You are on page 1of 7

A B C D E F G H J K

GENERAL NOTES
A) FOR PIPING AND INSTRUMENTATION LEGENDS
AND SYMBOLS SEE P&IDS 214992C-200-PID-0090-2005
THROUGH 2045.

1 1
218
FI
0011 L
7765 218-GF-1000-1CS1S07- -NI-
GF
218-I-NDW NOTES:
G
1. THIS IS TYPICAL ARRANGEMENT FOR N2/FUEL GAS. THE NUMBER AND LOCATION OF
NITROGEN / FUEL GAS PURGE TO BE CONFIRMED DURING FURTHER PHASE OF
ENGINEERING.
2. DETAILED FLARE AND BLOWDOWN HEADER TO BE DEVELOPED DURING FURTHER
218 218 PHASE OF ENGINEERING.
FO FT
0010 6507

7745 218-NL-1007-1CS1S07- -NI-


NL
218-I-2220 1

2 AVOID NOTES OVERLAPPING 2


WITH THE MARGIN. MAKE IT
CLEAR.

COLD RELIEF 218-CFL-1003-1SA0S02-60"-NI- COLD RELIEF


7716 2700 218-I-2050
TO V-21801
2

3 3

4 4
COLD BLOWDOWN 218-BC-1001-1SA0S02-16"-NI- COLD BLOWDOWN
7715 2701 218-I-2050
TO V-21801
2
REFERENCE DRAWINGS
DRAWING NO. TITLE

A 24/11/23 ISSUED FOR REVIEW RM KP GC

The present document or drawing is property of TECHNIP ENERGIES ITALY S.p.A. and/or its Affiliates and shall

disclosed or used, without TECHNIP ENERGIES ITALY S.p.A. and/or its Affiliates prior written consent, for any
purpose and in any way other than that for which it is specifically furnished or o utside the extent of the agreed
REV DATE DESCRIPTION DRAWN CHECKED APPROVED

not, under any circumstances, be totally or partially, directly or indirectly, transfe rred, reproduced, copied,
Saudi Basic Industries Corporation
Engineering and Project Management
Jubail, Kingdom of Saudi Arabia

PROJECT DESCRIPTION

RAS-AL KHAIR OIL TO CHEMICALS


MIXED FEED STEAM CRACKER &
PYROLYSIS GASOLINE HYDROTREATER UNIT
6 DRAWING TITLE
PIPING & INSTRUMENTATION DIAGRAM
218 - UTILITIES
COLD FLARE AND BLOWDOWN COLLECTION
A 24/11/23 MC
REV DATE AUTHORISED
PLANT NAME AREA/UNIT SIZE
214992C ROC MFSC 216

upon right of use.


A1
Project
A.I.D. DRAWING NUMBER SHT. NO. REVISION
218-PID-0031-2045 A
Unit Doc.Type Disc Subj Ser.No
218-I-2045 1of 1
FILE NAME:

A B C D E F G H
A B C D E F G H J K
ATM PSET=
V-21801 E-21802 E-21801
GENERAL NOTES
218 COLD FLARE KNOCK-OUT DRUM 5 barg/, / 90 C / -196 C COLD FLARE SUPWERHEATER
21 PSV
+ COLD FLARE BLOWDOWN VAPORIZER A) FOR PIPING AND INSTRUMENTATION LEGENDS
ATM 218-VA-1000-1CS1S07- -NI- 0201 A Dimensions ID x T-T:, Type:TEMA shell type K Shell & Tube heat exchanger Type:TEMA shell type K Shell & Tube heat exchanger AND SYMBOLS SEE P&IDS 214992C-200-PID-0090-2005
Design Pressure (Max/Min) and Design Temperature (Max/Min):/,/ Heat Duty: 10 barg/FV / 230 C / -5 C Heat Duty: THROUGH 2045.
20 PSET= Materials of Construction: Surface Area: Surface Area:
Trim.: Shell Design Pressure (Max/Min) and Temperature(Max/Min):/,/ Shell Design Pressure (Max/Min) and Temperature(Max/Min):/,/ 10 barg/FV / 230 C / -5 C
218
PSV+ Insulation (type/thickness): / Tube Design Pressure (Max/Min) and Temperature(Max/Min):/,/ Tube Design Pressure (Max/Min) and Temperature(Max/Min):/,/ 5 barg/, / 170 C / -196 C
21 0201 B Materials of Construction (Shell/Tubes): /
218-VA-1001-1CS1S07- -NI- Materials of Construction (Shell/Tubes): /
LO Trim (Shell/Tubes): / 5 barg/, / 170 C / -196 C
1 Insulation(type/thickness): /
Trim (Shell/Tubes): / 1
20 218 - SP Insulation(type/thickness): /

