You are on page 1of 7

A Project Report On

“TITLE OF PROJECT”

TATYASAHEB KORE INSTITUTE OF ENGINEERING AND


TECHNOLOGY, WARANANAGAR
(AN AUTONOMOUS INSTITUTE)
Of

BACHELOR OF ELECTRONICS AND


TELECOMMUNICATION ENGINEERING
By
ABC Seat No.
PQR Seat No.
XYZ Seat No.

UNDER THE GUIDANCE OF


Prof. XXX

DEPARTMENT OF ELECTRONICS ENGINEERING


TATYASAHEB KORE INSTITUTE OF ENGINEERING AND
TECHNOLOGY, WARANANAGAR
Year: 2023-24
SWVSM’S
TATYASAHEB KORE INSTITUTE OF ENGINEERING AND
TECHNOLOGY, WARANANAGAR
DEPARTMENT OF ELECTRONICS AND
TELECOMMUNICATION ENGINEERING

CERTIFICATE
This is to certify that the project work entitled“TITLE OF PROJECT”carried out by

Abc Seat No.


Pqr Seat No
Xyz Seat No.

are bonafidestudents of TKIET Warananagar. Projectwork carried out by them under the
supervision of Prof………………..and it is approved for B.E. (Sem.-I) for the requirement of
Bachelor Degree of Electronics and Telecommunication Engineering, during academic year
2023-24.
Place: Warananagar
Date:

Prof.XXX Prof. C.P.Shinde Dr. S. V. Anekar


Guide H.O.D. Principal

Examiner
Certificate of Industry (if any)
ACKNOWLEDGEMENT

This space is dedicated to acknowledge all those who have helped in bringing this project to
fruition.

We are greatly indebted to my guide Prof. (guide name), for his/her unstinted support and valu-
able suggestions. We are grateful to them not only for the guidance, but also for their unending
patience and keeping our spirits high throughout. We express my sincere thanks to our beloved
Head of the Department, Prof. C.P.Shinde and Principal, Dr. S. V. Anekar for being source of
inspiration and providing us the opportunity to work on this project.

We extent heartfelt thanks to all the teaching and non-teaching staff of the department of Elec-
tronics and Telecommunication engineering of TKIET of their assistance and cooperation.

Finally, we would like to thanks our parent and friends for their moral support and encourage-
ment throughout our academics.

Student Name PRN No. Signature

Mr.

Mr.

Mr.
ABSTRACT

Times New Roman: Text Font 12


LIST OF FIGURES

Fig. No. Figure Name Page No.

On Next Page

LIST OF TABLES

Table. No. Table Name Page No.

On Next Page

NOMENCLATURE

(INCLUDES SYMBOLS, NOTATIONS etc.)


INDEX

CHAPTER NO.TITLE PAGE NO.

1. INTRODUCTION
1.1 BACKGROUND
1.2 MOTIVATION
2. LITERATURE SURVEY
2.1 ……………………
2.2 ……………………
2.3 ……………………
3. BLOCK DIAGRAM DESIGN AND DRAWING
3.1 BLOCK DIAGRAM
3.2 SYSTEM FLOW CHART / ALGORITHM
3.3 WORKING
4. EXPERIMENTATIONS
4.1 SOFTWARE REQUIREMENT
4.2 ……………………
4.3 ……………………
4.4 PROGRAMS
4.5 FLOW CHART / ALGORITHM
4.6 HADWARE REQUIREMENT
4.7 ……………………
4.8 ……………………
4.9 LIST OF COMPONENTS
6. SOFTWARE / HARDWARE RESULTS
7. APPLICATIONS
REFERENCES
DATASHEETS

You might also like