Professional Documents
Culture Documents
Code : FM-RNI-04-04
KEY PERFORMANCE MEASURES (KPM) Rev. No. : 0
January February March April May June July August September October November December Summary
Deliverables
Statistics % Grade Statistics % Grade Statistics % Grade Statistics % Grade Statistics % Grade Statistics % Grade Statistics % Grade Statistics % Grade Statistics % Grade Statistics % Grade Statistics % Grade Statistics % Grade Percent Share Ave. Grade Equivalent Grade ACTUAL PERF.
of Process (1 to 5)
#REF! #REF!
Prepared by:
IMMEDIATE SUPERIOR
KEY PERFORMANCE MEASURES (KPM) MONTHLY REPORT - COST ENGINEER (CO) BASED
Project Name:
To : Date
From : Per
NOTES: 1) If the KPM or KPI is not applicable, do not delete the cell/row, put "N/A' or c/o "CO or CEY" instead. 2) Attached the corresponding evidences and/or records.
Quality
On time (Every 2nd
Monthly Project Actual Cost Submit generated project Every 6th day of the Every 5th day of the Every 4th day of the Every 3rd day of the
1 22.5% NAV Entries day of the following 95% 5 95% 21.38%
(NAV Entry) manpower, equipment and following month following month following month following month
month)
material actual cost
PPCC - COST
MONITORING
Quality
Weekly Project Actual Cost
2 20.0% Submit generated project job NAV Entries Every Friday Every Thursday Every Wednesday Every Tuesday Every Monday 95% 5 95% 19.00%
(NAV Entry)
task actual cost vs budget
PPCC - COST
Project Technical Audit
CONTROL
Quality
Consolidate audited project Audited Reports/Action 11 days after audit 10 days after audit 9 days after audit 8 days after audit 7 days after audit
4 20.0% 95% 5 95% 19.00%
technical reports and action Plans date date date date date
plans
Timeliness of compliance to
- Issue Logs ≥ 75% of ≥ 80% of ≥ 85% of ≥ 90% of ≥ 95% of
- Report ≥ 75% of requirements
5 Compliance Mandatory Requirement 15.0% requirements met on requirements met on requirements met on requirements met on requirements met on 95% 5 95% 14.25%
- Audit met on time
time time time time time
100.0% 95.00%
Prepared by: Reviewed and Approved by:
NAME NAME
Cost Engineer Sr. Cost Engineer
Doc. Code : FM-RNI-04-03
Rev. No. : 2
Eff. Date : 20 Feb 2017
Page Nos : see footer
Date Submitted:
Period Covered:
IMPROVEMENT PLAN
Note: Accomplish this portion if you have a grade of below 3 only
Project Name:
To :
From :
NOTES: 1) If the KPM or KPI is not applicable, do not delete the cell/row, put "N/A' or c/o "CO or CEY" instead. 2) Attached the corresponding evidences and/or records.
Timeliness
1 PLANNING & SCHEDULING 30.0% Complete Tender Documents Tender Documents Late Submission - - - Ontime Submission 95% 5 95% 28.50%
Requirements on prescrbe time
Quality
Accomplishment Report, >2 days delay or on 1.5 days delay or on 1 day delay or or on 0.5 day delay or on On time (Every 7th of
2 25.0% Submit a complete and accurate 95% 5 95% 23.75%
PPCC - PLANNING Based Schedule the 9th afternoon the 9th morning the 8th afternoon the 8th Morning the month)
Impacted Schedule
NAME NAME
Position Immediate Supervisor
Doc. Code : FM-RNI-04-
03
Rev. No. : 2
KEY PERFORMANCE MEASURES (KPM) MONTHLY REPORT - AUTOCAD OPERATOR Eff. Date
2017
: 20 Feb
NOTES: 1) If the KPM or KPI is not applicable, do not delete the cell/row, put "N/A' or c/o "CO or CEY" instead. 2) Attached the corresponding evidences and/or records.
KEY PERFORMANCE MEASURES KEY PEROFORMANCE INDICATORS ACTUAL PERFORMANCE RATING IMPROVEMENT PLAN
75% 80% 85% 90% 95% Equivalent Total % Note: Accomplish this portion if you have a grade of below 3 only
Item Deliverable Weight Equivalent
Work Process Deliverables Measure STATISTICS Percentage Performance
No (DW) Grade (EG)
(EP) (EP*DW) Date of
1 2 3 4 5 Immediate Action Root Cause Corrective Action
Implementation
100.0% 88.75%
Prepared by: Reviewed by: Approved by: Noted By:
Rev. No. : 2
KEY PERFORMANCE MEASURES (KPM) MONTHLY REPORT - AUTOCAD OPERATOR Eff. Date
2017
: 20 Feb
NOTES: 1) If the KPM or KPI is not applicable, do not delete the cell/row, put "N/A' or c/o "CO or CEY" instead. 2) Attached the corresponding evidences and/or records.
KEY PERFORMANCE MEASURES KEY PEROFORMANCE INDICATORS ACTUAL PERFORMANCE RATING IMPROVEMENT PLAN
75% 80% 85% 90% 95% Equivalent Total % Note: Accomplish this portion if you have a grade of below 3 only
Item Deliverable Weight Equivalent
Work Process Deliverables Measure STATISTICS Percentage Performance
No (DW) Grade (EG)
(EP) (EP*DW) Date of
1 2 3 4 5 Immediate Action Root Cause Corrective Action
Implementation
100.0% 88.25%
Prepared by: Reviewed by: Approved by: Noted By: