You are on page 1of 19

DAILY PROGRESS REPORT

(Construction Work )

M/s BRC Pvt Ltd Ms/ JPEC

Contractor OIL Project Management Consultant Owner Oil India Limited

Date 06/07/2021 06/07/2021


Weather Conditions cloudy cloudy

WO Reference
Owner M/s Oil India Ltd
Consultant M/S JPEC
Contractor M/s BRC Pvt Ltd
ACTIVITY ACTIVITY END UNIT of TOTAL SCOPE OF WORK( As
SL NO DESCRIPTION START DATE DATE qty per topographical survey ) PREV. WORKDONE TODAY WORKDONE NEXTDAY PLAN CUMM. WORKDONE BALANCE WORK

PLAN DAY NIGHT


1.00 Earth Filling qty percentage qty percentage qty percentage qty percentage qty percentage qty percentage qty percentage qty percentage

Earth filling, levelling and compaction by JCB, Poclain, Dumper, Road cubic
roller etc. 15/04/2021 on process 61100.00 100% 22239.00 36.40% 109.00 0.18% 0.00 0.00% 0.00 0.00% 109.00 0.18% 22239.00 36.40% 38861.00 63.60%
metre

2.00 STORM WATER RESERVOIR

3.00 FIRE WATER RESERVOIR

4.00 Divesion of Nullah


06/07/2021
cloudy

REMARKS

Geotechnical investigation ends. Earthfilling at halt due to area


waterlogging.
Project Name: Land Redevelopment Works at Baghjan, Assam of M/s Oil India Ltd.

Owner M/s OIL india Ltd.


Consultant M/s JPEC
Contractor M/s BRC Pvt Ltd.
Contract No 6115347

CONSTRUCTION AND COMMISIONING (SCHEDULED)

Sl no Structure Scope of work Unit Time period

Month week

A Activity- Earthfilling Cubic Metre


1 EARTHFILLING 61,100 Cubic Metre APR '21
W1

W2

W3

W4

MAY '21
W1

W2

W3

W4

JUNE '21
W1

W2
W3

W4

JULY '21
W1

W2

W3

W4

AUG '21
W1

W2

W3

W4

SEP '21
W1

W2

W3

W4

OCT '21
W1

W2

W3

W4
NOV '21
W1

W2

W3

W4

B Activity- CONCRETE

1 STORM WATER RESERVOIR

2 FIRE WATER RESERVOIR

3 DIVERSION OF NULLAH
DULED) CONSTRUCTION AND COMMISIONING (ACTUAL)

Qty of work in Workdone Upto PLANNED for the Workdone for


Time period Prev. Day Day the Day
CuM

days

61100(approx.) 22239.00 109.00 0.00


15275
3818
per day 545
3818
per day 545
3818
per day 545
3818
per day 545

3055
764
per day 109
764
per day 109
764
per day 109
764
per day 109

3055
764
per day 109
764
per day 109
764
per day 109
764
per day 109

3055
764
per day 109
764
per day 109
764
per day 109
764
per day 109

6110
1527
per day 218
1527
per day 218
1527
per day 218
1527
per day 218

10692
2673
per day 382
2673
per day 382
2673
per day 382
2673
per day 382

12220
3055
per day 436
3055
per day 436
3055
per day 436
3055
per day 436

7638
1909
per day 273
1909
per day 273
1909
per day 273
1909
per day 273
MMISIONING (ACTUAL)

Cumm. Balance
Completed

22239.00 38861.00
Project Name: Land Redevelopment Works at Baghjan, Assam of M/s Oil India Ltd.

Owner M/s OIL india Ltd.


