PVSYST V6.

81 01/06/23 Page 1/5

Grid-Connected System: Simulation parameters


Project : Basildon Rooftop Project-RSM550
Geographical Site Basildon Project Country United Kingdom
Situation Latitude 51.59° N Longitude 0.48° E
Time defined as Legal Time Time zone UT Altitude 0 m
Albedo 0.20
Meteo data: Basildon Project Meteonorm 7.2 (1986-2005), Sat=89% - Synthetic

Simulation variant : Basildon Rooftop Project-RSM550


Simulation date 01/06/23 22h58

Simulation parameters System type No 3D scene defined, no shadings


2 orientations tilts/azimuths 12°/-90° and 12°/90°
Models used Transposition Perez Diffuse Perez, Meteonorm
Horizon Free Horizon
Near Shadings No Shadings
User's needs : Unlimited load (grid)

PV Arrays Characteristics (6 kinds of array defined)


PV module Si-mono Model RSM110-8-550M
Custom parameters definition Manufacturer Risen Energy Co., Ltd
Sub-array "Sub-array #7A" Orientation #1 Tilt/Azimuth 12°/-90°
Number of PV modules In series 20 modules In parallel 72 strings
Total number of PV modules Nb. modules 1440 Unit Nom. Power 550 Wp
Array global power Nominal (STC) 792 kWp At operating cond. 725 kWp (50°C)
Array operating characteristics (50°C) U mpp 577 V I mpp 1258 A
Sub-array "Sub-array #7B" Orientation #2 Tilt/Azimuth 12°/90°
Number of PV modules In series 20 modules In parallel 57 strings
Total number of PV modules Nb. modules 1140 Unit Nom. Power 550 Wp
Array global power Nominal (STC) 627 kWp At operating cond. 574 kWp (50°C)
Array operating characteristics (50°C) U mpp 577 V I mpp 996 A
Sub-array "Sub-array #8" Orientation #1 Tilt/Azimuth 12°/-90°
Number of PV modules In series 20 modules In parallel 48 strings
Total number of PV modules Nb. modules 960 Unit Nom. Power 550 Wp
Array global power Nominal (STC) 528 kWp At operating cond. 483 kWp (50°C)
Array operating characteristics (50°C) U mpp 577 V I mpp 838 A
Sub-array "Sub-array #9" Orientation #2 Tilt/Azimuth 12°/90°
Number of PV modules In series 20 modules In parallel 55 strings
Total number of PV modules Nb. modules 1100 Unit Nom. Power 550 Wp
Array global power Nominal (STC) 605 kWp At operating cond. 554 kWp (50°C)
Array operating characteristics (50°C) U mpp 577 V I mpp 961 A
Sub-array "Sub-array #10" Orientation #1 Tilt/Azimuth 12°/-90°
Number of PV modules In series 20 modules In parallel 52 strings
Total number of PV modules Nb. modules 1040 Unit Nom. Power 550 Wp
Array global power Nominal (STC) 572 kWp At operating cond. 524 kWp (50°C)
Array operating characteristics (50°C) U mpp 577 V I mpp 908 A
Sub-array "Sub-array #11" Orientation #2 Tilt/Azimuth 12°/90°
Number of PV modules In series 20 modules In parallel 58 strings
Total number of PV modules Nb. modules 1160 Unit Nom. Power 550 Wp
Array global power Nominal (STC) 638 kWp At operating cond. 584 kWp (50°C)
Array operating characteristics (50°C) U mpp 577 V I mpp 1013 A
PVSYST V6.81 01/06/23 Page 2/5

Grid-Connected System: Simulation parameters


Total Arrays global power Nominal (STC) 3762 kWp Total 6840 modules
Module area 17872 m² Cell area 16590 m²

