 260 342 342 260 298

Clone Planting Target in Nov


Oct
Wilayah Unit
Target Luas BAP
1
2
1 3
4 30
5 Err:509
7
8
2
9
11
10 Err:509

3
13 94
3
14
15 Err:509
Total Err:509 -
May-22 Jun-22 Jul-22 Aug-22
BAP Budget Target BAP Budget Target BAP Budget

26 14 14 14 33 43 43 14
12 13 13 13 4 16
60 65 77 77 73 79 78 69
-
98 93 105 105 106 126 121 99
-
- 17 16 6
- 21
41 24 24 24
49 46 46 46 22 27 8 37
90 70 70 70 22 43 25 64
-
33 76 98 98 81 94 96 72
28
65 21 21 21 51 51 52 25
126 97 119 119 132 146 147 97
314 260 294 294 260 315 293 260
Aug-22 Sep-22 Oct-22 Nov-22
Target BAP Budget Target BAP Budget Target BAP Budget
-
17 14 21.94 22 21 - - - 24
16 16 - - - -
78 77 103.17 103 102 33.63 34 34 47
73.11 73 71 35
111 107 125 125 123 107 107 105 106
-
6 7 6.75 7 7 - - - -
21 21 32
8
37 35 10
64 62 7 7 7 - - - 50
48.30 42 19 44.98 62 32 43
107 78 79.84 80 79 93.53 94 94 -
- - - -
25 24 14.75 15 15 60
131 102 128 122 98 153 170 140 104
306 271 260 254 228 260 277 246 260
-
Nov-22 Dec-22 Jan-23 Feb-23
Target BAP Budget Target BAP Budget Target BAP Budget
- - - - -
24 24 - - - 38
- - 14 14 14 49 49 49
47 46 16 16 17 26
37 38 41 41 40 19
108 108 71 71 71 49 49 49 82
- - - - - 24 24 - 24
- - - - - 21 21 21
35 35 76 76 82 40 40 14
8 8 47 47 47
20 20 - - -
63 63 123 123 129 85 86 35 24
43 43 15 15 15 11 11 10
- 60 - - -
- - - - - 56
60 - 51 51 51 115 123 82 98
104 104 66 66 66 126 134 93 154
275 274 260 260 266 260 268 176 260
-
5.00 - (122)

2295
Feb-23 Up to Feb 23
Area Unit
Target BAP Budget Target BAP
- - - 1
38 38 194 205 201 2
93 108 104 1 3
26 25 557 559 556 4
19 19 168 170 169 5
82 82 1,011 1,043 1,030 W1
24 24 49 - - 6
35 51 50 7
189 198 177 2 8
120 107 120 9
225 229 212 11
24 24 617 586 560 W2
162 173 119 10
540 643 676 13
3
56 28 28 14
66 65 475 540 438 15
66 65 1,233 1,384 1,261 W3
172 171 2,860 3,012 2,851 MHP
- 9.52
82.74
April 22 to JAN 23 Actual Feb 23 Target Mar 23
Budget Target BAP Budget Target BAP Budget Target
- - -
156 167 163 38 38 38
93 108 104 32 32
531 534 531 26 26 25 48 48
149 151 150 19 19 19 30 30
929 961 948 82 82 82 110 110
24 24 - 24 24 24
35 51 50
189 198 177 38 38
120 107 120 42 42
225 229 212
592 610 560 24 24 24 80 80
162 173 119
540 643 676
- 28 28 56 70 70 103
377 474 373 98 98 65
1,079 1,318 1,196 154 168 65 70 103
2,600 2,889 2,704 260 274 171 260 293
rget Mar 23 Up to Mar 23
BAP Budget Target BAP
- - -
194 205 201
32 125 141 136
48 604 607 604
30 198 200 199
110 1,121 1,153 1,140
49 49 24
35 51 50
38 228 236 216
42 161 149 161
225 229 212
80 697 715 664
162 173 119
540 643 676
100 125 200 127
475 572 438
100 1,302 1,588 1,360
290 3,120 3,456 3,165
BAP up to Feb 23
Wilayah Clone 47 Clone 148 Clone 227 Total (Ha)
1 541 468 20 1,030 899.27
2 447 137 - 584 525.04
3 831 424 5 1,261 1,103.27
MHP 1,820 1,030 26 2,875 2,527.58
- 130.88
- 58.78
- 157.65
- 347.31