Consultant M/s JPEC
Contractor M/s BRC Pvt Ltd.
Contract No 6115347
ESurveying
Quantity Report
Sl. Section Previous Cutting Volume
No. From Section Difference Width Area Previous
Sq. Meters Area
1 739409.498 - 0.000 0.000 0.000 0.000
2 739410.000 739409.498 0.502 0.765 0.000 0.000
3 739420.000 739410.000 10.000 70.000 0.000 0.000
4 739430.000 739420.000 10.000 87.245 0.000 0.000
5 739440.000 739430.000 10.000 93.459 0.000 0.000
6 739450.000 739440.000 10.000 99.674 0.000 0.000
7 739460.000 739450.000 10.000 112.072 0.000 0.000
8 739470.000 739460.000 10.000 119.795 0.000 0.000
9 739480.000 739470.000 10.000 125.230 0.000 0.000
10 739490.000 739480.000 10.000 129.112 0.000 0.000
11 739500.000 739490.000 10.000 132.915 0.000 0.000
12 739510.000 739500.000 10.000 135.433 0.000 0.000
13 739520.000 739510.000 10.000 92.778 0.000 0.000
14 739530.000 739520.000 10.000 63.913 0.000 0.000
15 739540.000 739530.000 10.000 67.347 0.000 0.000
16 739550.000 739540.000 10.000 77.987 0.000 0.000
17 739560.000 739550.000 10.000 83.714 0.000 0.000
18 739570.000 739560.000 10.000 90.152 0.000 0.000
19 739580.000 739570.000 10.000 96.976 0.000 0.000
20 739590.000 739580.000 10.000 103.801 0.000 0.000
21 739600.000 739590.000 10.000 110.662 0.000 0.000
22 739610.000 739600.000 10.000 150.612 0.000 0.000
23 739620.000 739610.000 10.000 168.090 0.000 0.000
24 739630.000 739620.000 10.000 171.813 0.000 0.000
25 739640.000 739630.000 10.000 175.536 0.000 0.000
26 739650.000 739640.000 10.000 189.334 0.000 0.000
27 739660.000 739650.000 10.000 195.530 0.000 0.000
28 739670.000 739660.000 10.000 202.250 0.000 0.000
29 739680.000 739670.000 10.000 207.358 0.000 0.000
30 739690.000 739680.000 10.000 207.364 0.000 0.000
31 739700.000 739690.000 10.000 208.134 0.000 0.000
32 739710.000 739700.000 10.000 208.906 0.000 0.000
33 739720.000 739710.000 10.000 208.990 0.000 0.000
34 739730.000 739720.000 10.000 208.960 0.477 0.000
35 739740.000 739730.000 10.000 209.031 0.067 0.477
36 739750.000 739740.000 10.000 209.089 1.973 0.067
37 739760.000 739750.000 10.000 209.072 5.617 1.973
38 739770.000 739760.000 10.000 209.070 5.364 5.617
39 739780.000 739770.000 10.000 178.415 1.124 5.364
40 739790.000 739780.000 10.000 142.994 0.000 1.124
41 739800.000 739790.000 10.000 110.786 0.000 0.000
42 739810.000 739800.000 10.000 80.351 0.000 0.000
43 739820.000 739810.000 10.000 47.616 0.000 0.000
44 739830.000 739820.000 10.000 30.143 0.000 0.000
45 739840.000 739830.000 10.000 1.657 0.000 0.000
Total
td.

