Yes No N/A
9. Drainage and Slope Protection Schedule
Issue Date: May 2, 2023
Department of Public Works and Highways
BUREAU OF DESIGN Doc. Code: DPWH-BOD-OD-
Quality Management System Manual QMSF-32b
OFFICE OF THE DIRECTOR Revision No.: 1
Design Audit – Highway Project Checklist Page No. 3 of 9
(Road Widening)
Stationing/limits
Size/dimension and type of structures
Quantities
Yes No N/A
Issue Date: May 2, 2023
Department of Public Works and Highways
BUREAU OF DESIGN Doc. Code: DPWH-BOD-OD-
Quality Management System Manual QMSF-32b
OFFICE OF THE DIRECTOR Revision No.: 1
Design Audit – Highway Project Checklist Page No. 4 of 9
(Road Widening)
12 Typical Drainage Details
Standard/special detailed plans for RCPC and Box Culverts
Yes No N/A
Part 3. Accuracy of Design Analysis and Calculations (20%)
Verify if the following are complete, correct, consistent, and in accordance to AASHTO/DPWH
standards, and other referral codes
1 Pavement
Issue Date: May 2, 2023
Department of Public Works and Highways
BUREAU OF DESIGN Doc. Code: DPWH-BOD-OD-
Quality Management System Manual QMSF-32b
OFFICE OF THE DIRECTOR Revision No.: 1
Design Audit – Highway Project Checklist Page No. 8 of 9
(Road Widening)
Pavement design parameters
o Design Traffic Load, CESAL
o Effective Modulus of Subgrade Reaction
o Reliability
o Serviceability
o Flexural Strength
o Compressive Strength
o Load Transfer Coefficient, J
Correctness of the pavement design thickness
determination/computation
Min. PCCP thickness of 280mm for arterial and secondary
national roads and access roads leading to ports, 230mm
for tourism roads
2 Drainage Structures
2.1 Hydrologic Analysis
Design Storm Frequency (Design Return Period)
o Return Period of 15 years for RCPC (Design Capacity)
o Return Period of 25 years for RCPC (Check Capacity)
o Return Period of 25 years for RCBC (Design Capacity)
o Return Period of 50 years for RCBC (Check Capacity)
Run-off Coefficient
Consideration of 10% increase in rainfall intensity
Design Discharge, Q (Rational Method)
2.2 Hydraulic Design
Headwater Computation (RCPC/RCBC)
o Inlet Control, HW/D (RCPC)
o Inlet Control, HW/D (RCBC)
o Outlet Control, HW (RCPC)
o Outlet Control, HW (RCBC)
o Outlet Velocity (RCPC)
o Outlet Velocity (RCBC)
o Velocity limits (m/s) - 0.80 - 5.00
Yes No N/A
Correctness of culvert size
Minimum design requirements
o 0.91m Minimum Diameter of Culvert (RCPC)
o Minimum dimension of 1.25m x 1m and maximum
dimension of 3m x 3m (RCBC)
2.3 Structural Analysis (RCBC only)
Issue Date: May 2, 2023
Department of Public Works and Highways
BUREAU OF DESIGN Doc. Code: DPWH-BOD-OD-
Quality Management System Manual QMSF-32b
OFFICE OF THE DIRECTOR Revision No.: 1
Design Audit – Highway Project Checklist Page No. 9 of 9
(Road Widening)
Results
o Factored Moment
o Factored Shear
Reinforcements
o Main Reinforcements
o Shrinkage and Temperature Reinforcements
Slope Protection Structures (Overall stability and Soil bearing
3
capacity analysis)
Factor of Safety of greater than or equal to 1.50 for
sliding
Factor of Safety of greater than or equal to 3.0 for
overturning
Factor of Safety for bearing capacity greater than or
equal to 3.0
4 Detailed Quantity Calculations consistent with plan
5 Settlement Analysis for High Embankment (3m and above)
Immediate Settlement
Primary Settlement
Secondary Settlement
Settlement Analysis for Slope Protection Structures (i.e.
6
retaining wall, MSE wall, etc.)
mm/dd/yyyy
<NAME> <NAME>
<Designation> <Designation>
Date
Team Member Team Leader