You are on page 1of 1

A B C D E F G H J K L M N P Q R

HEAT EXCHANGER PRESSURIZATION UNIT


KEY PLAN
HEAT EXCHANGER DETAILS GENERAL
A B MODEL : TB-10 BFG ARRANGEMENT : 1 DUTY + 1 STANDBY
MAKE : ALFA LAVAL CAPACITY : 2 LPS @ 165 KPA HEAD
UNIT REF. : HEX-1 MAKE :

PUMP ROOM
VACUUM PLANT ROOM

GAS MANIFOLD ROOM


COMPRESSED AIR &
B

MEDICAL
WASTE
ROOM

TOILET

STORE
SOILED HOLDING
11

FEMALE STAFF
11

BMS ROOM

STAFF
CHANGING

CHANGING

RESUSCITATION

RESUSCITATION
PROCEDURE

ROOM CRITICAL

ROOM CRITICAL
ROOM

ROOM
TOILET

PLASTER ROOM

ROOM-02
ROOM

ROOM-03

ROOM-03
MALE

TRIAGE

TRIAGE
ROOM-01
CORRIDOR
CORRIDOR

HORIZONTAL MULTISTAGE PUMPS

COMMUNICATION
DISPOSAL

CLEAN
ROOM

HOLDING
JANITOR

ENTRANCE
SOILED
UTILITY

ROOM

ELECTRICAL
ROOM

ROOM

STATION
+ RECEPTION
STAFF WAITING

ENTRANCE

AMBULANCE
SHELTER
AREA

HALL
NURSING
SURGERY
MINOR

FEMALE
TOILET

TOILET
SN

SN

MALE
CORRIDOR

OBSERVATION
ROOM

JAN.
ISOLATION
SURGERY

TOILET
INSTRUM.
PREP.

MINOR

ROOM
CAPACITY (TR)

CORRIDOR

ROOM-07
EXAM
TOILET
CONTROL
ROOM
CT

CT SCAN

NURSE
HEAD OF

ROOM-06
EXAM
CH.& W.C.
: 200

PANORAMIC
X-RAY

CSSD-01

OFFICE

OFFICE
STAFF

STAFF

ROOM-05
HEALTH
PUBLIC

EXAM
DENTAL
TYPE

ULTRASOUND

CSSD-02

CLINIC 1

ROOM-02
RECEPTION

CLINIC 3

ROOM-04
EXAM

EXAM
CORRIDOR

CORRIDOR

CORRIDOR
STORE

TECHINICAL
ROOM

CLINIC 2

CLINIC 4
EQUIPMENT
MEDICAL

ROOM-01
EXAM

ROOM-03
EXAM
CONTROL
ALCOVE

CONTROL
ALCOVE

VITAL
X-RAY

X-RAY

DENTAL CLINIC

DENTAL CLINIC
WAITING
DISPOSABLE

AREA

CORRIDOR
STORE

VITAL
up
LIFT
CORRIDOR

WAITING
FEMALE

AREA
PH THERAPY

PH THERAPY
(FEMALE)-01

(FEMALE)-01
HANDICAPPED

STORE
TOILETS

CHANGING
ROOM
BLOOD

TOILET
TOILETS
MALE

THERAPY

MEDICAL RECORD
ELECTRONICS
PH ROOM

RECEPTION
FILING & IT

ENTRANCE
LOBBY
PRAYER ROOM

STAFF REST AREA


MALE
: WITH CLASS F INSULATION

TOILET
CORRIDOR

PH THERAPY

CHANGING
PH THERAPY
(MALE)-01

(MALE)-01

ROOM
ROOM

COMMUNICATION
FEMALE
PRAYER

ROOM
TRANSFORMER ROOM
CORRIDOR

AREA
HV ROOM

MALE
WAITING
FEMALE
TOILETS

ELECTRICAL

MEDICAL

PHARMACY
STORE
HANDICAPPED

ROOM
TOILETS

TOILETS

TOILETS
FEMALE
STAFF

STAFF
MALE

COFFEE
COUNTER
LV ROOM
GENERATOR ROOM

ETS ROOM
DESIGN PRESSURE : 16 BAR

GUARD ROOM

SECURITY ROOM
TOILET
MODEL : CMI 8-15
PRESSURE DROP (kPa) : 69.9
ELECTRIC MOTOR DETAILS
COLD SIDE (PRIMARY) TEMP. (°C)
: 4.4/13.3 MOTOR RATING :
(IN/OUT) : 0.75 KW FOR EACH MOTOR
2 2 2900 (2 POLE)
3/4"Ø
HOT SIDE (SECONDARY) TEMP. (°C) RPM OF MOTOR :
CBFV -1,2 TT PI : 14.4/5.6

30
5"Ø (IN/OUT)
EXPANSION TANK MOTOR INSULATION CLASS : CLASS ‘F’

60
5"Ø CHW S/R 2"Ø Ø75cm
FROM / TO BFV BFV 128 CHWP-1 - TWIN PUMP (1 No) N
PROTECTION CLASS : IP 55

43
10 PRIMARY CHWP
5"Ø
PI TT AAV WM 10
GENERAL POWER SUPPLY : 50 HZ / 1Ø / 220 V
NOTES:

PRESSURIZATION UNIT
48
BFV STR CAPACITY OF EACH PUMP : 300 USGPM @ 130 FEET HEAD STARTING
FM : DOL STARTER
25 32 65 141 5"Ø MAKE : 1. ALL DIMENSIONS ARE IN cm UNLESS OTHERWISE SPECIFIED.