218-SL-1001-1CS1S07- -IH-
001
218
FI
LC 0226

NOTES:
218 1. ACCESSIBLE TO OPERATOR.
FT 2. TOP CONNECTION.
0226 3. TWO PARALLEL 100% CAPACITY STEM TRAPS ARE PROVIDED.
4. TEMPERATURE LOCAL READING TO BE READABLE BY OPERATOR AT
218 GLOBE VALVE. TRANSFER TO BE DONE ONLY WHEN THE
FE+
TEMPERATURE IS MORE THAN 10°C.
14 0226 2788
12 218-SL-1005-1CS1S07-20"-IH- 5. 18" DIA X XXXX MM LONG PIPE USED FOR COLLECTION AND
SL
LO BLOWDOWN OF HEAVY HYDROCARBONS FROM V-21801. LIQUID TO BE
218 218 H 6
218-I-IMP TRANSFERRED OUT BY NITROGEN PRESSURE.
TI I
22 2111
6. PROVIDE ADEQUATE STEAM TRAP FOR CONDENSATE REMOVAL.
0202 L 0201 L 7. TWO PHASE FLOW. PROVIDE ADEQUATE SUPPORT.
8. VENT TO ATM AT SAFE LOCATION.
218 218 HH 9. EXCHANGER E-21801 CENTERLINE SHALL BE XXXX MM BELOW V-21801
2 218 LT LI BTL. 2
TT 0206 0206 10. DISCHARGE TO GRADE NEAR CATCH BASIN. PROVIDE SPLASH
LL
0202 GWR GUARDS.
11. ROUTE TO SAFE LOCATION.
COLD RELIEF 19 12. VALVE TO OPEN WHEN EXCHANGER SHELLSIDE CONDENSATE LEVEL
218 H IS HIGH AND CLOSE WHEN LEVEL IS LOW.
218-I-2060 2773 E-21802 218 218
LG LT LI 13. LOCATE VALVE AT GRADE MINIMUM DISTANCE FROM SOURCE.
TO OSBL 218-CFL-1002-1CA1S09-60"-NI- 0201 0201 0201
L 14. TEMPERATURE RANGE TO BE -150°C TO +150°C.
218-CFL-1001-1SA0S02-60"-IH- MAG GWR
15. VALVE TO BE ACCESSIBLE TO OPERATOR AND IN VIEW OF PG.
1CB1S08 16. COLLECTION HEADER DETAILS AND ROUTING TO BE FINALIZED DURING
DETAILED ENGINEERING.
17. MINIMIZE PIPING.
218 - SP 18. LINE SIZE BY DEC.
218
TG 19. NO POCKETS.
167
0201 20. PROVIDE 6MM WEEPHOLE AT LOW POINT, ROUTED TO SAFE
10" 10" 2966
218-SCL-1002-1CS1S07-10"-IH- LOCATION.
T SCL
ATM 21. VENT TO ATMOSPHERE AT A SAFE LOCATION.
PSET= 218-I-IMP
19 7 22. NON SLAM TYPE CHECK VALVE.
218 3/4"
3 2110
218 ATM 21 PSV+
218 218-VA-1002-1CS1S07- -NI- 0102 A
TI 218 - SP
218-BC-1001-1SA0S02-16"-NI- 14 TT
3 2701 218-I-2045 0205 L 0205
20 PSET= 166 HOLDS: 3
FROM COLD 21 10" 10"
BLOWDOWN HEADER
7 16 218 1. FLUID CODE AND PIPE SPECS FOR ALLA LINES.
PSV
+ T
0102 B 2. LINE SIZES
218-VA-1003-1CS1S07-8"-NI-
3/4" 3. CONTROL VALVE AND BYPASS SIZES.
LO 3
218-CFL-1003-1SA0S02-60"-NI- 4. PSV SIZES AND ASSOCIATED LINE SIZES
2700 218-I-2045 20 218 - SP 218
I
FROM COLD FLARE 218 014 update interlock
HEADER
16 TI 0110 symbol
14 DETAIL E4
0104
218

LC
XV
+

218 8 0101
6"
LI 218-VA-1004-1CS1S07-6"-IS-
218
0102 TT LO 12 FC
10 TSO
0104 18

218
LT 11
0102
19
3"

218-CFL-1000-1SA0S02-30"-NI-

218-SL-1000-3CS1S26- -IH-
4 4

3457
7382
218-SL-1006-1CS1S07-12"-IH-
218 HH 218 218 SL
LI H 24"
LT LG V-21801 MH
LO
6
218-I-2111 REFERENCE DRAWINGS
0103 0103 0103 22
GWR MAG DRAWING NO. TITLE

17

2" LO 218
BTL = 9 I 12
0101

4"

9 218 218 218 H 218


E-21801 LI 218
LI
H
LG LT LT
0104 0104 0104
5 17 MAG GWR L 0107
GWR
0107
L

17
LPT 218-BC-1001-1SA0S02-12"-NI-
218 A 24/11/23 ISSUED FOR REVIEW RM KP GC

The present document or drawing is property of TECHNIP ENERGIES ITALY S.p.A. and/or its Affiliates and shall
LO

disclosed or used, without TECHNIP ENERGIES ITALY S.p.A. and/or its Affiliates prior written consent, for any
TG

purpose and in any way other than that for which it is specifically furnished or o utside the extent of the agreed
REV DATE DESCRIPTION DRAWN CHECKED APPROVED
0107

not, under any circumstances, be totally or partially, directly or indirectly, transfe rred, reproduced, copied,
1 Saudi Basic Industries Corporation
218 - SP
Engineering and Project Management
2" 164 Jubail, Kingdom of Saudi Arabia
6" 6" 7390
218-SCL-1001-1CS1S07-6"-IH-
1 4" T SCL
218-I-2110
4 15 218-NL-1003-1CS1S07-2"-NI-
7363
3/4" 19 7
NL 3
218 218 218-I-2220 218 - SP PROJECT DESCRIPTION
TG PG
0106 0103 15 NITROGEN 165 RAS-AL KHAIR OIL TO CHEMICALS
6" 6" MIXED FEED STEAM CRACKER &
218-BC-1000-1SA0S02-18"-NI- 218 T PYROLYSIS GASOLINE HYDROTREATER UNIT
LG 218
6 0105 I 3/4" DRAWING TITLE
PIPING & INSTRUMENTATION DIAGRAM
5 2 DETAIL E4 0102 3
218 - UTILITIES
218
XV
+
A 24/11/23 MC COLD FLARE KNOCKOUT DRUM
8 218-VA-1005-1CS1S07-4"-IS- 0102
4" 6" 218-SCL-1000-1CS1S07-6"-IS- REV DATE AUTHORISED
4 PLANT NAME AREA/UNIT SIZE
HOT BLOWDOWN
218-BH-1003-1CB1S08-4"-NI- 10 LO FC 214992C ROC MFSC 218

upon right of use.


A1
218-I-2060 2988 18 TSO 12 Project
NNF
TO V-21802 A.I.D. DRAWING NUMBER SHT. NO. REVISION
4 11 218-PID-0031-2050
Unit Doc.Type Disc Subj Ser.No
218-I-2050 1of 1 A
FILE NAME:

A B C D E F G H
A B C D E F G H J K

GENERAL NOTES
A) FOR PIPING AND INSTRUMENTATION LEGENDS
AND SYMBOLS SEE P&IDS 214992C-200-PID-0090-2005
THROUGH 2045.

1 1

7797
218-GF-1001-1CS1S07- -NI- NOTES:
GF 218
FI 1. THIS IS TYPICAL ARRANGEMENT FOR N2/FUEL GAS. THE NUMBER AND LOCATION OF
0013 NITROGEN / FUEL GAS PURGE TO BE CONFIRMED DURING FURTHER PHASE OF
L ENGINEERING.
2. DETAILED FLARE AND BLOWDOWN HEADER TO BE DEVELOPED DURING PHASE OF
ENGINEERING.
218
218 FT
FO 0013
0012

7792
NL 218-NL-1008-1CS1S07- -NI-
218-I-2220 AVOID NOTES OVERLAPPING
2 1 2
WITH THE MARGIN. MAKE IT
CLEAR.

3430
HOT RELIEF 218- -1001-1CB1S08-78"-NI- HOT RELIEF
7785 7788 218-I-2060
TO V-21802
2

3 3

4 4

REFERENCE DRAWINGS
DRAWING NO. TITLE

HOT BLOWDOWN 218-BH-1004-1CB1S08-8"-NI-


3438 HOT BLOWDOWN
7783 7786 218-I-2060
2 TO V-21802

A 24/11/23 ISSUED FOR REVIEW RM KP GC

The present document or drawing is property of TECHNIP ENERGIES ITALY S.p.A. and/or its Affiliates and shall

disclosed or used, without TECHNIP ENERGIES ITALY S.p.A. and/or its Affiliates prior written consent, for any
purpose and in any way other than that for which it is specifically furnished or o utside the extent of the agreed
REV DATE DESCRIPTION DRAWN CHECKED APPROVED

not, under any circumstances, be totally or partially, directly or indirectly, transfe rred, reproduced, copied,
Saudi Basic Industries Corporation
Engineering and Project Management
Jubail, Kingdom of Saudi Arabia

PROJECT DESCRIPTION

RAS-AL KHAIR OIL TO CHEMICALS


MIXED FEED STEAM CRACKER &
PYROLYSIS GASOLINE HYDROTREATER UNIT
6 DRAWING TITLE
PIPING & INSTRUMENTATION DIAGRAM
218 - UTILITIES
A 24/11/23 MC HOT FLARE AND BLOWDOWN COLLECTION
REV DATE AUTHORISED
PLANT NAME AREA/UNIT SIZE
214992C ROC MFSC 218

upon right of use.


A1
Project
A.I.D. DRAWING NUMBER SHT. NO. REVISION
218-PID-0031-2055 A
Unit Doc.Type Disc Subj Ser.No
218-I-2055 1of 1
FILE NAME:

A B C D E F G H
A B C D E F G H J K

PK-21810 2 GENERAL NOTES


CONDENSATE POLISHER PACKAGE 218
FI
218 COMMON A) FOR PIPING AND INSTRUMENTATION LEGENDS
XA TROUBLE 1001 AND SYMBOLS SEE P&IDS 214992C-200-PID-0090-2005
1021 THROUGH 2045.

218
FT 218
1001 FE
+

1 3 VENDOR 1001 1
PK-21810 10WT% CAUSTIC
213-KC-1213-3CB2S33-2"-NI-
CAUSTIC M 218-I-2085 3394
1
FROM P-21340

3
98% H2SO4
SULFURIC 218-HS-1003-1CB2S15-2"-IH- NOTES:
3395
ACID 218 218 FROM OSBL 1. NUMBER OF POLISHERS TO BE FINALIZED BY VENDOR
FI FT
1002 1002 2. VENDOR PACKAGE TO BE FINALIZED BY DETAILED ENGINEERING
BL CONTRACTOR.
3. CHEMICAL INJECTION PACKAGES ARE PART OF PK-21810.

218 4. ANALYZER RETURN TO STORM WATER SEWER.


218 218
PG PT PI 5. ONLINE CONDUCTIVITY MONITORS ALARMS AND MANUAL DIVERT
1001 1001 1001 VALVES WILL BE INSTALLED ON EACH COMPRESSOR SURFACE
218 218 6 CONDENSOR DOWNSTEAM SUB HEADER TO THE CONDENSATE
H H
AI AI LP STEAM POLISHER PACKAGE.
1004 1001 218-SCL-XXXX-1CS1S07-2"-IH- 3396 6. UTILITY LINE SIZES WILL BE CONFIRMED DURING DETAIL ENGINEERING.
SCL
218-I-2110
2 218 218 218
2
AT AT FE
+

1004 1001 1002


218 218 218
PG PT PI HOLDS:
SI COND
218 218 1002 1002 1002 1. FLUID CODE AND PIPE SPECS FOR ALL LINES.
SC
21801 4 AE AE 4 INSTRUMENT AIR 2. LINE SIZES.
CGC SURFACE 1004 1001
CONDENSATE 3397 3. CONTROL VALVE AND BYPASS SIZE.
218-AI-XXXX-1SA0S03-2"-NI-
EQUIPMENT 5 AI 4. CGC/C3R/C2R SURFACE CONDENSATE EQUIPMENT P&ID.
218-SCV-XXXX-1CS1S07-6"-NI- 10"
3339 HOLD 4 218-I-2220
TO XXXX
218 218 218
PG PT PI
1003 1003 1003

218 218 PLANT AIR


H H
AI AI 3398
218-AI-XXXX-1CS1S07-2"-NI-
1005 1002 AI
218 218-I-2220
FI
218 218 1003
218 218
3 AT AT
AI PC 3
1005 1002 1021 1004

SI COND 218 218


218 218 AI 218 FT
SC 1003
21802 4 AE AE 4 1022 PT 218
C2R SURFACE 1005 1002 PV
+
1004
CONDENSATE 1004 SURFACE
EQUIPMENT 5 CONDENSATE
218-SCV-XXXX-1CS1S07-6"-NI-
3369 HOLD 4 3402
TO XXXX FC TO OSBL
218 218
AT AT 218 BL
1021 1022 FE
+

1003

218 H 218 H
AI AI SI COND
218 218
1006 1003 AE AE
1021 1022
4 4 POLISHED
CONDENSATE
218 218 218-SCL-1003-1CB1S08-14"-IH-
AT AT 3400 218-I-2140
4 1006 1003 TO E-21841 4
SI COND
218 218
SC
21803 4 AE AE 4
C3R SURFACE 1006 1003
CONDENSATE
EQYUIPMENT 5
218-SCV-XXXX-1CS1S07-6"-NI-
3368 HOLD 4 REFERENCE DRAWINGS
TO XXXX DRAWING NO. TITLE
218-SCH-1001-1CS1S07-6"-NI-

218-SCH-1002-1CS1S07-6"-NI-
NNF

NNF

NNF

5
3365
218-SCH-1000-1CS1S07-10"-NI-
SCH A 24/11/23 ISSUED FOR REVIEW RM KP GC

The present document or drawing is property of TECHNIP ENERGIES ITALY S.p.A. and/or its Affiliates and shall
NNF

disclosed or used, without TECHNIP ENERGIES ITALY S.p.A. and/or its Affiliates prior written consent, for any
218-I-2095

purpose and in any way other than that for which it is specifically furnished or o utside the extent of the agreed
REV DATE DESCRIPTION DRAWN CHECKED APPROVED
218-I-XXXX

not, under any circumstances, be totally or partially, directly or indirectly, transfe rred, reproduced, copied,
Saudi Basic Industries Corporation
Engineering and Project Management
Jubail, Kingdom of Saudi Arabia

PROJECT DESCRIPTION

RAS-AL KHAIR OIL TO CHEMICALS


MIXED FEED STEAM CRACKER &
PYROLYSIS GASOLINE HYDROTREATER UNIT
6 DRAWING TITLE
PIPING & INSTRUMENTATION DIAGRAM
218 - UTILITIES
A 24/11/23 MC CONDENSATE POLISHER PACKAGE
REV DATE AUTHORISED
PLANT NAME AREA/UNIT SIZE
214992C ROC MFSC 218

upon right of use.


A1
Project
A.I.D. DRAWING NUMBER SHT. NO. REVISION
218-PID-0031-2065 A
Unit Doc.Type Disc Subj Ser.No
218-I-2065 1of 1
FILE NAME:

A B C D E F G H
A B C D E F G H J K

PK-21840
15 GENERAL NOTES
DEAERATOR A) FOR PIPING AND INSTRUMENTATION LEGENDS
1 1 BY VENDOR AND SYMBOLS SEE P&IDS 214992C-200-PID-0090-2005
Duty:NULL THROUGH 2045.
ATM ATM PSET=
218
PSV+
3
4011 A
PSET=
1 218
PSV
+
3 1
4011 B

1 1

LC

LO
ATM ATM NOTES:
218 - SP
021 1. VENT TO ATMOSPHERE AT A SAFE LOCATION.
218 2. LINE SIZE BY DEC.
FO+
3. PSV TO BE SUPPLIED BY DEAERATOR VENDOR. NO. OF PSV TO BE
4004
13 3" 3" DETERMINED BY VENDOR.
4. DEAERATOR LOW LOW LIQUID LEVEL 2OO3 VOTINGS TRIPS SHP & HP
16 BFW PUMPS ONE AT A TIME IN 30 SECOND INTERVALS.
1CB1S08 DEMIN WATER
218-DM-1050-1SA0S06-12"-IH- 5. DEAERATOR HIGH HIGH LIQUID LEVEL OPENS ON OVERFLOW LINE AND
218-I-2125 3338 RESET THE VALVE TO CLOSE WHEN THE LEVEL DROPS TO HIGH LIQUID
FROM E-21820 LEVEL.
6. GRAVITY FLOW FROM VALVE.
7. DISCHARGE AT SAFE LOCATION.
2 218 H 218 8. REFER TO DETAIL "A" BELOW FOR INJECTION DETAIL. 2
PC PT
4012 L 4012
REMOVABLE ELEMENT

