Restaurant Construction drawing set

There are many variable factors in the process of decoration. Please read the drawings carefully
before construction and give feedback to the designer for adjustment if you find any conflicts or
objections with the site, any problems encountered during the construction, please contact the
designer in time so that we can quickly solve the problem for you.
PROJECT 项目名称:

RESTAURANT
CONSTRUCTION

CLIENT 业主:

设计师:
DESIGNER

制图:
DRAWN

校对:
CHECK

备注:
NOTE

日期:
DATE 2023-3-8

PRELIMINARY 初步方案

TENDER 招标用途

CONSTRUCTION 施工用途

TITLE 图纸名称:

ORIGINAL STRUCTURE

SCALE 比例:
Account for Legend Account for Legend Account for Legend Account for Legend

1:60
ORIGINAL STRUCTURE
Building drainage
Shear Wall Visual Intercom VI
Valve
main riserΦ160mm
Building drainage
Non-shear wall Air Conditioning Hole Gate Valve

Tear down the wall


riserΦ110mm

Toilet drain riser Gas Meter Gas Cold water line


P-01 DRAWING NO. 图纸编号:

Build a new brick wall


Floor Drain &
Drainage Riser
Strong Electric
Control Box
Hot Water line P-01
Weak current control
New Light body wall Heating Elv box Sewage pipes
box

INTERIOR DESIGN CO.,LTD


PROJECT 项目名称:

RESTAURANT
CONSTRUCTION

CLIENT 业主:

设计师:
DESIGNER

制图:
DRAWN

校对:
CHECK

备注:
NOTE

日期:
DATE 2023-3-8

PRELIMINARY 初步方案

TENDER 招标用途

CONSTRUCTION 施工用途

TITLE 图纸名称:

WALL DEMOLITION PLAN

SCALE 比例:
Account for Legend Account for Legend Account for Legend Account for Legend

1:60
WALL DEMOLITION PLAN
Building drainage
Shear Wall Visual Intercom VI
Valve
main riserΦ160mm
Building drainage
Non-shear wall Air Conditioning Hole Gate Valve

Tear down the wall


riserΦ110mm

Toilet drain riser Gas Meter Gas Cold water line


P-02 DRAWING NO. 图纸编号:

Build a new brick wall


Floor Drain &
Drainage Riser
Strong Electric
Control Box
Hot Water line P-02
Weak current control
New Light body wall Heating Elv box Sewage pipes
box

INTERIOR DESIGN CO.,LTD


PROJECT 项目名称:

RESTAURANT
CONSTRUCTION

CLIENT 业主:

设计师:
DESIGNER

制图:
DRAWN

校对:
CHECK

备注:
NOTE

日期:
DATE 2023-3-8

PRELIMINARY 初步方案

TENDER 招标用途

CONSTRUCTION 施工用途

TITLE 图纸名称:

NEW WALL PLAN

SCALE 比例:
Account for Legend Account for Legend Account for Legend Account for Legend

1:60
NEW WALL PLAN
Building drainage
Shear Wall Visual Intercom VI
Valve
main riserΦ160mm
Building drainage
Non-shear wall Air Conditioning Hole Gate Valve

Tear down the wall


riserΦ110mm

Toilet drain riser Gas Meter Gas Cold water line


P-03 DRAWING NO. 图纸编号:

Build a new brick wall


Floor Drain &
Drainage Riser
Strong Electric
Control Box
Hot Water line P-03
Weak current control
New Light body wall Heating Elv box Sewage pipes
box

INTERIOR DESIGN CO.,LTD


PROJECT 项目名称:

RESTAURANT
CONSTRUCTION

CLIENT 业主:

设计师:
DESIGNER

制图:
DRAWN
The height of the new door
opening is the same as that 校对:
of other door openings CHECK

备注:
NOTE

日期:
DATE 2023-3-8

PRELIMINARY 初步方案

TENDER 招标用途

CONSTRUCTION 施工用途

TITLE 图纸名称:

*In construction, the dimension of FLOOR PLAN


laying-out shall be taken as the standard
SCALE 比例:
Account for Legend Account for Legend Account for Legend Account for Legend

1:60
FLOOR PLAN
Building drainage
Shear Wall Visual Intercom VI
Valve
main riserΦ160mm
Building drainage
Non-shear wall Air Conditioning Hole Gate Valve

Tear down the wall


riserΦ110mm

Toilet drain riser Gas Meter Gas Cold water line


P-04 DRAWING NO. 图纸编号:

Build a new brick wall


Floor Drain &
Drainage Riser
Strong Electric
Control Box
Hot Water line P-04
Weak current control
New Light body wall Heating Elv box Sewage pipes
box

INTERIOR DESIGN CO.,LTD


PL 01 PL 02 PL 03
Wine cabinet Bar table Display cabinet

PROJECT 项目名称:

RESTAURANT
CONSTRUCTION

CLIENT 业主:
Toilet
Dining area

Operation area
设计师:
DESIGNER
Private Romm
制图:
Dining area DRAWN

Aisle 校对:
CHECK

备注:
NOTE

日期:
DATE 2023-3-8

PRELIMINARY 初步方案

TENDER 招标用途

CONSTRUCTION 施工用途

TITLE 图纸名称:

PLANE DIMENSION DRAWING

SCALE 比例:
Account for Legend Account for Legend Account for Legend Account for Legend

1:60
PLANE DIMENSION DRAWING
Building drainage
Shear Wall Visual Intercom VI
Valve
main riserΦ160mm
Building drainage
Non-shear wall Air Conditioning Hole Gate Valve

Tear down the wall


riserΦ110mm

Toilet drain riser Gas Meter Gas Cold water line


P-05 DRAWING NO. 图纸编号:

Build a new brick wall


Floor Drain &
Drainage Riser
Strong Electric
Control Box
Hot Water line P-05
Weak current control
New Light body wall Heating Elv box Sewage pipes
box

INTERIOR DESIGN CO.,LTD


PROJECT 项目名称:

RESTAURANT
CONSTRUCTION

310
1865

1100

1100

1100
465

1100

1100
CLIENT 业主:

1800
R700 760

500 600 600 600


515

3080
800
600 50
600
设计师:

700
3580 1220 DESIGNER

50 制图:
DRAWN

R200
600
校对:

1100

1100
CHECK
600 600 600

1100

1100

1100
备注:
NOTE

410
450

日期:
DATE 2023-3-8

PRELIMINARY 初步方案

TENDER 招标用途

CONSTRUCTION 施工用途

TITLE 图纸名称:

DIMENSIONAL POSITIONING
DRAWING

SCALE 比例:

DIMENSIONAL POSITIONING 1:60

P-06 DRAWING DRAWING NO. 图纸编号:

P-06

INTERIOR DESIGN CO.,LTD


CH 2600mm
PT 01
Cement paint

CH 2600mm
MT 02
Stainless steel water ripple plate

PROJECT 项目名称:

RESTAURANT
750
CONSTRUCTION

00
R7 CLIENT 业主:
1150 1400 1150
1400

Keep the original ceiling


设计师:
surface and roll cement paint
750

DESIGNER

制图:
DRAWN

校对:
CHECK

备注:
NOTE

日期:
DATE 2023-3-8

PRELIMINARY 初步方案

TENDER 招标用途

CONSTRUCTION 施工用途

TITLE 图纸名称:

THE LAYOUT OF THE SHED


SURFACE

SCALE 比例:
Account for

Emergency Lighting
Legend Account for

Downlight(LED)
Legend Account for

Recessed downlight
Legend
THE LAYOUT OF THE SHED 1:60
Craft
Chandelier(LED)
Naked downlight Buckle lamp(led) P-07 SURFACE DRAWING NO. 图纸编号:
Virtual Light
Ceiling Fan Light Exhaust Fan
Strip(LED) P-07
Track Reserve a line
Fluorescent lamp
spotlights(LED) °63 36° 36° position