52.5
T P
TT AAV HEAT EXCHANGER MATERIALS OF CONSTRUCTION
(200TR)
A TWIN PUMP INLINE VERTICAL SPLIT 2. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH THE RELEVANT
BFV BFV8 TYPE CASING : : STAINLESS STEEL (SS 304).
BFV7 : COUPLED PUMPS ARCHITECTURAL, STRUCTURAL AND OTHER SERVICES DRAWINGS AND
(NC) 86.5 ALL RELEVANT SECTIONS OF THE SPECIFICATIONS.
BYPASS LINE
SERIES : : 4312 IMPELLER : : STAINLESS STEEL (SS 304).

BREAK TANK
100
5"Ø

LEGENDS & ABBREVATIONS:

50 L
PUMP MODEL : 8020-015.0 SHAFT : : STAINLESS STEEL (SS 304).
400

P
40 MM (SUCTION) X 40 MM -
9 A PUMP SUCTION & DISCHARGE : SUPPLY CHILLED WATER PIPE 9
(DISCHARGE) -
RETURN CHILLED WATER PIPE
CHWP-1 CHWP-2 5"Ø ELECTRIC MOTOR DETAILS - FLOW INDICATOR
PRESSURE VESSEL -
15 kW FOR EACH MOTOR –(IE-3) DRV DOUBLE REGULATING VALVE
MOTOR RATING : : -
MODEL : WFPV750V10BR STR STRAINER

FCU-2
P
MOTOR INSULATION CLASS: BFV - BUTTERFLY VALVE
: CLASS ‘F’
STR VOLUME (Lts) : 750 CBFV - CONTROL BUTTERFLY VALVE
BFV5 NRV - NON RETURN VALVE
PRECHARGED PRESSURE(BAR)

174
PROTECTION CLASS : : IP 55 : 4
T - TEMPARATURE GAUGE
BFV6 50HZ / 3PH / 400 V CONNECTION (INCHES)
3/4"Ø POWER SUPPLY : : 2" TT - TEMPARATURE TRANSMITTER

3/4"Ø
DIAMETER ‘D’(mm) : 740 FM - FLOW METER
FCU-1 PLC
8 8
CHEMICAL MATERIALS OF CONSTRUCTION FOR PUMP HEIGHT ‘H’ (mm) : 1920 P - PRESSURE GAUGE
T DOSING POT
PT - PRESSURE TRANSMITTER
CASING : CAST IRON MEMBRANE EPDM
1 5"Ø 5"Ø
1 GUNMETAL BRONZE (BS1400 LG2C)
AAV -
-
AUTOMATIC AIR VENT
IMPELLER : FANCOIL UNIT DC DRAIN COCK
DPIS- DIFFERENTIAL PRESSURE INDICATOR SWITCH
60 STAINLESS STEEL (SS-316) -
B SHAFT : FAN COIL UNIT SCHEDULE ETS ENERGY TRANSFER STATION
FM - FLOW METER
PUMP CASING WORKING PRESSURE : 16 BAR UNIT REF. : FCU-1 FCU-2 EIT - ENERGY INDICATOR TRANSMITTER
HEX - HEAT EXCHANGER
: 80MM X 80MM (PN FLANGE RATING MODEL : RAC12 GCC DCC 16 IV - ISOLATION VALVE
250 120 407 SUCTION AND DISCHARGE SIZE -
16 BAR) PS PRESSURE SENSOR
BTP - BINARY TEST POINT
NO. OF UNITS : 1 1
DOSING POTS NC - NORMALLY CLOSED
7 7
PROVISION FOR CHILLER BFV3
CAPACITY (CFM) : 1080 1300 M - MOTOR
CONNECTION IN CASE OF (NC)
REFERENCE : DOSING POT MCC - MOTOR CONTROL CENTER
EMERGENCY BFV2
ON COIL TEMP. DB (°F) : 75.2 75.2 PLC - PROGRAMMABLE LOGIC CONTROLLER
BFV4 CAPACITY : - 5 Ltrs (1.32 gal)
VFD - VARIABLE FREQUENCY DRIVE
(NC) ON COIL TEMP. WB (°F) : 62.6 62.6
WORKING WT. : - 42 lb (19 Kg) DPT - DIFFERENTIAL PRESSURE TRANSMITTER
BFV1 SENSIBLE CAPACITY (MBH)
(NC) : 25.4 26.5
: - M.S. WELDED BODY WITH M.S.
CONSTRUCTION TOTAL CAPACITY (MBH)
VALVES : 35.6 30.7
MAX. WORKING PRESSURE : - 13.8 Bar CHW FLOW (GPM)
5"Ø CHW S/R : 4.5 3.8
TO / FROM 780
BUILDINGS MAX. TEMPERATURE : - 130 °C FAN MOTOR POWER (kW) : 0.55 0.55
6
1
ETS LAYOUT CEILING 6
Scale: 1:30 : CEILING
UNIT DESCRIPTION SUSPENDED
A B SUSPENDED TYPE
DUCTED TYPE
PRE- FILTER : YES YES

