Section (km.75.000 to
km.94.900) of NH-707 in the state of Himachal Pradesh under Green National Highway Corridor Project (GNHCP) with the loan assistance of World Bank .
EPC Contractor :- M/s PRL Projects & Infrastructure Ltd. - Dhatarwal Construction Company Pvt. Ltd. (JV)
ROADS
Carriageway and paved shoulders
Breach or blockade NO NO NA
Pot holes NO NO NA
Removal of debris NO NO NA
Hard/earth shoulders, side slopes, drains and culverts
Desilting of drains in urban/semi-urban areas NO NO NA
Road side furniture including road signs and pavement marking
Rest areas
Cleaning of toilets NO NO NA
Defects in electrical, water and sanitary installations NO NO NA
Toll plaza[s]
Failure of toll collection equipment including ETC or lighting NA NA NA
Other Project Facilities and Approach roads
Damage or deterioration in Approach Roads, [pedestrian facilities, truck
lay-bys, bus-bays, bus- shelters, cattle crossings, Traffic Aid Posts, Medical NO NO NA
Aid Posts and other works]
Project Name:- Engineering, Procurment and Construction of Rehabilitation & Upgradation to Intermediate Lane Configuration of Shri Kyari - Gumma Section (km.75.000 to
km.94.900) of NH-707 in the state of Himachal Pradesh under Green National Highway Corridor Project (GNHCP) with the loan assistance of World Bank .
EPC Contractor :- M/s PRL Projects & Infrastructure Ltd. - Dhatarwal Construction Company Pvt. Ltd. (JV)
Nature of defect/ deficiency Defect found (Yes/No) If defect found, Chainage & Compliance of previous defect AE Remarks
side (Yes/No/NA)
ROADS
(a) Carriageway and paved shoulders
(i) Breach or blockade NO NO NA
(vi) Bleeding/skidding NO NO NA
Nature of defect/ deficiency Defect found (Yes/No) If defect found, Chainage & Compliance of previous defect AE Remarks
side (Yes/No/NA)
(c) Road side furniture including road signs and pavement marking
Nature of defect/ deficiency Defect found (Yes/No) If defect found, Chainage & Compliance of previous defect AE Remarks
side (Yes/No/NA)
(ii) Damage to toll plaza NA NA NA
(h) Other Project Facilities and Approach roads
BRIDGES
(a) Superstructure of bridges
(i) Cracks NO NO NA
(ii) Spalling/scaling NO NO NA
(b) Foundations of bridges
(i) Scouring and /or cavitation NO NO NA
(c) Piers, abutments, return walls and wing walls of bridges
Nature of defect/ deficiency Defect found (Yes/No) If defect found, Chainage & Compliance of previous defect AE Remarks
side (Yes/No/NA)
Roughness value
exceeding
2,500 mm in a
(ii) stretch of 1 km (as
measured by a
standardised rough
meter / bump
integrator)
Rutting exceeding 10
mm in more than 2%
of road surface
(v)
in a stretch of 1 km
(measured with 3 m
straight edge)
(vi) Bleeding/skidding
Ravelling/Sipping of