You are on page 1of 6

New /

Worksheet
Update/ Old DT Survey Attributes Old Data Type Old LOVs
Name
Delete

Sub Division Code ,


DT Survey Update Final Code for Pole Text Sub station , feeder &
DT Name

DT Survey Update Number of Consumer Number

No of Power Cable from LT


DT Survey Update
Bushing to Fuse Unit

DT Survey Update Availability of GO/AB Switch Dropdown Yes,No

DT Survey New
10kVA,16kVA,25kVA,4
0kVA,63kVA,100kVA,1
DT Survey Update DT Rating (KVA) Dropdown 50kVA,200kVA,250kV
A,315kVA,400kVA,500
kVA,630kVA,Others

Feeder Meter CT Ratio


Feeder Survey Update Text
(Nameplate)

Feeder Meter PT Ratio


Feeder Survey Update Text
(Nameplate)

Feeder Survey Update Feeder Type Dropdown Incoming,Outgoing

Feeder Survey Update Feeder Meter Make


Feeder Survey Update Feeder Meter Serial No

Feeder Survey Update Feeder Meter Condition

Feeder Survey Update Feeder Meter Reading

Feeder Meter Photo with


Feeder Survey Update
Meter Reading

Feeder Survey Update External CT Ratio Text


Feeder Survey Update External MF
Feeder Survey Update External CTPT Meter Make
External CTPT Meter Serial
Feeder Survey Update
No
External CTPT Meter
Feeder Survey Update
Condition
External CTPT Meter
Feeder Survey Update
Reading

Feeder Survey Update External CTPT Meter Ratio Dropdown -/1A,-/5A,

Feeder Survey New

Feeder Survey New

Feeder Survey New


Revised
Old Remark Revised Survey Attributes Revised LOVs
Data Type

Need to Join Sub Division


Code (064) , Sub
station(05) , feeder (007) Sub
and DT (0120) as Final Divison_Code ,surveye
Code = 064050070120 . Final Code for Pole Text d_substation_code ,
This code surveyed_feeder_cod
(064050070120) will be e & surveyed_dt_code
printed in this column
and will be disabled.

Number of Consumer Dropdown 1, 2, >2


No of Power Cable circuit
from LT Bushing to Fuse
Unit

DT Rating Visibility Dropdown Visible, Not Visible


10kVA,16kVA,25kVA,4
0kVA,63kVA,100kVA,1
DT Rating (KVA) Dropdown 50kVA,200kVA,250kV
A,315kVA,400kVA,500
kVA,630kVA,Others

Feeder/VCB Meter CT Ratio -/5A, 100/5, 200/5,


Dropdown
(Nameplate) 400/5, 600/5
11KV/110V,
Feeder/VCB Meter PT Ratio
Dropdown 33KV/110V, 3X63.5V,
(Nameplate)
-110V

Incoming,Outgoing,
Spare,
Buscoupler PTR-
Incomer
Feeder/VCB Mete Make
Feeder/VCB Meter Serial
No
Feeder/VCB Meter
Condition

Feeder/VCB Meter Reading

Feeder/VCB Meter Photo


with Meter Reading
30/5,50/5,100/5,
MU CT Ratio Dropdown
200/5, 400/5, 600/5
MU metering system MF
MU Meter make
MU Meter serial no.

MU Meter condition

MU Meter Reading

-/1A,-/5A, 100/5A,
MU Meter CT Ratio Dropdown 200/5A,
300/5A, 600/5A
Incomer-1, Incomer-2,
Parent incomer Dropdown Incomer-3, Not
applicable

11KV/110V, 33KV/110V,
MU Meter PT Ratio Dropdown 3X63.5V,
-110V
Feeder/VCB Metering system
MF Dropdown
Revised Remark

Need to Join Sub Divison Code (012),


surveyed_substation_code (04),
surveyed_feeder_code (123) and
surveyed_dt_code (567) as Final Code
for Pole = 01204123567. This code
(01204123567) will be printed in this
column and will be disabled. No body
can change in field.

If "Availability of GO/AB Switch =Yes",


then "Status of GO/AB Switch"
column should be visible else hide the
column. This is to be implemented.

If "DT Rating Visiblility=Visible", make it


visible "DT Rating (KVA)" else hide. This
is to be implemented.
New column to be added after Surveyed
Feeder Name

New column to be added after


MU Meter CT Ratio

New column to be added after


Feeder/VCB CT ratio