24"
MW

218 A05M
TG 45° A33A
218 4017 LP CLEAN
PV
+
16 CONDENSATE
4012
LP STEAM 16 218-SCL-1051-1CS1S07-18"-IH-
14" 218-I-2115 2685
218-SL-1056-1CS1S07-16"-IH- 24"
3231 218-I-2110 FROM V-21810
FO 17 9 D/2
FROM LS HEADER CL
10 FLOW D

14"
OXYGEN SCAVENGER
11 RS 218-KP-1015-1SD0S04-2"-NI- DETAIL "A"
3 218-I-2205 3218 3
1CB1S08 8
MIN FLOW FROM PK-21895
17 9. TWO PHASE FLOW. PROVIDE ADEQUATE SUPPORT.
218-BFW-1007-1CS1S07-6"-IH- DETAIL "A"
2867 218-I-2075 10. PROVIDE ADEQUATE STEAM TRAPS FOR CONDENSATE REMOVAL.
MIN
FROM P-21840A 11. TOP CONNECTION.
4 12. ANALYSER SAMPLE RETURN TO STORM WATER SEWER.
218 13. GLOBE VALVE REQUIRED TO ADJUST VENT FLOW.
1CB1S08 PI
MIN FLOW 218
218-BFW-1008-1CS1S07-6"-IH- 218 14. 218-TG-018 TO BE READABLE FROM START-UP STEAM INLET VALVE.
2878 218-I-2075 4013 S LZALL
15. VENDOR PACKAGE TO BE FINALIZED BY DETAILED ENGINEERING
0001 4012 2oo3 HH HH HH
FROM P-21840B CONTRACTOR.
218 218 218 218 218
LZAHH LZI LZI LZI 16. NON SLAM TYPE CHECK VALVE.
5 S
218 0002 4012 4012 A 4012 B 4012 C 17. NO POCKETS.
MIN FLOW 1CB1S08 PT
218-BFW-1009-1CS1S07-6"-IH- 4013 LL LL LL
2879 218-I-2075
FROM P-21840C

4 4
218-SL-1069-1CS1S07-2"-IH-

24" 218 218 218 218 218 218 H


MH PK-21840 LZT LZT LZT LG LT LC 3150 218-I-2140
REFERENCE DRAWINGS
4012 A 4012 B 4012 C 4013 4013 4013 L DRAWING NO. TITLE
TO 218-LV-4124
GWR GWR GWR MAG GWR

START-UP
14
BTL = 12000 MM
218-BFW-1013-1CS1S07-12"-IH-
218-BFW-1011-1CS1S07-4"-IH-

5 MIN
218
TI
218
TG 4019
4008 2"
A 24/11/23 ISSUED FOR REVIEW RM KP GC

The present document or drawing is property of TECHNIP ENERGIES ITALY S.p.A. and/or its Affiliates and shall
14

disclosed or used, without TECHNIP ENERGIES ITALY S.p.A. and/or its Affiliates prior written consent, for any
purpose and in any way other than that for which it is specifically furnished or o utside the extent of the agreed
218 REV DATE DESCRIPTION DRAWN CHECKED APPROVED

not, under any circumstances, be totally or partially, directly or indirectly, transfe rred, reproduced, copied,
1 TT
218 4019
S
11 RS
AMINE Saudi Basic Industries Corporation
0003 218-KP-1016-1SD0S04-1"-NI-
218-I-2205 3217 Engineering and Project Management
DETAIL E2 8 Jubail, Kingdom of Saudi Arabia
FROM PK-21897
218 DETAIL "A"
XZV
+
LO MIN
7 4004
2 218-BFW-1012-1CS1S07-12"-IS-
NNF OVERFLOW FC PROJECT DESCRIPTION
9 6 TSO 218 pH 218 18"
AI AT
RAS-AL KHAIR OIL TO CHEMICALS
5 4001 4001 12 MIXED FEED STEAM CRACKER &
PYROLYSIS GASOLINE HYDROTREATER UNIT
7 218 DISSOLVED 218
6 AI O2
AT
DRAWING TITLE
PIPING & INSTRUMENTATION DIAGRAM
4002 4002 12 218 - UTILITIES
SC A 24/11/23 MC DEAERATOR
218 21801
COND 218 REV DATE AUTHORISED
AI AT PLANT NAME AREA/UNIT SIZE
4003 4003 12 214992C ROC MFSC 218

upon right of use.