INTERIOR DESIGN CO.,LTD


Reserved luminous Reserved luminous light Reserved lamp strip line Reserved lamp strip line Reserved wall luminous Reserved door light strip
word line position strip line position position in the cabinet position in the wine cabinet light with line position line position
H:1500mm H:800mm H:1500mm H:1500mm H:1000mm H:3000mm

PROJECT 项目名称:

RESTAURANT
CONSTRUCTION
410

550 900 900 900 900 1070

615
640
1250

1150
350
470

1270
600
470

1900

1260
业主:

700
800 CLIENT

900

2350
470 470 440
465

800
350

700

900
900
350

1200
470

设计师:
500

800
700
470

900 900 900 1650


DESIGNER

900
600

640

365
制图:
DRAWN

800
900 900 900 900 870
510

800 900 900 900 900

955
校对:

1660
495 CHECK
410

1450 900 900 900 1070 备注:


NOTE

395
日期:
DATE 2023-3-8
Reserved wall luminous Reserved wall luminous
Reserved TV ceiling line position Reserved wall lamp
modeling line position light with line position PRELIMINARY 初步方案
line position
H:1600mm H:1000mm
H:1800mm TENDER 招标用途

CONSTRUCTION 施工用途

*Remaining lamps in other places


TITLE 图纸名称:

*All circuits shall be fully threaded and yellow wax


tubes shall be fully threaded at the lamp wiring joints POSITION MAP OF LUMINAIRE
* All lamps shall be LED lamps
SCALE 比例:
Account for

Emergency Lighting
Legend Account for

Downlight(LED)
Legend Account for

Recessed downlight
Legend
POSITION MAP OF 1:60
Craft
Chandelier(LED)
Naked downlight Buckle lamp(led) P-08 LUMINAIRE DRAWING NO. 图纸编号:
Virtual Light
Ceiling Fan Light Exhaust Fan
Strip(LED) P-08
Track Reserve a line
Fluorescent lamp
spotlights(LED) °63 36° 36° position

INTERIOR DESIGN CO.,LTD


PROJECT 项目名称:

RESTAURANT
CONSTRUCTION

CLIENT 业主:

设计师:
DESIGNER

制图:
DRAWN

校对:
CHECK

备注:
NOTE

日期:
DATE 2023-3-8

PRELIMINARY 初步方案

TENDER 招标用途

CONSTRUCTION 施工用途

TITLE 图纸名称:

*All socket connections shall be left and right neutral ground wire SWITCH CONTROL DIAGRAM
* The outlet in the kitchen where water is used shall be covered
SCALE 比例:
Account for Legend Purpose Account for Legend Purpose

1:60
Single-phase two-and
three-pole socket250V,10A
Power supply
Single-phase three-pole
flat-pin socket 250V,16A
Single-phase switch triode
K Power supply
SWITCH CONTROL DIAGRAM
TV antenna socket Television signal flat pin socket250V,10A
X Power supply P-09 DRAWING NO. 图纸编号:
Waterproof five-hole
Phone Wall outlet Telephone signal Power supply
socket P-09
Computer With USB socket
Computer signal USB Power supply
Information Outlet 250V,10A

INTERIOR DESIGN CO.,LTD


Reserved five-hole waterproof socket panel point installation H:225mm

Reserved five-hole waterproof socket panel point installation H:1300mm

Reserved five-hole socket panel point installation H:500mm Reserved five-hole socket panel point installation H:500mm
Reserved five-hole socket panel point installationH:1100mm

Reserved five-hole socket panel point installation H:500mm Reserved five-hole socket panel point installationH:1100mm

PROJECT 项目名称:

RESTAURANT
CONSTRUCTION

200
1450
TO
888 1730 1730 870
300 1495 1890
235 CLIENT 业主:

385
设计师:
DESIGNER

1450 制图:
DRAWN

校对:
CHECK
1300 450
备注:
NOTE
888 1730 1730 870

日期:
DATE 2023-3-8
Reserved installation height of network socket panel 1100mm
PRELIMINARY 初步方案

