Implementing Agencies: Communication and Works Department, Government of Khyber Pakhtunkhwa, Islamic Republic of Pakistan
Public Disclosure Authorized
Key Dates
Has the Project Development Objective been changed since Board Approval of the Project Objective?
No
Components Table
Name
Component 1. Safe and climate resilient access:(Cost $284.00 M)
Component 2. Safe and affordable school journeys for girls:(Cost $14.00 M)
Component 3. Project management and institutional strengthening:(Cost $12.00 M)
Component 4. Contingent Emergency Response
Overall Ratings
KPRAP project was approved by the Board on June 9, 2022. The financial agreement signing, including the internal clearances are in progress. The
recent floods have impacted rural roads in the province. Due to flood emergency in the province, a package of rural roads for reconstruction have
been identified considering the accessibility and connectivity. The Government of KP is making progress in project implementation on: the selection
of the engineering firm for the preparation of the designs and bidding documents and the staffing of the Project Implementation Unit (PIU).
9/29/2022 Page 1 of 7
The World Bank Implementation Status & Results Report
Khyber Pakhtunkhwa Rural Accessibility Project (KPRAP) (P177069)
Risks
Results
Access to schools
IN01192097
►Travel time savings for rural population to access nearest school in selected districts (Number, Custom)
IN01192099
►Travel time savings for rural population to access nearest health facility in selected districts (Number, Custom)
9/29/2022 Page 2 of 7
The World Bank Implementation Status & Results Report
Khyber Pakhtunkhwa Rural Accessibility Project (KPRAP) (P177069)
Access to markets
IN01192098
►Travel time savings for rural population to access nearest market in selected districts (Number, Custom)
The indicator measures the variation in the perception of quality of service and safety of the trips taken by
Comments:
users and operators, disaggregated by gender.
No changes in indicators. The project has yet to commence. Hiring of PIU staff and Design and Supervision firm is in progress.
IN01192111
►Rural roads upgraded / rehabilitated with climate resilient and road safety measures (Kilometers, Custom)
The indicator measures the total number kilometers (km) of roads improved (rehabilitated and maintained)
Comments:
in selected districts
IN01192114
►Resilience considerations adopted in road selection, designs and work (Yes/No, Custom)
9/29/2022 Page 3 of 7
The World Bank Implementation Status & Results Report
Khyber Pakhtunkhwa Rural Accessibility Project (KPRAP) (P177069)
Value No -- No Yes
The indicator measures the incorporation of resilience considerations for the identification, selection of
Comments:
districts, roads, and the implementation of works (design, rehabilitation and maintenance).
IN01192117
►Project beneficiaries with improved climate resilient road access to schools, health facilities and markets in priority districts (gender
disaggregated) (Number, Custom)
The indicator measures the potential number of people that will benefit from the improved rural roads in
Comments:
the selected districts, disaggregated by gender
IN01192120
►Female participation in labor force for works or complementary activities in the project (Percentage, Custom)
Comments: Proportion of women in the labor force for works and complementary activities undertaken in the project.
IN01192112
►Attendance rate for girls receiving subsidized transport (Percentage, Custom)
Comments: This indicator measures the attendance rates for girls receiving subsidized transport.
IN01192115
►Number of girls receiving subsidized transport per year (Number, Custom)
Comments: The indicator measures the number of girls receiving subsidized transport to school per year.
IN01192118
9/29/2022 Page 4 of 7
The World Bank Implementation Status & Results Report
Khyber Pakhtunkhwa Rural Accessibility Project (KPRAP) (P177069)
►Number of girls receiving subsidized transport per year, that were initially out of school (Number, Custom)
This indicator measures the number of girls receiving subsidized transport to school, that were initially out
Comments:
of school.
IN01192121
►Standard contract developed for signing between PTCs, PIU-CWD and transport service providers (Yes/No, Custom)
Value No -- No Yes
This indicator tracks whether the base contract(s) for the subsidized transport provision have been
Comments:
developed for use by the PIU and PTCs to engage transport service providers.
IN01192122
►Detailed study done to identify beneficiaries for Component 2 (Yes/No, Custom)
Value No -- No Yes
This indicator tracks whether the detailed study to identify beneficiaries for the subsidized transport
Comments:
provision has been done
IN01192113
►Feedback from stakeholder incorporated in project implementation (Percentage, Custom)
Value No -- No Yes
9/29/2022 Page 5 of 7
The World Bank Implementation Status & Results Report
Khyber Pakhtunkhwa Rural Accessibility Project (KPRAP) (P177069)
allocation of resources for rural roads in KP. The system could comprise a combination of software,
analytical tools, processes, together with appropriate training/capacity building.
IN01192119
►Tool built to facilitate resource allocation for the construction of schools, based on geospatial analyses (Yes/No, Custom)
Value No -- No Yes
This indicator tracks whether CWD/E&SED adopts geo-spatial analyses to factor in accessibility
Comments:
considerations for the selection of school construction sites.
Performance-Based Conditions
Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed
Not
P177069 IDA-71430 USD 300.00 300.00 0.00 0.00 286.67 0%
Effective
Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date
Not
P177069 IDA-71430 09-Jun-2022 -- -- 30-Jun-2027 30-Jun-2027
Effective
Cumulative Disbursements
9/29/2022 Page 6 of 7
The World Bank Implementation Status & Results Report
Khyber Pakhtunkhwa Rural Accessibility Project (KPRAP) (P177069)
Restructuring History
Related Project(s)