You are on page 1of 3

CIRCULLAM VITAE

ALMASKHAN

Contact Address ASPIRATION


current, +9710543359754
Home +918894554915
Seeking a Challenging Assignment in Electrician Construction /
Commissioning / Running Maintenance opportunity leveraging my
Skills, Power plant, Substation Oil & Gas Refinery Plant Experience
EMAIL:almaskhan8863@gmail.com
with an organization as a Electrical Technician.

Personal Data: Total Years of Experience: 6 Years

PROFESSIONAL EXPERIENCE
REMEL,WESCOSA Lighting Panel Power Panel & Transformer
Understanding & Trouble shutting installation cable tray for PC,CC ,
Sex : Male
Reference Drawings, Catalog Data & Construction Drawings.
Marital Status : Unmarried
Installation of transformers switchgear mcc panel installation
Nationality : Indian instrument panel IRP Panel CBN Paging telecommunication system,
Languages : English, Hindi, Fire Alarm control system power panel control panel for lighting
photo shell black out relay control panel installations lighting power
Passport No : S4276297
cable control cable Glanding termination as per cable schedule
Date of Expiry : 07/10/28
wiring diagram with complete MSGbody ground all over system.
Place of Issue : (PATNA)
Including pnchlist work finish PRE-COM work ACB OCB VCB MCB
Molded case circuit breaker thermal type breaker test IR Test CR Test
Primary

Company : Madina Group, Qatar Tech, W.L.L, Qatar

Location : Qatar Gas , Qatar

Position : ELECTRICAL TECHNICIAN.(Const)

Period : July 2021 to Dec 2021.

Company : ELMATICS ENGINEERS PVT.LTD

Position : Electrical Technician

Period : Feb 2019 to June 2021


Company : AARVI ENCON Pvt. Ltd
Location : HPCL Mittal Energy Ltd Batinda Punajab

Position : ELECTRICAL TECHNICIAN.(Const & Pre-com)

Period : Apri 2016 to Jan 2019

Jobs Held

✓ Fabrication & Installation of Power, Control & Instrument Cable Tray.


✓ Power, Control & Instrument Cable Pulling Dressing As Per Cable Schedule
✓ Glanding & Termination of all Cable & Almost Size.
✓ Installation of Transformer Dry Type & Oil Type
✓ Installation of Control Panel MCC Panel Lighting & Power Panel.
✓ Installation of CBN Paging Panel & FACP Panel for Fire Control.
✓ Installation of Fin Fan & Pump or Lubing Motors.
✓ Installation Lighting Fixture & Area Light.
✓ Installation & Testing of Heat Tracing System.
✓ Installation and Testing of Various types of Earthing Systems.
✓ Erection, Testing and Commissioning of Diesel Generator.
✓ Installation, Testing & Commissioning of HV and LV Switchgear.
✓ Installation, Testing & Commissioning of Electrical Protection and Earthing systems.
✓ Installation, Testing & Commissioning of LV Motors.
✓ Installation, Testing & Commissioning of HV & LV Transformers.
✓ Installation & Testing of HV and LV Cabling systems.
✓ REMEL WESCOSA Lighting power Panel & Transformers.
✓ Installation, Testing & Commissioning of Alternator.
✓ Working knowledge with Single Line Diagrams.
✓ Testing of MCCB,ACB,VCB,OCB Breakers Insulation Resistance, Contact Resistance & Primary
Current Injection Test.
✓ Operating of Megger for IR,CR & PCIT Tester for Testing .
✓ Testing of Current Transformer Potential Transformer Relays Overload.
✓ Insulation Resistance Test of all Power & Control Cables.
✓ Point to Point Test Internal Wiring Check in Side the Switchgear Mcc Feeders.
✓ Testing of Lighting System Power Outlet System.
✓ Knowledge of Single Line Diagram Cable Schedule & US Standards.
Jobs Held
✓ Installation & Testing of LT Motors.
✓ Installation & Testing of Electrical Power & Control Systems.
✓ Installation & Testing of Lighting Systems.
✓ Installation & Testing of Power, Control & Instrument Cables
✓ Installation & Testing of DG sets, Fire Engines, HT Breakers, Power Transformers, Relays,
Motors & their Starters, Capacitor banks, UPS, PA Systems, & Fire Alarm System etc.
✓ Knowledge of safety procedures being held in Oil & Petroleum Industry.
✓ Ability to detect fault & service the electrical equipment.
✓ Able to read industrial & commercial drawings.

Jobs held

❖ Working experience with heavy electrical construction field like (GAS Project, Refinery,
Petrochemical Power project etc.)
❖ Knowledge of low voltage distribution panel ,Low voltage Panel , ATS Panel Indoor and outdoor
type transformer.
❖ Familiarity with NEC electrical codes and industrial Work Standard.
❖ Familiar with electrical trouble shooting skills
❖ Ability to read and understand Industrial electrical Drawing.
❖ Installation, Testing & Pre-Commissioning for MV & LV Switchgear’ s, Transformer’ s, LV & MV
MCC Panels, UPS system & Overall substation power & lighting system in co-ordination with
vendors and Pre-Commissioning Engineer’ s
TECHNICAL QUALIFICATION

Diploma in Electrical Engineering

Covering Letter:-

6 years of experience working for EPC projects, shutdowns, maintenance in Oil & Gas Sector,
Refineries, Power Plants, Fertilizers, Petrochemicals, Utility plants and other process industries in
India and abroad. Have experiences installation, Erection, cabling, Logic/Function Testing, loop checking,
pre-commissioning, Commissioning & Maintenance of process control instruments. Fault Diagnosis,
Trouble Shooting of control panels, Electronic & Pneumatic instruments such as Transmitters, Controllers,
Indicators, Converters, Recorders, Switches and Control Valves etc.

I would be proud to join your team, so please let me know if you need any additional information. I hope to
hear from you in the near future. Thank you for your time and consideration.

Sincerely,

ALMAS KHAN

You might also like