ESurveying
antity Report
Filling Volume
Average Volume Area Previous Average Volume
Sq. Meters Cubic Meters Sq. Meters Area Sq. Meters Cubic Meters
0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.544 0.000 0.272 0.137
0.000 0.000 28.477 0.544 14.511 145.107
0.000 0.000 98.341 28.477 63.409 634.089
0.000 0.000 135.149 98.341 116.745 1167.447
0.000 0.000 137.889 135.149 136.519 1365.187
0.000 0.000 148.676 137.889 143.282 1432.824
0.000 0.000 153.621 148.676 151.149 1511.487
0.000 0.000 162.476 153.621 158.049 1580.489
0.000 0.000 147.227 162.476 154.852 1548.515
0.000 0.000 141.333 147.227 144.280 1442.798
0.000 0.000 143.264 141.333 142.299 1422.986
0.000 0.000 99.647 143.264 121.456 1214.556
0.000 0.000 80.421 99.647 90.034 900.338
0.000 0.000 79.721 80.421 80.071 800.709
0.000 0.000 78.250 79.721 78.985 789.854
0.000 0.000 79.197 78.250 78.724 787.236
0.000 0.000 93.456 79.197 86.327 863.269
0.000 0.000 102.611 93.456 98.034 980.337
0.000 0.000 124.537 102.611 113.574 1135.741
0.000 0.000 153.270 124.537 138.904 1389.037
0.000 0.000 203.064 153.270 178.167 1781.672
0.000 0.000 231.528 203.064 217.296 2172.961
0.000 0.000 224.959 231.528 228.244 2282.437
0.000 0.000 233.107 224.959 229.033 2290.332
0.000 0.000 251.539 233.107 242.323 2423.230
0.000 0.000 229.478 251.539 240.508 2405.084
0.000 0.000 201.359 229.478 215.418 2154.183
0.000 0.000 214.644 201.359 208.001 2080.015
0.000 0.000 207.907 214.644 211.275 2112.754
0.000 0.000 202.565 207.907 205.236 2052.359
0.000 0.000 213.384 202.565 207.975 2079.746
0.000 0.000 215.141 213.384 214.262 2142.623
0.239 2.385 248.523 215.141 231.832 2318.319
0.272 2.720 200.393 248.523 224.458 2244.580
1.020 10.200 166.635 200.393 183.514 1835.138
3.795 37.952 127.486 166.635 147.060 1470.604
5.491 54.906 103.268 127.486 115.377 1153.768
3.244 32.437 125.320 103.268 114.294 1142.940
0.562 5.618 119.568 125.320 122.444 1224.442
0.000 0.000 78.946 119.568 99.257 992.573
0.000 0.000 74.854 78.946 76.900 769.000
0.000 0.000 37.152 74.854 56.003 560.027
0.000 0.000 11.368 37.152 24.260 242.600
0.000 0.000 0.239 11.368 5.804 58.038
146.218 61101.568
DAILY PROGRESS REPORT
(Manpower & Machinery Deployed)

M/s BRC Ms/ JPEC Oil India Limited

Civil Contractor OIL Project Management Consultant Owner


Date 06/07/2021
Weather Conditions cloudy
20
Contract No 6115347
Owner M/s OIL india Ltd.
Consultant Ms/ JPEC
Contractor M/s BRC Pvt Ltd.
15.05.2021

Manpower Engagement Details


Nos
PLANNED ACTUAL
RCM
Safety / HSE officer 1 1
Civil Engineer 1 1
Mechanical Engineer 0 0
Mechanical Supervisor 1 1
Civil worker 25 3
Electrical 1 0
Structural Worker 0 0
Security Guard 1 1
Gardener 0 0
Electrician 1 0
IR Officer 0 0
Store Incharge 1 1
Driver/opt 12 7
Other
Total

Engineering & Administrative staff >>>>

PLANT & MACHINERY DEPLOYED


Category Available Working Break down
Total
M/s BRC Pvt Ltd. Ms/ JPEC Oil India Limited
Contractor OIL Project Management Consultant Owner
Date 06/07/2021
Weather conditions cloudy

Project Name:

WO Reference
Owner M/s OIL india Ltd.
Consultant Ms/ JPEC
Contractor M/s BRC Pvt Ltd.

Quantity
Received Received Till Cummulative
Sl No Material description UOM Remarks
Consumed today Prev.day Received ( E )
Scope (A) Available (B =E-C)
(C)

Material for Mobilization Activity

Soil for earth filling

Machinery Mobilisation for Construction work (Civil)


JCB nos 3 2.00
Plate Compactor nos 1 0.00
Mixture Machine nos 1 1.00
Grader nos 1 1.00
Hydra nos 1 0.00
Fiori nos 1 1.00
Road roller nos 1 1.00
Bolero pick up nos 1 0.00
Water Tanker nos 1 1.00
Truck nos 1 1.00
Poclain nos 3 1.00
Vibrator nos 2 2.00
Auto level equipment nos 3 0.00
Dumper nos 4 6.00
vibratory roller nos 1 1.00
Water pump 5 Hp nos 1 1.00
Water pump 2 Hp nos 1 1.00
Winch machine nos 0 0.00
DAILY PROGRESS REPORT
(Daily Highlights / Events / Incidents register)