01 COMMENTS INCORPORATED 05/20


SEQUENCE OF OPERATION FOR 00 CONSTRUCTION DOCUMENT 04/20
A B 2 1 EMERGENCY CHILLER REV
Description DATE DRAWN CHK
NO.
1. DURING NORMAL OPERATION BFV 1, 3, 4 & 7
SHALL REMAIN CLOSED. ALL OTHER BFV VALVES PURPOSE OF ISSUE DESIGN STAGE
5 5
SHALL REMAIN OPEN TYPE OF DOCUMENTS CONSTRUCTION DOCUMENT
2. DURING EMERGENCY OPERATION WE HAVE TWO
OPTIONS: CLIENT
a. USING ETS SECONDARY PUMPS: COMMAND OF MILITARY WORKS
IF IT IS POSSIBLE TO RUN ETS SECONDARY P.O.Box...............Abu Dhabi
CHW PUMPS, CHILLER IN & OUT CAN BE United Arab Emirates
CONNECTED TO BFV3 & 1 RESPECTIVELY. BFV Tel.....................
2 SHALL REMAIN CLOSED. HEX CAN BE Fax No: .....................
ISOLATED BY OPENING BF7 IN THE BYPASS
MAIN CONTRACTOR:
LINE AND CLOSING BFV8. PUMPS WILL BE
4 CONTROLLED THROUGH ETS PLC. FORCE 10 4
FCU-2 FCU-1 UNITED ARAB EMIRATES L.L.C

b. USING EMERGENCY CHILLER & PUMP:


120 25 IF IT IS NOT POSSIBLE RUN ETS PUMPS, HVAC CONTRACTOR:
HEAT EXCHANGER EMRGENCY CHILLER AND PUMP IN & OUT CAN
(200TR) 60
AAV
25 CBFV -1 BFV8 BE CONNECTED TO BFV4 & 1 RESPECTIVELY.
TT PI AAV AAV
BFV8 STRAINER
5"Ø 4"Ø 5"Ø 5"Ø 5"Ø BFV 2 SHALL REMAIN CLOSED. ENTIRE ETS
CAN BE ISOLATED BY CLOSING BFV5 & 6. DRAWING TITLE:
340

340
BFV BFV
BFV 22.5 EMERGENCY PUMPS CAN BE CONTROLLED
BFV
3"Ø BFV7 BFV5 THROUGH CHILLER CONTROLER. ETS
CHWP-1&2
HEAT (NC) LAYOUT
3 CBFV -2 EXCHANGER 3

BYPASS LINE
192.36
133.8

(200TR)

5"Ø
PI TT STRAINER
5"Ø
5"Ø DESIGNER /
183.5
5"Ø
FM REVIEWER (2) REVIEWER (3)
TT REVIEWER (1)
BFV
65 BFV EXPANSION TANK 5"Ø
P T BFV P P BFV6
BREAK TANK
5"Ø
5"Ø
90
183.5

29.7

29.7
49.7

DC DC DC 5"Ø
90

49.7
DRAUGHTSMAN DATE SCALE
5"Ø
20

PROVISION FOR CHILLER 04/20 1:30


CONNECTION IN CASE OF
EMERGENCY APPROVED BY:-
2 2
HEAD OF SECTION / DEPT.
120

150

150
BFV3 BFV1
(NC) (NC)

5"Ø CHW S/R 5"Ø CHW S/R

BFV2
FROM / TO ALUMINUM TO / FROM
PRIMARY CHWP LADDER BUILDINGS
DC
SUMP PIT 300x300x200
PROJECT NO. CAMP ID FACILITY CODE
1 1
2
SECTION AA SECTION BB 19019 141248 1409
Scale: 1:30
3 Scale: 1:30 SUMP PIT 300x300x200
DRAWING NO. REVISION No.
CMW-19019-C001- 04-M-2001 01
CMW-D005-DWG-Rev01-111127 ISO 9001-2008 ALL RIGHTS RESERVED. NO PART OF THIS DRAWING MAY BE REPRODUCED OR TRANSMITTED IN ANY MEANS WITHOUT WRITTEN PERMISSION OF THE COPYRIGHT HOLDER