BILL OF QUANTITIES
Bill of Quantities
Contents
Preamble .....................................................................................................................................1
1. GENERAL (applicable to all work) .............................................................................1
1.1 GENERAL .......................................................................................................................1
1.2 STRUCTURE OF THE SCHEDULE .............................................................................1
1.3 DESCRIPTION OF ITEMS IN THE SCHEDULE.........................................................2
1.4 QUANTITIES REFLECTED IN THE SCHEDULE ......................................................2
1.5 PRICING OF THE BILL OF QUANTITIES ..................................................................2
1.6 PROVISIONAL SUMS ...................................................................................................3
1.7 CONTINGENCY .............................................................................................................4
1.8 UNITS OF MEASUREMENT ........................................................................................4
1.9 PAYMENT REFERENCES ............................................................................................4
PREAMBLE
The following criteria are to be followed as set out below, and read together with all parts of this
contract document, which it will be assumed in the Contract, that the Bidder has taken into account
when developing his prices.
inserted by the Bidder in the Bill of Quantities shall be the full inclusive prices to be paid
by the Employer for the work described under the several items. They shall include full
compensation for all costs and expenses that may be required and for the completion of the
work in accordance with the specification, the conditions of contract and the drawings,
carrying out such ancillary and associated activities as the Contractor deems necessary for
the completion of the Works, and maintenance during the Defects Notification Period of
all the work described and as shown on the drawings. They shall also include for all
overheads, profits and incidentals, and the cost of all general risks, liabilities and
obligations set forth or implied in the documents on which the Bid is based.
Provision is not made in the Summary to the Bill of Quantities for VAT to be added.
1.5.3 The unit rates and prices entered in the Bill of Quantities shall be reasonable, as these will
be used as a basis for assessment of payment for additional work that may have to be carried
out.
1.5.4 Each item shall be priced and extended to the "Amount" column by the Bidder, with the
exception of the items for which only rates are required, or items which already have
Provisional Sums affixed thereto. If the Bidder omits to price any items in the Bill of
Quantities, then these items will be considered to have a nil rate or price. A nil rate will
not absolve the Contractor from performing the work specified and will indicate that no
compensation will be due for the work. The “amounts” shall be totaled to the end of the
Section, and these totals shall be carried to the Summary page.
1.5.5 All items for which terminology such as "inclusive" or "not applicable" have been added
by the Bidder, will be regarded as having nil rates, as if the Bidder had omitted to price the
items.
1.5.6 The Bidder shall fill in rates or prices for all items where the words "rate only" appear in
the "Amount" column. "Rate Only" items have been included where:
a) An alternative item or material is contemplated and may be used at the discretion of
the Employer.
b) Variations of specified components in the make-up of a pay item may be expected.
c) No work under the item is foreseen at tender stage but the possibility that such work
may be required is not excluded.
For “Rate Only” items no quantities are given in the "Quantity" column, but the quoted
rate shall apply in the event of work under this item being required. However, the Bidder
must note that in terms of the Bid Data the Bidder may be asked to reconsider any such
rates which the Employer may regard as unbalanced.
1.5.7 All rates, prices and amounts quoted in the Bill of Quantities shall be in Lesotho Loti
(Maloti) and shall include all levies and taxes (other than VAT).
1.6 PROVISIONAL SUMS
Where Provisional Sums are provided for items in the Bill of Quantities, payment for the work
done under such items will be made in accordance with Sub-Clause 13.4 [Provisional Sums] of
the General Conditions, as further expanded and defined in relevant Measurement and Payment
clauses. The Employer reserves the right, during the execution of the Works, to adjust the stated
amounts upwards or downwards according to the work actually done under the item, or the item
referenced, followed by the relevant clause number from that specification. Specifications shall be
read in conjunction with their amendments, and clauses referenced shall correspond to the
specification as amended.
3. Work Items
If BDS-ITB 15.1 (a) applies, Bidders shall price the Bill of Quantities in local currency only and
shall indicate in the Appendix to Bid the percentage expected for payment in foreign currency or
currencies. If BDS-ITB 15.1 (b) applies Bidders shall price the Bill of Quantities in the applicable
currency or currencies.
BILL OF QUANTITIES
SANS GENERAL
1200 A
Ref: LLWDP/W/05
9
BILL 11: PRELIMINARY AND GENERAL:
SECTION PAA - PRELIMINARY AND GENERAL
PS Environmental management
Ref: LLWDP/W/05
10
BILL 11: PRELIMINARY AND GENERAL:
SECTION PAA - PRELIMINARY AND GENERAL
PS Social Management
Ref: LLWDP/W/05
11
BILL 11: PRELIMINARY AND GENERAL:
SECTION PAA - PRELIMINARY AND GENERAL
Ref: LLWDP/W/05
12
BILL 11: PRELIMINARY AND GENERAL:
SECTION PAA - PRELIMINARY AND GENERAL
Ref: LLWDP/W/05
Bill No.11 13
BOQ SUMMARY
LLWDP/W/05
Ref: LLWDP/W/05
14
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBA - PIPELINE EARTHWORKS
Drawing no 1002016-4000-DRG-CC-0901
8.3.2 Excavation
Ref: LLWDP/W/05
15
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBA - PIPELINE EARTHWORKS
Ref: LLWDP/W/05
16
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBA - PIPELINE EARTHWORKS
8.3.6 Finishing
PBA30 g) Kerbing m 80
Ref: LLWDP/W/05
17
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBA - PIPELINE EARTHWORKS
Drawing no 1002016-0100-DRG-CC-0020
8.3.2 Excavation:
Ref: LLWDP/W/05
18
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBA - PIPELINE EARTHWORKS
8.2.1 Rough:
PBA49 8 mm dia t 7
PBA50 12 mm dia t 28
Ref: LLWDP/W/05
19
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBA - PIPELINE EARTHWORKS
Ref: LLWDP/W/05
20
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBA - PIPELINE EARTHWORKS
Ref: LLWDP/W/05
21
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBB - PIPE AND PIPE SPECIALS, VALVES AND METERS
uPVC Class 9:
PBB1 DN 63 m 3 572
PBB2 DN 75 m 39 535
PBB3 DN 90 m 11 089
a) Bends:
Ref: LLWDP/W/05
22
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBB - PIPE AND PIPE SPECIALS, VALVES AND METERS
Ref: LLWDP/W/05
23
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBB - PIPE AND PIPE SPECIALS, VALVES AND METERS
b) Reducers:
Cast iron:
Ref: LLWDP/W/05
24
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBB - PIPE AND PIPE SPECIALS, VALVES AND METERS
c) Tees:
Ref: LLWDP/W/05
25
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBB - PIPE AND PIPE SPECIALS, VALVES AND METERS
PBB109 DN 75 No 4
PBB110 DN 90 No 16
Ref: LLWDP/W/05
26
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBB - PIPE AND PIPE SPECIALS, VALVES AND METERS
PBB111 DN 110 No 6
PBB112 DN 160 No 5
PBB113 DN 200 No 2
PBB114 DN 250 No 1
Steel to uPVC
PBB119 DN 65 No 2
PBB120 DN 75 No 2
PBB121 DN 65 No 15
PBB122 DN 80 No 8
PBB123 DN 100 No 13
PBB124 DN 150 No 2
PBB125 DN 200 No 1
e) End caps:
Ref: LLWDP/W/05
27
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBB - PIPE AND PIPE SPECIALS, VALVES AND METERS
PBB133 DN 65 No 2
PBB134 DN 80 No 2
PBB135 DN 100 No 11
PBB136 DN 150 No 8
Fire Hydrants
Drawing no 1002016-4000-DRG-MM-0211
Ref: LLWDP/W/05
28
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBB - PIPE AND PIPE SPECIALS, VALVES AND METERS
Drawing no 1002016-4000-DRG-MM-0221
Ref: LLWDP/W/05
29
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBB - PIPE AND PIPE SPECIALS, VALVES AND METERS
Drawing no 1002016-4000-DRG-MM-0311
Ref: LLWDP/W/05
30
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBB - PIPE AND PIPE SPECIALS, VALVES AND METERS
Drawing no 1002016-4000-DRG-MM-0301
Ref: LLWDP/W/05
31
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBB - PIPE AND PIPE SPECIALS, VALVES AND METERS
Drawing no 1002016-4000-DRG-MM-0101