Reserved five-hole socket panel point installation H:500mm Reserved five-hole socket panel point installationH:1100mm Reserved five-hole socket panel point installationH:1100mm TENDER 招标用途

CONSTRUCTION 施工用途

TITLE 图纸名称:

SOCKET CONTROL DIAGRAM

SCALE 比例:
Account for Legend Purpose Account for Legend Purpose

1:60
Single-phase two-and
three-pole socket250V,10A
Power supply
Single-phase three-pole
flat-pin socket 250V,16A
Single-phase switch triode
K Power supply
SOCKET CONTROL DIAGRAM
TV antenna socket Television signal flat pin socket250V,10A
X Power supply P-10 DRAWING NO. 图纸编号:
Waterproof five-hole
Phone Wall outlet Telephone signal Power supply
socket P-10
Computer With USB socket
Computer signal USB Power supply
Information Outlet 250V,10A

INTERIOR DESIGN CO.,LTD


Cold water height of toilet 300mm

Cold water height of basin 300mm

Hot water height of basin 300mm


PROJECT 项目名称:

RESTAURANT
CONSTRUCTION

580
CLIENT 业主:

1550 设计师:
DESIGNER

制图:
DRAWN

校对:
CHECK

备注:
NOTE

日期:
DATE 2023-3-8

PRELIMINARY 初步方案

TENDER 招标用途

CONSTRUCTION 施工用途

TITLE 图纸名称:

WATER SUPPLY POINT MAP

SCALE 比例:
Account for Legend Purpose Account for Legend Purpose

1:60
Single-phase two-and
three-pole socket250V,10A
Power supply
Single-phase three-pole
flat-pin socket 250V,16A
Single-phase switch triode
K Power supply
WATER SUPPLY POINT MAP
TV antenna socket Television signal flat pin socket250V,10A
X Power supply P-11 DRAWING NO. 图纸编号:
Waterproof five-hole
Phone Wall outlet Telephone signal Power supply
socket P-11
Computer With USB socket
Computer signal USB Power supply
Information Outlet 250V,10A

INTERIOR DESIGN CO.,LTD


PROJECT 项目名称:

RESTAURANT
CONSTRUCTION

CLIENT 业主:
A D
EL-05 EL-04

A
EL-02
D
EL-03 EL-01
C
设计师:
DESIGNER

制图:
DRAWN

校对:
CHECK

备注:
NOTE

日期:
DATE 2023-3-8

PRELIMINARY 初步方案

TENDER 招标用途

CONSTRUCTION 施工用途

TITLE 图纸名称:

ELEVATION INDEX

SCALE 比例:

1:60
ELEVATION INDEX
P-12 DRAWING NO. 图纸编号:

P-12

INTERIOR DESIGN CO.,LTD


PROJECT 项目名称:

RESTAURANT
CONSTRUCTION

CLIENT 业主:

设计师:
MT 01 DESIGNER
LED 01
Plate metals
1000

制图:
The back of stainless steel luminous characters is luminous DRAWN

LED 01
LED 01 校对:
CHECK
Embedded light band
All-body light box 备注:
NOTE

GL 01
日期:
12mm Armoured glass DATE 2023-3-8

PRELIMINARY 初步方案

TENDER 招标用途

CONSTRUCTION 施工用途

TITLE 图纸名称:

E-01 ELEVATION PLAN1

SCALE 比例:

1:40
E-01 ELEVATION PLAN1
---- DRAWING NO. 图纸编号:

----

INTERIOR DESIGN CO.,LTD


PROJECT 项目名称:

RESTAURANT
CONSTRUCTION

CLIENT 业主:

Embedded luminous light band

设计师:
DESIGNER

制图:
DRAWN

MT 01 校对:
CHECK
LED 01 Iron artwork
Luminous light band MT 01 备注:
NOTE
Plate metals
MT 01 LED 01
Stainless steel plate Resin luminous character front luminescence

PT 01
Cement paint LED 01
Embedded light band 日期:
2023-3-8
DATE

PRELIMINARY 初步方案

TENDER 招标用途

CONSTRUCTION 施工用途

TITLE 图纸名称:

