WORK ORDER
To
Tushar Infrastructure,
1st floor, Flat No 102, C Wing, Balaji Residency, Hedutane

Kind Attn: Mr. Tushar

Work Order No.003 - SNES/QTN/23-24 Date: 25-05-2023


Subject: Work Order For Block Work, Internal and External Plaster (Only Labour) at
D-73, Turbhe Midc

Dear Sir,
With reference to your quotation and subsequent negotiations you had with us, we are pleased to award work order to you with
following terms and conditions.

Sr. No. Scope of work Rate Units


1 200 MM AAC Block Work 27 per sqft
2 Internal Single sand plaster 12MM to 15MM thk 18.5 per sqft
3 External Double Coat Plaster 18MM to 25MM thk 28 per sqft

TOTAL (INR)

TERMS AND CONDITIONS


1 The above rates includes all labor work only

2 Curing pipe, Curing Motor & Labour Helmet , Lift mixer machine, diesel,
electricity, katha provided by us
3 Billing will be submitted on every 15 days as per measurement and it will be
release within 7 days

Payment On every 3rd bill, we will release 80% of the bill and hold 20% of the bill.
And on 4th bill, we will release the remaining 20% of the bill.

Validity 1 week

P. GOVIND RAJ

Quotation (3) Page 1


Sri Naganives Engineering & Service’s
Plot no PAP . A-141/142, MIDC Khairane , Navi Mumbai. 400 703
Tel. No . Mob .09320082777,09321082777
Specialist In :- Fabrication & Erection and Commissioning, (FOOD INDUSTRIES) HVAC for industrial, Commercial Building’s Non IBR, Air and Fire
pipe installations and Commissioning, Industrial
Electrical, Hot& Cold insulation and Painting Works GST.Reg No, is -27ADMPP4853F1Z7

WORK ORDER
To
Rampal,

Kind Attn: Mr. Rampal

Work Order No.002 - SNES/QTN/23-24 Date: 24-05-2023


Subject: Work Order For Marble Cutting and Fitting Work (Only Labour) at D-73,
Turbhe Midc

Dear Sir,
With reference to your quotation and subsequent negotiations you had with us, we are pleased to award work order to you with
following terms and conditions.

Sr. No. Scope of work Rate Unit


1 Marble Cutting and Fitting Work 45 rft

TOTAL (INR)

TERMS AND CONDITIONS


1 The above rates includes all labor work only
2 Marble material will be provided by us
3 Billing will be submitted on every 15 days as per measurement and it will be
release within 7 days

Payment On every 3rd bill, we will release 80% of the bill and hold 20% of the bill.
And on 4th bill, we will release the remaining 20% of the bill.

Validity 1 week

P. GOVIND RAJ

Quotation (2) Page 2


Sri Naganives Engineering & Service’s
Plot no PAP . A-141/142, MIDC Khairane , Navi Mumbai. 400 703
Tel. No . Mob .09320082777,09321082777
Specialist In :- Fabrication & Erection and Commissioning, (FOOD INDUSTRIES) HVAC for industrial, Commercial Building’s Non IBR, Air and Fire
pipe installations and Commissioning, Industrial
Electrical, Hot& Cold insulation and Painting Works GST.Reg No, is -27ADMPP4853F1Z7

WORK ORDER
To
Firoz,

Kind Attn: Mr. Firoz

Work Order No.001 - SNES/QTN/23-24 Date: 24-05-2023


Subject: Work Order For RCC Work (Only Labour) at D-73, Turbhe Midc

Dear Sir,
With reference to your quotation and subsequent negotiations you had with us, we are pleased to award work order to you with
following terms and conditions.

Sr. No. Scope of work Rate Units


1 Overhead water tank 4.5 per litre
2 Shuttering Work 350 sqm
3 Steel Fitter Work 10000 tonne
4 Staircase Tappa 250 nos
5 Starter (Column) 250 nos
6 Plywood Making 100 per sqm
7 Linton Bin Chajja Work 3000 per nos

TOTAL (INR)

TERMS AND CONDITIONS


1 The above rates includes all labor work only
2 Shuttering material will be provided by us
3 Billing will be submitted on every 15 days as per measurement and it will be
release within 7 days

Payment On every 3rd bill, we will release 80% of the bill and hold 20% of the bill.
And on 4th bill, we will release the remaining 20% of the bill.

Validity 1 week

P. GOVIND RAJ

Quotation Page 3

You might also like