M/s BRC Pvt Ltd. Ms/ JPEC Oil India Limited


Contractor OIL Project Management Consultant Owner
Date :06-07-2021
Project Name : Hiring of services for land redevelopment works at Baghjan, Assam
Owner M/s OIL India Ltd.
Consultant Ms/ JPEC
Contractor M/s BRC Pvt Ltd.
Date EVENTS/INCIDENTS RELATED TO WORK, ACCIDENTS, SECURITY, DISCIPLINE, ATTRITION, BANDH ETC.
DAILY PROGRESS REPORT
(Site Progress Photos)

M/s BRC Pvt Ltd. M/s JPEC Oil India Limited


Contractor OIL Project Management Consultant Owner
Date 06/07/2021
Weather Conditions Rainy

WO Reference
Owner M/s OIL india Ltd.
Consultant M/s JPEC
Contractor M/s BRC Pvt Ltd.

1 16.05.21 to 19.05.21

2 20.05.21

21.05.21 to
3 22.05.21

5 27.05.21

5 29.05.21

6 31.05.21
7 01.06.21 to 07.06.21

8 08.06.21 to 11.06.21

9 15.06.21

10 16.06.21

11 18.06.21

12 25.06.21 to 28.06.2021
CHRONOLOGICAL ACHIEVEMENTS
(Dismantling & Construction Works)

HAL Offshore Limited Richard Design Services India PVT. LTD Oil India Limited
LSTK Contractor OIL Engineering & Project Management Consultant Owner
Date 6-Jul-21
Weather conditions cloudy
Project Name: Engineering, Procurement, Construction, Testing and Commissioning of Central Bowser Station(CBUS),Duliajan, Assam Oil India Limited .

WO Reference 6208819
Owner M/s OIL INDIA LTD
Consultant Richard Design Services India PVT. LTD
Contractor HAL Offshore Limited

Days Programme Cumulative Next Day Plan


Drg. Plan as per For the
Sl. No Description Commencing Date Unit Total Scope Available R0 Schedule month As per Completion Date Remarks
Planned Actual Actual Balance As per physical Site
Schedule Condition
Dismantling & Construction Works
1 Area barrication inside CBUS 15/07/2019 RMTR 165.0 165.000 0.000 27.07.2019

2 Temporary Gate Fixing 08/02/2019 NOS 3.0 3.000 0.000 08/07/2019

3 Dismantling of dead pipe (Out side CBUS) 08/05/2019 MTR 650 650.000 0.000 08/09/2019

4 Dismantling of Existing Pipes (Inside New CBUS) 08/09/2019 Mtrs 3049.0 3049.0 0.000 17/08/2019

Dismantling of MS Tank -2 NO Inside new CBUS


5 (10 mm thick plate) 22/08/2019 SQM 330.0 330.000 0.000 27/08/2019

Dismantling of MS Tank -2 No Inside new CBUS


6 (ISA Angle ) 22/08/2019 MTR 125.70 125.700 0.000 27/08/2019

7 Dismantling of MS Tank -2 No Inside new CBUS 22/08/2019 MTR 83.40 83.400 0.000 27/08/2019
(PIPE )

8 Dismantling of dead Pipes (Inside OCS-3) 08/06/2019 MTR 2932 2932 0.000 03/09/2019

Dismantling of Existing Pipes in OCS-3 out side


9 near of drain. 08/07/2019 Mtrs 900 900 0 03/09/2019

10 Dismantling of Existing structural Inside OCS-3 17/08/2019 Mtrs 637 637.000 0.000 18/08/2019

11 Dismantling of separating wall and walk way 13/08/2019 CUM 30.00 30.000 0.000 22/08/2019
inside CBUS

12 Dismantling of existing Boundary Wall 08/07/2019 CUM 4.00 4.000 0.000 08/08/2019

Dismantling of Walk way inside OCS-3


13 ( PCC ) 20/08/2019 CUM 15 15.000 0.000 26/09/2019

14 Dismantling of walk way inside NEW CBUS 13/08/2019 CUM 9 9.000 0.000 22/08/2019

15 Dismaltling Existing VESSEL Shed in OCS-3 14/08/2019 Mtrs 162 162.000 0.000 27/08/2019

16 Temporary Area Barrication inside OCS-3 05.09.19 RMTR 137.0 137.000 0.0 17/10/2019

17 Approach road to construction entry/exit 08/07/2019 CUM 600.0 480.000 120.000