E-02 ELEVATION PLAN2

SCALE 比例:

1:55
E-02 ELEVATION PLAN2
---- DRAWING NO. 图纸编号:

----

INTERIOR DESIGN CO.,LTD


PROJECT 项目名称:

RESTAURANT
CONSTRUCTION

CLIENT 业主:

设计师:
DESIGNER

制图:
Custom sheet metal DRAWN
PT 01
Cement paint 校对:
LED 01 CHECK
Neon modeling light
备注:
LED 01 LED 01 NOTE
Embedded luminous lemon yellow light Luminous light band
MT 01 PT 01
Painted metal plate Cement paint

日期:
DATE 2023-3-8

PRELIMINARY 初步方案

TENDER 招标用途

CONSTRUCTION 施工用途

TITLE 图纸名称:

E-03 ELEVATION PLAN3

SCALE 比例:

1:65
E-03 ELEVATION PLAN3
---- DRAWING NO. 图纸编号:

----

INTERIOR DESIGN CO.,LTD


PROJECT 项目名称:

RESTAURANT
CONSTRUCTION

CLIENT 业主:

设计师:
DESIGNER

制图:
DRAWN

PT 01 校对:
CHECK
Cement paint 备注:
NOTE

日期:
DATE 2023-3-8

MT 01 PRELIMINARY 初步方案

Painted stainless steel cabinet TENDER 招标用途

CONSTRUCTION 施工用途

TITLE 图纸名称:

E-04 ELEVATION PLAN4

SCALE 比例:

1:35
E-04 ELEVATION PLAN4
---- DRAWING NO. 图纸编号:

----

INTERIOR DESIGN CO.,LTD


PROJECT 项目名称:

RESTAURANT
CONSTRUCTION

CLIENT 业主:

设计师:
MT 01 DESIGNER
LED 01
Stainless steel plate 制图:
DRAWN
Embedded light band
校对:
CHECK

PT 01 LED 01 备注:
NOTE
Cement paint board Neon light belt shape

MT 01 日期:
2023-3-8
Iron artwork DATE

LED 01 PRELIMINARY 初步方案

Embedded light band TENDER 招标用途

CONSTRUCTION 施工用途

TITLE 图纸名称:

E-05 ELEVATION PLAN5

SCALE 比例:

1:35
E-05 ELEVATION PLAN5
---- DRAWING NO. 图纸编号:

----

INTERIOR DESIGN CO.,LTD


Iron partition painting

1100

PROJECT 项目名称:

50
RESTAURANT
CONSTRUCTION

1100 CLIENT 业主:

设计师:
DESIGNER

制图:
DRAWN

1200
校对:
CHECK

备注:
NOTE
2400

400
日期:
DATE 2023-3-8

PRELIMINARY 初步方案

TENDER 招标用途

800
CONSTRUCTION 施工用途

TITLE 图纸名称:

E-06 ELEVATION PLAN6

SCALE 比例:

1:20
E-06 ELEVATION PLAN6
---- DRAWING NO. 图纸编号:

----

INTERIOR DESIGN CO.,LTD


Cement paint bar table
PROJECT 项目名称:

700

RESTAURANT
CONSTRUCTION

CLIENT 业主:
3580

设计师:
DESIGNER

制图:
DRAWN

校对:
CHECK
Hollow brick
备注:
NOTE
100

100
1000

1000
900

900
日期:
DATE 2023-3-8

PRELIMINARY 初步方案
100 3380 100 290 120 290
TENDER 招标用途

3580 700 CONSTRUCTION 施工用途

TITLE 图纸名称:

E-07 ELEVATION PLAN7

SCALE 比例:

1:30
E-07 ELEVATION PLAN7
---- DRAWING NO. 图纸编号:

----

INTERIOR DESIGN CO.,LTD


PROJECT 项目名称:

RESTAURANT
Concrete wall base CONSTRUCTION
Interface agent together
CLIENT 业主:

Cement mortar underlay sweep hair


Cement lime mortar leveling layer
Scrape the putty three times
设计师:
DESIGNER

制图:

Close the bottom drawing again DRAWN

校对:

Two coats of cement paint CHECK

备注:
NOTE

日期:
DATE 2023-3-8

PRELIMINARY 初步方案

TENDER 招标用途

CONSTRUCTION 施工用途

TITLE 图纸名称:

NODE GRAPH1

SCALE 比例:

Wall cement paint 1:10

---- DRAWING NO. 图纸编号:

----

INTERIOR DESIGN CO.,LTD


Design specifications
1. The design is based on
1. The plane layout plan determined by party A. (3) all cloth, wallpaper should be half a year products, do not grow mildew not aging,
2. The functional requirements and technical requirements and have a certain fire performance.
proposed by Party A. (4) in case of shortage of materials, substitutes must be approved by the designer before
3. Construction drawings provided by party A. use. 2, construction requirements: (1) as the base of latex paint putty, must scrape putty
4. “Code for fire protection design of building interior three times to survive and have enough strength, self-made putty, putty should infiltrate
decoration”(GB-50022-95) into the appropriate amount of white latex and white cement, scraping putty layer can not
5. Code for construction and acceptance of architectural be too thick, cracking. (2) the joint of the base plate should be treated twice with 100MM
decoration engineering (JGJ73-91) . wide white cloth strip, and the latex paint can survive three times. (3) the metal
6. Other relevant norms in force in China. Note: if the antirust paint chooses the matching antirust primer, the antirust primer should brush
state promulgates the latest relevant technical after the thorough antirust, if can not remove the rust completely, may use the rust
specifications, the latest specifications shall prevail. If primer. (4) the wall and the smallpox latex paint construction must use the primer and the
the national paper appears to follow the above technical topcoat matching, in the smallpox important place must adopt, uses the high elasticity
specifications, the above national norms shall prevail. latex paint. (5) the construction of the building decoration project must be closely
2. Drawing contents coordinated with the construction of the water, electricity, air-conditioning and other
1. Floor plan, floor plan, floor plan, ceiling plan, etc. professional drawings. If any contradiction is found, the relevant parties should be
within the scope of decoration. organized to solve it through consultation in a timely manner. (6) professional lighting,
2. The elevation plan, furniture plan and node section plan sound, pipe wiring, equipment installation, etc. are the responsibility of the
in the decoration area. Construction drawings design notes: professional construction team, not within the scope of this project. The installation
1, size notes to MM as a unit. The site size and drawing shall be carried out in accordance with the requirements and specifications of the fire
size may be different, the construction staff can be in the prevention and power supply departments. (7) all fixed and immovable decorations such as
site under the guidance of construction technicians to fitting rooms and store signs must use decoration materials of grade B1 and above, and
adjust, but if there is a big difference, need to contact wood decoration materials are prohibited. Metal shelves are required for warehouse
with the designer to adjust the design. 2. All elevations shelves. (8) a maintenance opening, a side spray and a heat collecting cover shall be
are based on a relative elevation of + 0.000 m. 3. All the arranged under the fan coil unit. (9) strictly follow the requirements of“Decoration
materials in the drawing are numbered for illustration. The Manual” construction.
material list is attached with other documents. Four,
construction instructions: 1, main material requirements:
(1) Wood: is in line with international standards AA class
products. (2) ceiling material: the ceiling should adopt
1.2 thick S60 upper man keel, the diameter of suspenders is
more than 8mm, the suspenders spacing is less than 800mm,
the suspenders length is more than 1500mm must add reverse
support, the ceiling should be made of 1.2 thick S60 upper
man keel, the suspenders spacing is less than 800mm, the
suspenders length is more than 1500mm must add reverse
support, the space between main keel should be less than
800mm and the space between secondary keel should be less
than 400mm. 500 * 500 service ports should be reserved at
the air-conditioning valve and other places with equipment
for future maintenance. The suspended ceiling should not be
lower than the common area suspended ceiling.