Jeddah Sound Strom 2023

Doc: No: _______________________


Projects
Rev:00
PROJECT LIFTING PLAN Sub Contractor:
Steel Brigde Contracting Company

Project Lifting Plan – Basic / Standard / Complex (Delete as applicable)

Contractor: - Package:

1.

Specialist lifting Contractor: -

Contractor Managing Lift: -

2.

Date of Operation: From: To:

Brief Scope of Lifting Operation: -

3. Summary CV of the Appointed / Competent Person: -

Name: CPCS No; Exp date;


D. L. Exp date;

Expérience / Relevant Qualification (CPCS A61): -

4. Name and training achievements of slinger / signalers (CPCS A40): -

Name: CPCS No; Exp date;

Name: CPCS No; Exp date;

Name: CPCS No; Exp date;

NB. Orange Hi Vis & Hard hat (red) to be worn by slinger / signaler

5. Description of Load:

a. Weight

b. Characteristics

c. Method of Lifting

d. Centre of gravity

e. Lifting points / or
method of slingling
6. Sketch of load / slinging of if applicable:
Jeddah Sound Strom 2023
Doc: No: _______________________
Projects
Rev:00
PROJECT LIFTING PLAN Sub Contractor:
Steel Brigde Contracting Company

7. Lifting Equipment to be used (i.e. crane, excavator, genie hoist etc.):

Plate No: Exp date: CPCS No: Exp date:

a. Make / Model:

b. Maximum capacity:

c. Counterweight: :

d. Main boom length:

e. Fly jib / extension:

f. Outrigger loads:

g. Maximum working radius :

h. Rated capacity at working radius:

8. Lifting accessories to be used (i.e. chains, slings, shackles, etc.):

9. Proximity hazard considerations:

Y/N Details (continue on separate sheet if necessary)

a. O/H power lines:

b. Railways:

c. Proximity to buildings:

d. Proximity to
boundaries:
e. U/G
Services/drains/cellars
:
f. Other lifting/plant:

g. Other – specify:

10. Existing ground conditions / conditions required - what measures will be taken to make safe (i.e. pads/plates etc.):

11. N/A, however steel plate will be used under crawler when and where required

Are any temporary works involved in Y/N 3rd party check complete? Y/N
the lift?
Jeddah Sound Strom 2023
Doc: No: _______________________
Projects
Rev:00
PROJECT LIFTING PLAN Sub Contractor:
Steel Brigde Contracting Company
If yes, please specify:

12. Sketch showing position of crane/load before, during and after lift, including route of travel and interface with other plant /
cranes including distance of other buildings / plant.

13. What demarcation of the lifting area will be used and how will access be controlled:

14. How will the suspended load be controlled (e.g. tag lines etc.):

15. Crane rigging requirements (i.e. lay down area, slave crane, ground prep):

16. Access / Egress (Lifting Equipment, associated vehicles etc.):

17. Wind speed monitoring? Y/N

Crane’s own anemometer:

Other (please specify):

Max safe wind for lift taking account load characteristics & manufacturers recommendations:

Average: Km/h: mph:

Gust: Km/h: mph:

18. What type of lift is involved? Y/N

Open: Blind:

Please describe signaling system:


Jeddah Sound Strom 2023
Doc: No: _______________________
Projects
Rev:00
PROJECT LIFTING PLAN Sub Contractor:
Steel Brigde Contracting Company

19. What type of communication is Y/N


required?

Radio: Licensed:

Visual:

20. What is document reference number for the operation? Status

Reference number: A C

Risk
Assessment:

Method
Statement:

21. Y/N

Has Crane Checklist been completed for crane(s) used:

22. Y/N MOBILE ONLY – NOT TOWER CRANES

Is the operation a multiple crane lift? If yes, then submit details in accordance with Legal
Frame work reference/BS7121 Part1

23.

Appointed Person Sign Date


Contact Number

Crane coordinator Sign Date


Contact Number

HSE Manager Sign Date


Contact Number

24. Delegation of Duties

Appointed Person: Lifting Supervisor :


Name: Name: Signature:
Signature: Date:
Date: