Code/Defects/Deficiencies & Estimated Quantity
Length (km) 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16
a. As No/Faded Road Markings Unmaintained Bridges
Shoving No /
Inspected Unmaintained
Name of Road Sections/Station Limit Alligator Major & Pumping & 06-E 06-C 06-Y 06-P Defects on Lush Open Inadequate 15-D 15-S 15-P Unmaintained
a. Concrete Pothole Clogged Drains Cracks Raveling Signages and
b. As Cracks Scaling Corrugati Depression Pedestrian Shoulders Vegetation Manhole Sealant in Guardrails
Edge Line Center Line Yellow Line Road Markers Bridge Deck Bridge Side Bridge Paint
b. Asphalt Validated on Lane Joints
c. Gravel (sq.m.) (sq.m.) (sq.m.) (sq.m.) (sq.m.) (l.m.) (l.m.) (l.m.) (l.m.) (l.m.) (l.m.) (l.m.) (no.) (l.m.) (l.m.) (sq.m) (no.) (no.) (no.) (no.) (panel)

1. BALINGASAG BY-PASS RD (S00553MN) a. 4.322 a. - - - - - - - - - - - - - - - - - - - - -

K1389+(-810) - K1392+443 b. - b. - - - - - - - - - - - - - - - - - - - - -

L = 4.322 km c. -
BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN
2. CITY RD (S00486MN) a. 1.336 a. - - - - - - - - - - - - - - - - - - - - -

K1280+(-818) - K1280+554 b. 0.036 b. - - - - - - - - - - - - - - - - - - - - -

L = 1.372 km c. -
BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN
3. CITY RD (S00473MN) a. 0.905 a. - - - - - - - - - - 1,000.00 200.00 - - - - - - - - -

K1281+(-170) - K1301+372 b. 19.453 b. - - - - - - - - - - - - - - - - - - - - -

L = 20.358 km c. -
BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN
4. CITY RD (S00564MN) a. 8.837 a. 0.09 - - - - - - - - - - - - - - - - - - - -

K1302+(-600) - K1327+418 b. 17.052 b. - - - - - - - - - - - - - - - - - - - - -

L = 25.889 km c. -
BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN
5. CITY RD (S00476MN) a. 9.929 a. 0.25 - - - - - - - - - - - - 200.00 - - - - - - -

K1329+(-1589) - K1353+903 b. 16.616 b. - - - - - - - - - - - - - - - - - - - - -

L = 26.545 km c. -
BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN
6. CITY RD (S00485MN) a. 31.589 a. 0.48 - - - - - - - - 1,112.00 - - - 200.00 40.00 - 3.00 - - - -

K1355+(-1103) - K1399+378 b. 13.946 b. - - - - - - - - - - - - - - - - - - - - -

L = 45.535 km c. -

DAMPIL-LAGONGLONG BY-PASS RD
7. (S00551MN) a. 0.398 a. - - - - - - - - - - - - - - - - - - - - -

K1381+(-274) - K1381+124 b. - b. - - - - - - - - - - - - - - - - - - - - -

L = 0.398 km c. -
GINGOOG-CLAVERIA-VILLANUEVA RD
8. (S00567MN) a. 23.294 a. - - - - - - - - - 1,200.00 - 1,004.00 - - - - - - - - -

K1316+(-328) - K1342+276 b. 2.249 b. - - - - - - - - - - - - - - - - - - - - -

L = 25.543 km c. -

9. GINGOOG-WHARF RD (S00568MN) a. 0.736 a. - - - - - - - - - - - - - - - - - - - - -

K1315+654 - K1316+390 b. - b. - - - - - - - - - - - - - - - - - - - - -

L = 0.736 km c. -

10. KINOGUITAN BY-PASS RD (S00549MN) a. 0.884 a. - - - - - - - - - - - - - - - - - - - - -

K1361+(-385) - K1361+499 b. - b. - - - - - - - - - - - - - - - - - - - - -

L = 0.884 km c. -

11. LAGONGLONG BY-PASS RD (S00552MN) a. 1.144 a. - - - - - - - - - - - - - - - - - - - - -

K1384+(-337) - K1384+807 b. - b. - - - - - - - - - - - - - - - - - - - - -

L = 1.144 km c. -

Page 1 of 2
SUMMARY
ON ROAD AND BRIDGE INSPECTION
IN THE IMPLEMENTATION OF DEPARTMENT ORDER NO. 189, SERIES OF 2022
Date of Inspection: September 13, 2023
Date of Validation: April 19, 2023
Region: X
District Office: MISAMIS ORIENTAL 1ST DEO DPWH-QMSP-17-07-REV00
Code/Defects/Deficiencies & Estimated Quantity
Length (km) 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16
a. As No/Faded Road Markings Unmaintained Bridges
Shoving No /
Inspected Unmaintained
Name of Road Sections/Station Limit Alligator Major & Pumping & 06-E 06-C 06-Y 06-P Defects on Lush Open Inadequate 15-D 15-S 15-P Unmaintained
a. Concrete Pothole Clogged Drains Cracks Raveling Signages and
b. As Cracks Scaling Corrugati Depression Pedestrian Shoulders Vegetation Manhole Sealant in Guardrails
Edge Line Center Line Yellow Line Road Markers Bridge Deck Bridge Side Bridge Paint
b. Asphalt Validated on Lane Joints
c. Gravel (sq.m.) (sq.m.) (sq.m.) (sq.m.) (sq.m.) (l.m.) (l.m.) (l.m.) (l.m.) (l.m.) (l.m.) (l.m.) (no.) (l.m.) (l.m.) (sq.m) (no.) (no.) (no.) (no.) (panel)

12. LOOC-SALAY BY-PASS RD (S00494MN) a. 0.407 a. - - - - - - - - - - - - - - - - - - - - -

K1378+173 - K1378+580 b. - b. - - - - - - - - - - - - - - - - - - - - -

L = 0.407 km c. -

13. MEDINA BY-PASS RD (S00547MN) a. 5.505 a. - - - - - - - - - - - - - - - - - - - - -

K1329+(-703) - K1333+845 b. 0.079 b. - - - - - - - - - - - - - - - - - - - - -

L = 5.584 km c. -

14. TALISAYAN BY-PASS RD (S00482MN) a. 1.375 a. - - - - - - - - - - - - - - - - - - - - -

K1350+(-467) - K1350+908 b. - b. - - - - - - - - - - - - - - - - - - - - -

L = 1.375 km c. -

a. 90.661 a. 0.82 - - - - - - - - 2,312.00 1,000.00 1,204.00 - 400.00 40.00 - 3.00 - - - -


Total b. 69.431 b. - - - - - - - - - - - - - - - - - - - - -

c. -
Accomplishment (%) - - - - - - - - - - - - - - - - - - - - -

Prepared by:

JOHN LOUIS E. BANAYNAL -


ENGINEER II -

Page 2 of 2