Ref: LLWDP/W/05
32
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBB - PIPE AND PIPE SPECIALS, VALVES AND METERS
PBB190 Reinforcement t 2
PBB191 DN 65 No. 2
PBB192 DN 80 No. 2
Ref: LLWDP/W/05
33
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBB - PIPE AND PIPE SPECIALS, VALVES AND METERS
PBB204 DN 75 No. 33
PBB205 DN 90 No. 5
Ref: LLWDP/W/05
34
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBB - PIPE AND PIPE SPECIALS, VALVES AND METERS
8.2.18 Miscellaneous
PBB210 DN 32 No. 16
PBB211 DN 50 No. 5
PBB212 DN 63 No. 51
PBB213 DN 75 No. 32
PBB214 DN 90 No. 56
PBB219 DN 63 No. 75
Ref: LLWDP/W/05
35
BILL 12: HLOTSE DISTRIBUTION:
SECTION PBB - PIPE AND PIPE SPECIALS, VALVES AND METERS
DN 75
DN 90
DN 110
DN 160
Ref: LLWDP/W/05
Bill No.12 36
BOQ SUMMARY
LLWDP/W/05
Ref: LLWDP/W/05
37
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCA - PIPELINE EARTHWORKS
Drawing no 1002016-4000-DRG-CC-0901
8.3.2 Excavation
Ref: LLWDP/W/05
38
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCA - PIPELINE EARTHWORKS
Ref: LLWDP/W/05
39
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCA - PIPELINE EARTHWORKS
8.3.6 Finishing
Drawing no 1002016-0100-DRG-CC-0020
Ref: LLWDP/W/05
40
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCA - PIPELINE EARTHWORKS
8.3.2 Excavation:
8.2.1 Rough:
Ref: LLWDP/W/05
41
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCA - PIPELINE EARTHWORKS
PCA43 8 mm dia t 3
PCA44 12 mm dia t 12
Ref: LLWDP/W/05
42
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCA - PIPELINE EARTHWORKS
Ref: LLWDP/W/05
43
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCB: PIPE AND PIPE SPECIALS, VALVES AND METERS
uPVC Class 9:
PCB1 DN 63 m 16 502
PCB2 DN 75 m 2 405
PCB3 DN 90 m 1 771
a) Bends:
Ref: LLWDP/W/05
44
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCB: PIPE AND PIPE SPECIALS, VALVES AND METERS
Ref: LLWDP/W/05
45
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCB: PIPE AND PIPE SPECIALS, VALVES AND METERS
b) Reducers:
Cast iron:
c) Tees:
Ref: LLWDP/W/05
46
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCB: PIPE AND PIPE SPECIALS, VALVES AND METERS
PCB78 DN 90 No 2
PCB79 DN 110 No 4
PCB80 DN 160 No 9
PCB81 DN 200 No 2
PCB82 DN 250 No 1
Steel to uPVC
Ref: LLWDP/W/05
47
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCB: PIPE AND PIPE SPECIALS, VALVES AND METERS
e) End caps:
PCB94 DN 300 No 1
PCB95 DN 65 No 10
PCB96 DN 80 No 2
PCB97 DN 100 No 4
PCB98 DN 150 No 10
Fire Hydrants
Ref: LLWDP/W/05
48
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCB: PIPE AND PIPE SPECIALS, VALVES AND METERS
Drawing no 1002016-4000-DRG-MM-0211
Drawing no 1002016-4000-DRG-MM-0311
Ref: LLWDP/W/05
49
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCB: PIPE AND PIPE SPECIALS, VALVES AND METERS
Ref: LLWDP/W/05
50
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCB: PIPE AND PIPE SPECIALS, VALVES AND METERS
Drawing no 1002016-4000-DRG-MM-0301
Drawing no 1002016-4000-DRG-MM-0101
Ref: LLWDP/W/05
51
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCB: PIPE AND PIPE SPECIALS, VALVES AND METERS
Ref: LLWDP/W/05
52
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCB: PIPE AND PIPE SPECIALS, VALVES AND METERS
Ref: LLWDP/W/05
53
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCB: PIPE AND PIPE SPECIALS, VALVES AND METERS
Ref: LLWDP/W/05
54