BFW A1
Project
218-BFW-1000-1CB1S08-18"-IH-
2843 218-I-2075 A.I.D. DRAWING NUMBER SHT. NO. REVISION
218-PID-0031-2070 A
TO P-21840A/B/C
Unit Doc.Type Disc Subj Ser.No
218-I-2070 1of 1
FILE NAME:

A B C D E F G H
6
4

5
3
2
1

T1
7641
218-SCO-XXXX-1CS1S07-18"-IH-

A
A

HOLD 2

4
218-SL-XXXX-1CS1S07- -IH- 7642

HOLD 2

218-SCO-XXXX-1CS1S07-18"-IH- 7643

HOLD 2

218-SL-XXXX-1CS1S07- -IH- 7645

B
B

HOLD 2

7390
218-SCL-1001-1CS1S07-6"-IH- 7609
SCL
218-I-2050

3457
218-SL-1006-1CS1S07-12"-IH- 7614
SL
218-I-2050

218-SCL-1002-1CS1S07-10"-IH- 2966
SCL
218-I-2050

C
C

218-SL-1005-1CS1S07-20"-IH- 2788
SL
218-I-2050

6418
215-SCO-1006-1CS1S07-6"-IH- 7619
SCO
218-I-2115
215

7074
215-SL-1009-1CS1S07- -IH- 7624
SL
218-I-2110
215

D
D

215-SCO-1003-1CS1S07-8"-IH- 7058
SCO
215-I-2095

7059
215-SL-1006-1CS1S07-16"-IH- 7639
SL
215-I-2095

E
E

6090
218-SCO-1050-1CS1S07-18"-IH-

213-SCO-1491-1CS1S07-6"-IS- 7635
SCO
213-I-2280

2460
213-SL-1480-1CS1S07-12"-IH- 7632
SL

F
F

213-I-2275

213-SCO-1467-1CS1S07-6"-IS- 2228
SCO
213-I-2355

2532
213-SL-1453-1CS1S07-10"-IH- 7627
SL
213-I-2350

210-SCL-1003-1CS1S07- -IH- 1055


SCL
210-I-2025

G
G

210-SL-1003-1CS1S07- -IH- 1056


SL
210-I-2025

210-SCL-1001-1CS1S07- -IH- 797


SCL
210-I-2010

210-SL-1000-1CS1S07- -IH- 796


SL
210-I-2010
2

H
H

A
REV

Unit
3

DATE

Doc.Type
24/11/23
218-SL-1054-1CS1S07- -IH-

3168

Project

Disc
TO V-21820

214992C
218-I-2110

LP SUSPECT
CONDENSATE

Subj
MC

218-PID-0031-2111
218-I-2120
3444

AUTHORISED
DISTRIBUTION
LP STEAM

FROM LP STEAM

Ser.No
A.I.D.
REV
J

FILE NAME:
HOLDS:

PLANT NAME
NOTES:

DRAWING TITLE
DATE
1. LINE SIZES.

PROJECT DESCRIPTION
3. NO POCKETS.

DRAWING NO.
THROUGH 2045.

218-I-2111
DRAWING NUMBER
ROC MFSC
GENERAL NOTES

DESCRIPTION
2. LINE NUMBER AND P&ID NUMBER.

A 24/11/23 ISSUED FOR REVIEW

218 - UTILITIES

AREA/UNIT
Jubail, Kingdom of Saudi Arabia
A) FOR PIPING AND INSTRUMENTATION LEGENDS
K

218
TITLE

RM
2. TWO PHASE FLOW. PROVIDE ADEQUATE SUPPORT.

DRAWN
REFERENCE DRAWINGS
AND SYMBOLS SEE P&IDS 214992C-200-PID-0090-2005

RAS-AL KHAIR OIL TO CHEMICALS


MIXED FEED STEAM CRACKER &

PIPING & INSTRUMENTATION DIAGRAM


1. PROVIDE ADEQUATE TRAPS FOR CONDENSATE REMOVAL.

LP STEAM & LP CONDENSATE DISTRIBUTION

1of 1
KP

SHT. NO.
CHECKED

PYROLYSIS GASOLINE HYDROTREATER UNIT


PHT FOR PHT ENERGY INTENSITY(EI) GUARANTEE CALCULATION.

