Budgetary Requirement (Construction of MRF)

Qiantity Materials Unit Price Total Price


2 sacks Cement 240 480
1 cubic load Sand 1200 1200
5 pcs Galvanized Iron 300 1500
2 length Round Bar (1/2) 850 1700
2 length flat bar 800 1600
Labor (Welder) 750 1500
Labor (Helper) 400 800
Welding rod 100 200
snacks 200
TOTAL 9,180.00