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCB: PIPE AND PIPE SPECIALS, VALVES AND METERS
Ref: LLWDP/W/05
55
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCB: PIPE AND PIPE SPECIALS, VALVES AND METERS
PCB171 Concrete m3 35
PCB172 Formwork m2 20
PCB173 Reinforcement t 14
PCB174 DN 80 No. 12
Ref: LLWDP/W/05
56
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCB: PIPE AND PIPE SPECIALS, VALVES AND METERS
PCB185 DN 63 No. 7
PCB186 DN 75 No. 2
PCB187 DN 90 No. 1
8.2.18 Miscellaneous
Ref: LLWDP/W/05
57
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCB: PIPE AND PIPE SPECIALS, VALVES AND METERS
PCB194 DN 63 No. 39
PCB195 DN 75 No. 26
PCB196 DN 90 No. 19
DN 63
DN 75
Ref: LLWDP/W/05
58
BILL 13: KHANYANE DISTRIBUTION:
SECTION PCB: PIPE AND PIPE SPECIALS, VALVES AND METERS
DN 90
DN 110
DN 160
DN 200
Ref: LLWDP/W/05
Bill No.13 59
BOQ SUMMARY
LLWDP/W/05
Ref: LLWDP/W/05
60
BILL 14: HA LESIAMO DISTRIBUTION:
SECTION PDA - PIPELINE EARTHWORKS
Drawing no 1002016-4000-DRG-CC-0901
8.3.2 Excavation
Ref: LLWDP/W/05
61
BILL 14: HA LESIAMO DISTRIBUTION:
SECTION PDA - PIPELINE EARTHWORKS
PDA16 a) Shoring m 85
8.3.6 Finishing
Ref: LLWDP/W/05
62
BILL 14: HA LESIAMO DISTRIBUTION:
SECTION PDA - PIPELINE EARTHWORKS
Drawing no 1002016-0100-DRG-CC-0020
Ref: LLWDP/W/05
63
BILL 14: HA LESIAMO DISTRIBUTION:
SECTION PDA - PIPELINE EARTHWORKS
8.3.2 Excavation:
PDA37 a) D50 m³ 63
8.2.1 Rough:
Ref: LLWDP/W/05
64
BILL 14: HA LESIAMO DISTRIBUTION:
SECTION PDA - PIPELINE EARTHWORKS
Ref: LLWDP/W/05
65
BILL 14: HA LESIAMO DISTRIBUTION:
SECTION PDA - PIPELINE EARTHWORKS
Ref: LLWDP/W/05
66
BILL 14: HA LESIAMO DISTRIBUTION:
SECTION PDB - PIPES AND PIPE SPECIALS, VALVES AND METERS
uPVC Class 9:
PDB1 DN 63 m 8 450
PDB2 DN 90 m 8 409
a) Bends:
Ref: LLWDP/W/05
67
BILL 14: HA LESIAMO DISTRIBUTION:
SECTION PDB - PIPES AND PIPE SPECIALS, VALVES AND METERS
b) Reducers:
Cast iron:
c) Tees:
PDB35 DN 75 No 4
PDB36 DN 110 No 4
Ref: LLWDP/W/05
68
BILL 14: HA LESIAMO DISTRIBUTION:
SECTION PDB - PIPES AND PIPE SPECIALS, VALVES AND METERS
PDB37 DN 160 No 1
PDB38 DN 200 No 1
Steel to uPVC
e) End caps:
PDB46 DN 65 No 9
Fire Hydrants
Drawing no 1002016-4000-DRG-MM-0211
Ref: LLWDP/W/05
69
BILL 14: HA LESIAMO DISTRIBUTION:
SECTION PDB - PIPES AND PIPE SPECIALS, VALVES AND METERS
Ref: LLWDP/W/05
70
BILL 14: HA LESIAMO DISTRIBUTION:
SECTION PDB - PIPES AND PIPE SPECIALS, VALVES AND METERS
PDB60 Reinforcement t 1
PDB61 DN 65 No. 9
PDB64 DN 90 No. 2
8.2.18 Miscellaneous
Ref: LLWDP/W/05
71
BILL 14: HA LESIAMO DISTRIBUTION:
SECTION PDB - PIPES AND PIPE SPECIALS, VALVES AND METERS
DN 63
DN 90
DN 110
Ref: LLWDP/W/05
Bill No.14 72
BOQ SUMMARY
LLWDP/W/05
Ref: LLWDP/W/05
Volume 2: Bill of Quantities 73
Daywork Schedule
General
1. Reference should be made to Sub-Clause 13.6 of the General Conditions. Work shall not be
executed on a daywork basis except by written order of the Employer. Bidders shall enter basic
rates for daywork items in the Schedules, which rates shall apply to any quantity of daywork
ordered by the Employer. Nominal quantities have been indicated against each item of
daywork, and the extended total for Daywork shall be carried forward as a Provisional Sum to
the Summary Total Bid Amount. Unless otherwise adjusted, payments for daywork shall be
subject to price adjustment in accordance with the provisions in the Conditions of Contract.