Inverter Model Sunny Tripower Core2 prelim


Custom parameters definition Manufacturer SMA
Characteristics Operating Voltage 500-800 V Unit Nom. Power 110 kWac
Sub-array "Sub-array #7A" Nb. of inverters 6 units Total Power 660 kWac
Pnom ratio 1.20
Sub-array "Sub-array #7B" Nb. of inverters 5 units Total Power 550 kWac
Pnom ratio 1.14
Sub-array "Sub-array #8" Nb. of inverters 4 units Total Power 440 kWac
Pnom ratio 1.20
Sub-array "Sub-array #9" Nb. of inverters 5 units Total Power 550 kWac
Pnom ratio 1.10
Sub-array "Sub-array #10" Nb. of inverters 5 units Total Power 550 kWac
Pnom ratio 1.04
Sub-array "Sub-array #11" Nb. of inverters 5 units Total Power 550 kWac
Pnom ratio 1.16
Total Nb. of inverters 30 Total Power 3300 kWac

PV Array loss factors


Thermal Loss factor Uc (const) 25.0 W/m²K Uv (wind) 0.0 W/m²K / m/s
Wiring Ohmic Loss Array#1 7.5 mOhm Loss Fraction 1.5 % at STC
Array#2 9.5 mOhm Loss Fraction 1.5 % at STC
Array#3 11 mOhm Loss Fraction 1.5 % at STC
Array#4 9.8 mOhm Loss Fraction 1.5 % at STC
Array#5 10 mOhm Loss Fraction 1.5 % at STC
Array#6 9.3 mOhm Loss Fraction 1.5 % at STC
Global Loss Fraction 1.5 % at STC
Serie Diode Loss Voltage Drop 0.7 V Loss Fraction 0.1 % at STC
LID - Light Induced Degradation Loss Fraction 2.0 %
Module Quality Loss Loss Fraction -0.8 %
Module Mismatch Losses Loss Fraction 1.0 % at MPP
Strings Mismatch loss Loss Fraction 0.10 %
Incidence effect, ASHRAE parametrization IAM = 1 - bo (1/cos i - 1) bo Param. 0.05
PVSYST V6.81 01/06/23 Page 3/5

Grid-Connected System: Main results


Project : Basildon Rooftop Project-RSM550
Simulation variant : Basildon Rooftop Project-RSM550
Main system parameters System type No 3D scene defined, no shadings
PV Field Orientation 2 orientations Tilt/Azimuth = 12°/-90° and 12°/90°
PV modules Model RSM110-8-550M Pnom 550 Wp
PV Array Nb. of modules 6840 Pnom total 3762 kWp
Inverter Model Sunny Tripower Core2 prelim 110 kW ac
Inverter pack Nb. of units 30.0 Pnom total 3300 kW ac
User's needs Unlimited load (grid)

Main simulation results


System Production Produced Energy 3370 MWh/year Specific prod. 896 kWh/kWp/year
Performance Ratio PR 91.42 %

Normalized productions (per installed kWp): Nominal power 3762 kWp Performance Ratio PR

6 1.0
Lc : Collection Loss (PV-array losses) 0.17 kWh/kWp/day PR : Performance Ratio (Yf / Yr) : 0.914
0.9
Ls : System Loss (inverter, ...) 0.06 kWh/kWp/day
5 Yf : Produced useful energy (inverter output) 2.45 kWh/kWp/day
0.8
[kWh/kWp/day]

0.7
4
Performance Ratio PR

0.6
Energy

3 0.5

0.4
Normalized

2
0.3

0.2
1

0.1

0 0.0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Basildon Rooftop Project-RSM550


Balances and main results

GlobHor DiffHor T_Amb GlobInc GlobEff EArray E_Grid PR


kWh/m² kWh/m² °C kWh/m² kWh/m² MWh MWh
January 21.5 14.02 5.33 21.3 20.5 76.5 73.3 0.916
February 32.7 20.07 5.36 32.3 31.5 117.6 113.8 0.936
March 70.7 42.30 7.31 69.9 68.4 253.2 247.0 0.939
April 117.0 56.18 9.99 116.0 113.9 414.8 406.0 0.931
May 141.1 77.37 13.51 139.4 136.9 490.4 480.6 0.916
June 148.3 80.43 16.55 146.9 144.2 510.2 499.9 0.905
July 150.0 81.14 18.37 148.3 145.7 511.7 501.3 0.898
August 122.2 73.73 18.30 120.8 118.5 418.7 410.5 0.903
September 87.9 46.53 15.27 87.2 85.5 306.5 300.4 0.915
October 53.5 29.27 12.14 53.0 51.7 188.1 183.4 0.920
November 28.4 18.70 8.14 28.2 27.2 100.8 97.5 0.920
December 16.9 10.72 5.50 16.7 16.0 59.3 56.4 0.900
Year 990.1 550.46 11.35 979.9 960.0 3447.8 3370.1 0.914

Legends: GlobHor Horizontal global irradiation GlobEff Effective Global, corr. for IAM and shadings
DiffHor Horizontal diffuse irradiation EArray Effective energy at the output of the array
T_Amb Ambient Temperature E_Grid Energy injected into grid
GlobInc Global incident in coll. plane PR Performance Ratio
PVSYST V6.81 01/06/23 Page 4/5

Grid-Connected System: Loss diagram


Project : Basildon Rooftop Project-RSM550
Simulation variant : Basildon Rooftop Project-RSM550
Main system parameters System type No 3D scene defined, no shadings
PV Field Orientation 2 orientations Tilt/Azimuth = 12°/-90° and 12°/90°
PV modules Model RSM110-8-550M Pnom 550 Wp
PV Array Nb. of modules 6840 Pnom total 3762 kWp
Inverter Model Sunny Tripower Core2 prelim 110 kW ac
Inverter pack Nb. of units 30.0 Pnom total 3300 kW ac
User's needs Unlimited load (grid)

Loss diagram over the whole year

990 kWh/m² Horizontal global irradiation

-1.0% Global incident in coll. plane


-2.0% IAM factor on global

960 kWh/m² * 17872 m² coll. Effective irradiation on collectors

efficiency at STC = 21.07% PV conversion

3615 MWh Array nominal energy (at STC effic.)


-0.6% PV loss due to irradiance level
-1.0% PV loss due to temperature
+0.7% Module quality loss

-2.0% LID - Light induced degradation


-1.1% Mismatch loss, modules and strings
-0.8% Ohmic wiring loss
3448 MWh Array virtual energy at MPP

-2.2% Inverter Loss during operation (efficiency)


0.0% Inverter Loss over nominal inv. power
0.0% Inverter Loss due to max. input current
0.0% Inverter Loss over nominal inv. voltage
0.0% Inverter Loss due to power threshold
0.0% Inverter Loss due to voltage threshold
0.0% Night consumption
3370 MWh Available Energy at Inverter Output
3370 MWh Energy injected into grid
PVSYST V6.81 01/06/23 Page 5/5

Grid-Connected System: P50 - P90 evaluation


Project : Basildon Rooftop Project-RSM550
Simulation variant : Basildon Rooftop Project-RSM550
Main system parameters System type No 3D scene defined, no shadings
PV Field Orientation 2 orientations Tilt/Azimuth = 12°/-90° and 12°/90°
PV modules Model RSM110-8-550M Pnom 550 Wp
PV Array Nb. of modules 6840 Pnom total 3762 kWp
Inverter Model Sunny Tripower Core2 prelim 110 kW ac
Inverter pack Nb. of units 30.0 Pnom total 3300 kW ac
User's needs Unlimited load (grid)

Evaluation of the Production probability forecast


The probability distribution of the system production forecast for different years is mainly dependent
on the meteo data used for the simulation, and depends on the following choices:
Meteo data source Meteonorm 7.2 (1986-2005), Sat=89%
Meteo data Kind Specific year Year Synthetic
Specified Deviation Year deviation from average 2.0 %
Year-to-year variability Variance 0.5 %

The probability distribution variance is also depending on some system parameters uncertainties
Specified Deviation PV module modelling/parameters 1.0 %
Inverter efficiency uncertainty 0.5 %
Soiling and mismatch uncertainties 1.0 %
Degradation uncertainty 1.0 %
Global variability (meteo + system) Variance 1.9 % (quadratic sum)

Annual production probability Variability 62 MWh


P50 3303 MWh
P90 3223 MWh
P95 3201 MWh

Probability distribution

0.50

0.45
P50 = 3302726 kWh
0.40

0.35

0.30
Probability

0.25
E_Grid simul =
0.20 3370128 kWh
P90 = 3223026 kWh
0.15

0.10 P95 = 3200601 kWh

0.05

0.00
3100000 3150000 3200000 3250000 3300000 3350000 3400000 3450000 3500000
E_Grid system production kWh