Workers not inducted and wrong
1. Site Induction for all workers entering site.
Mobilization of communication which might be failure to
PPE / SAFETY 2. To comply with full PPE (safety helmet, safety shoes, safety gloves,long sleeve jacket, reflector for worker).
1 man-power comply with site rules, wrongly received 2 3 6 MEDIUM LOW Supervisor
INDUCTION 3. To ensure all workers have valid working permit and CIDB.
information and expose himself on
4. To have a good communication among the team.
hazard.
1. No un-authorized person shall be not entering the access during access preparation.
2. Proper signages shall be installed for alarming public and others un-authorized workers.
3. Visible reflective jackets shall be wear during preparing access.
4. Traffic management officer is requested to supervise during the manuver and access preparation.
Setting up Machine topple/ properties damaged/ 5. PPE shall be use at all time during working
PPE / SAFETY
2 overhead crane load collapse/ working at height/ falling 3 2 6 MEDIUM 6. Access shall be inspected before preparation work proceed . LOW Supervisor
INDUCTION
object. 7. Machinery shall be operated by trained operator.
8. Signal man shall be assigned.
9. Briefing shall be conducted before proceeding the works.
10. Body harness shall be used whenever working at height is involved.
11. PTW shall be applied when needed.
Ergonomic body posture may cause the 1. Rest area is compulsory to be constructed at site as welfare.
Ergonomic PPE / SAFETY
6 workers having a body pain in short or 2 1 2 LOW 2. Workers shall apply buddy system among them. LOW Supervisor
INDUCTION
long term. 3. Shifting work system or rotating system among them.
c
1. Hazard Identification 2. Risk Analysis 3. Risk Control
n
io
at
g
d
in
RESIDUAL
c
oo
ity
ifi
at
Item Work Activities POTENTIAL HAZARD CONSEQUENCE Existing Risk Control Recommended Control Measures ACTION BY
ih
ss
R
RISK
ve
l
la
ke
is k
Se
C
Li
is k
R
1.Workers Namelist 1.Site Supervisor
Pedistrian struck by moving 1. Basic PPE 2.Flagman.
Serious Injury 2 3 6 MEDIUM LOW
Mobilization and vehicle 2. Safety Induction 3. Prework Checklist. 2.Operator
demobilization of 4. Toolbox Briefing 3.Driver
1 machinery , tools, equipment
and materials at site 1.Site Supervisor
1. Speed Limit 1.Traffic Layout Plan.
Collison with equipment or other
Property damage 2.Operator Compentency 2 3 6 MEDIUM 2.Crane Checklist. LOW 2.Operator
vehicle
3.Safety Briefing 4.Supervision 3.Driver
4.Flagman
1.Site Supervisor
1. Topple
2. Property 1. Prestart checklist
Unstable ground 1. Proper footing / Sleeper 2 3 6 MEDIUM LOW 2.Operator
Damage 2.Work Briefing
3.Driver
3.Serious Injury
2.Operator
1. Serious Injury 1.Lifting Equipment Checklist
3.Driver
Lifting tackle or accessories failure 2. Property 1. Lifting equipment inspection 2 3 6 MEDIUM 2.Lifitng Plan Layout LOW
4. Safety
damage 3.Toolbox
Supervisor
5.
Lifting
1.Site Supervisor
Supervisor
2.Operator
1. Serious Injury 1.Lifting Equipment Checklist
Lifting tackle or accessories failure 2. Property 1. Lifting equipment inspection 2 3 6 MEDIUM 2.Lifitng Plan Layout LOW
3. Safety
Performing lifting work damage 3.Toolbox
Supervisor
during installation of steel
4.
tube pile driven, gantry track,
3 Lifting Supervisor
gantry crane outrigger,gantry
crane girder installation and 1.Site Supervisor
1. Serious Injury
electric hoist. 1. Weather forecast
High wind velocity 2. Property 2 3 6 MEDIUM 1.Pre Start Work Checklist LOW
2. Close supervision 2.Operator
damage
Performing lifting work
during installation of steel
tube pile driven, gantry track,
3
gantry crane outrigger,gantry
crane girder installation and
electric hoist.
1.Max.Load
1. Skill Worker (Signalman/Rigger) Calculation 1.Site Supervisor
1. Serious Injury
2.Basic PPE 2.Machinery Checklist
Suspended load 2. Property 2 4 8 MEDIUM LOW
3.Barricade + Signage 3.Step by Step 2.Operator
damage
4.Lifting equipment inspection Checklist
4.Tag line
1.Site Supervisor
1.Work load inspection
Exceeding safe Topple 2.Proper lifting plan 1.Lifting Plan
2.Operator
lifting radius or safe Serious injury 3.Refer load indicator 2 4 8 MEDIUM 2.Lifting Plan Layout LOW
work load Property damage 4.Barricade and signages the lifting 3.Machinery Checklist
3. Lifting
area
Supervisor
1.Machine guarding
2.Basic PPE+Safety Glass+Gloves
(cut resistance)
Over speeding of Serious injury due 1.Supervisor
4. Pre check cutting equipment
cutting equipment to cutting disc 2 3 6 MEDIUM 1.Inspection Checklist LOW
(Ensure Compatibiltiy of
i.e Grinder brake apart 2.Welder
cutting/grinding disk with machine
5.Cutting disc not to be used for
grinding)
1.Supervisor
1.Basic PPE
Serious Injury or 2.Full Body Harness with anchor 1.Attendance List 2.Operator
Falling from Height 2 4 8 MEDIUM LOW
Fatality point 2.W@H Sticker
Working at 3.Working at Height Training 3.Signalman
5 Height during installation
gantry crane girder Topple 1.Supervisor
1.Valid PMA
Serious injury 1.Machinery inspection
Machinery failure 2 4 8 MEDIUM 2.Machinery LOW
Property damage 2.Certified Skylift operator 2.Operator
Checklist
Fatality
Leaking current from Electrical shock/ 1.Pre check electrical equipment 1.Inspection Checklist 1.Supervisor
2 3 6 MEDIUM LOW
machine heart attack 2.Cable management 2.Equipment Tagging System
Hearing 1.Supervisor
High noise levels 1.Earplug 2 2 4 LOW 1.Inspection Checklist LOW
impairment / loss
Working
7 Outdoors
Working 1.Rest area / Shelter
High humidity / Heat stroke or 1.Supervisor
7 Outdoors 2.Drinking fresh water 2 2 4 LOW 1.Inspection Checklist LOW
hot weather dehydration
3.Rest time
1.Supervisor
Bitten by venomous Unconsiclous 1.Visual inspection 1.Send to nearest Hospital
2 3 6 MEDIUM 2.Emergency vehicle LOW
animal i.e snake Cardiac arrest 2.Standby bamboo stick
2.First Aider
1.Inspection Checklist
2.Work briefing 1.Supervisor
Sharp edge Cut 1. Wear PPE 2 2 4 LOW LOW
3.Pre start checklist
4.Supervision