Daywork Labour
2. In calculating payments due to the Contractor for the execution of daywork, the hours for
labour will be reckoned from the time of arrival of the labour at the job site to execute the
particular item of daywork to the time of return to the original place of departure but excluding
meal breaks and rest periods. Only the time of classes of labour directly doing work ordered
by the Employer and for which they are competent to perform will be measured. The time of
gangers (charge hands) actually doing work with the gangs will also be measured but not the
time of foremen or other supervisory personnel.
3. The Contractor shall be entitled to payment in respect of the total time that labour is employed
on daywork, calculated at the basic rates entered by the Contractor in the Schedule of
Daywork Rates: 1. Labour, together with an additional percentage payment on basic rates
representing the Contractor’s profit, overheads, etc., as described below:
(a) The basic rates for labour shall cover all direct costs to the Contractor, including (but
not limited to) the amount of wages paid to such labour, transportation time, overtime,
subsistence allowances, and any sums paid to or on behalf of such labour for social
benefits in accordance with Lesotho law. The basic rates will be payable in local
currency only.
(b) The additional percentage payment to be quoted by the bidder and applied to costs
incurred under (a) above shall be deemed to cover the Contractor’s profit, overheads,
superintendence, liabilities, and insurances and allowances to labour, timekeeping, and
clerical and office work, the use of consumable stores, water, lighting, and power; the
use and repair of stagings, scaffolding, workshops, and stores, portable power tools,
manual plant, and tools; supervision by the Contractor’s staff, foremen, and other
supervisory personnel; and charges incidental to the foregoing. Payments under this
item shall be made in the following currency proportions:
Daywork Materials
4. The Contractor shall be entitled to payment in respect of materials used for daywork (except
for materials for which the cost is included in the percentage addition to labour costs as detailed
heretofore), at the basic rates entered by the Contractor in the Schedule of Daywork Rates:
2. Materials, together with an additional percentage payment on the basic rates to cover
overhead charges and profit, as follows:
(a) the basic rates for materials shall be calculated on the basis of the invoiced price,
freight, insurance, handling expenses, damage, losses, etc., and shall provide for
delivery to store for stockpiling at the Site. The basic rates shall be stated in local
currency, but payment will be made in the currency or currencies expended upon
presentation of supporting documentation.
(b) the additional percentage payment shall be quoted by the bidder and applied to the
equivalent local currency payments made under (a) above. Payments under this item
will be made in the following currency proportions:
(c) the cost of hauling materials for use on work ordered to be carried out as daywork from
the store or stockpile on the Site to the place where it is to be used will be paid in
accordance with the terms for Labour and Construction in this schedule.
1
The bidder shall state the percentage in a common foreign currency equivalent required for payment and the
exchange rates and official sources used.
2
The bidder shall state the percentage in a single foreign currency equivalent and the exchange rates and official
sources used.
6. In calculating the payment due to the Contractor for Contractor’s Equipment employed on
daywork, only the actual number of working hours will be eligible for payment, except that
where applicable and agreed with the Employer, the travelling time from the part of the Site
where the Contractor’s Equipment was located when ordered by the Employer to be employed
on daywork and the time for return journey thereto shall be included for payment.
7. The basic rental rates for Contractor’s Equipment employed on daywork shall be stated in local
currency, but payments to the Contractor will be made in currency proportions, as follows:
3
The bidder shall state the percentage in a single foreign currency equivalent and the exchange rates and official
sources used.
Subtotal
D122 Allow percenta of Subtotal for Contractor’s overhead,
profit, etc., in accordance with paragraph 3 (b) above.
Subtotal
Allow percenta of Subtotal for Contractor’s overhead,
profit, etc., in accordance with paragraph 4 (b) above.
Daywork Summary
Amount %
( LSL ) Foreign
1. Total for Daywork: Labour
2. Total for Daywork: Materials
3. Total for Daywork: Contractor’s Equipment
Total for Daywork (Provisional Sum)
GRAND SUMMARY,
Contract Name: CONSTRUCTION OF THE DISTRIBUTION SYSTEMS - HLOTSE,
KHANYANE & HA’LESIAMO
Contract No.:
NCB No: LLWDP/W/05
i) All Provisional Sums are to be expended in whole or in part at the direction and discretion of the Employer
in accordance with Sub-Clauses 13.4 and 13.5 of the General Conditions except with respect to DAAB Fees
and Expenses for which Sub-Clause 13.4 of the Particular Conditions – Part B shall apply.
* For evaluation purposes, Provisional Sum, other than Daywork will be excluded