Engineering and Project Management

SIZE
4. SUFFICIENT FLOWMETERS TO BE PROVIDED ON STEAM SUPPLY TO

A
A1
Saudi Basic Industries Corporation
GC

REVISION
APPROVED

The present document or drawing is property of TECHNIP ENERGIES ITALY S.p.A. and/or its Affiliates and shall
not, under any circumstances, be totally or partially, directly or indirectly, transfe rred, reproduced, copied,
1

4
3
2

disclosed or used, without TECHNIP ENERGIES ITALY S.p.A. and/or its Affiliates prior written consent, for any
purpose and in any way other than that for which it is specifically furnished or o utside the extent of the agreed
upon right of use.
A B C D E F G H J K

V-21855
GENERAL NOTES
FV@ 150°C/
OILY WATER SKIM OIL DRUM A) FOR PIPING AND INSTRUMENTATION LEGENDS
Dimensions ID x T-T:, AND SYMBOLS SEE P&IDS 214992C-200-PID-0090-2005
THROUGH 2045.
Design Pressure (Max/Min) and Design Temperature (Max/Min):3.5 barg/,90 C/-5 C
Materials of Construction:
Trim.:1CB1S08
Insulation (type/thickness): /
1 1

218
PCV +

5503
7172 3"
218-VA-1000-XXXXX- -NI- NOTES:
V
HOLD 5
HOLD 6 1. PUMP TO AUTO STOP ON LOW LEVEL.
2. THE SPARE PUMP TO BE KEPT IN WAREHOUSE.
3. VALVE TO BE OPERABLE FROM OUTSIDE PIT.
SHIFT HERE 4. VENTILATION NOZZLE.
5. PORTABLE PUMP OUT CONNECTION SHALL BE LOCATED FOR
218
DEWATERING SUMP NOZZLE.
PG 218
5504 6. INTERLOCK SHALL BE MECHANICAL KEY TYPE.
FO
+
218 5507
PCV +

5502
7127 3/4" 218-P-1052-XXXXX- -NI- LO LO
218-NL-1006-XXXXX- -NI-
NL HOLDS:
218-I-2220 LO LO HOLD 5
2 1. LINE SIZES. 2
2. EQUIPMENT DETAILS.
3. CONTROL VALVE AND BYPASS SIZES.
218 218
PI PT 4. PSV AND ASSOCIATED LINE SIZES.
SHIFT HERE 5501 5501 5. FLUID CODE AND PIPE SPEC.

6. P&ID NUMBER.

PSET= SKIMMED OIL


218-P-1002-1CB1S08- -NI-
7174 218-I-2060
218
PSV HOLD 5
+
TO P-21802
7152 LO 5505 A
218-RV-1066-XXXXX- -NI- DISCHARGE
RV
HOLD 5
HOLD 6
LO
PSET=
218
PSV +

5505 B

3 LO 6 3
218 - SP P
177 218
PG
LC LO 5506
1
218
I
5515
218
I
5515
218 H
218 218 LI 218 HH
TI LC LI
5510 L
5508 5509 5511 LL
218-P-1051-XXXXX- -NI-

1013 218-PWW-1009-XXXXX- -NI-


218-DO-XXXX-1CS1S08- -NI-
M 5
218 218 218 218
OILY WATER SO TT LT LT LT
5508 5509 5510 5511
7533 7176 218-I-2210
GWR GWR
4 FROM TK-21852 4
3

WASTE WATER AG
UG
SLOP

7522 7175 218-I-2215


E
REFERENCE DRAWINGS
RS
FROM TK-21853 DRAWING NO. TITLE
4
218-PWW-1008-XXXXX- -NI-
MH

P-21855

V-21855
A 24/11/23 ISSUED FOR REVIEW RM KP GC

The present document or drawing is property of TECHNIP ENERGIES ITALY S.p.A. and/or its Affiliates and shall

disclosed or used, without TECHNIP ENERGIES ITALY S.p.A. and/or its Affiliates prior written consent, for any
purpose and in any way other than that for which it is specifically furnished or o utside the extent of the agreed
REV DATE DESCRIPTION DRAWN CHECKED APPROVED

not, under any circumstances, be totally or partially, directly or indirectly, transfe rred, reproduced, copied,
Saudi Basic Industries Corporation
Engineering and Project Management
Jubail, Kingdom of Saudi Arabia

SLOP
E

PROJECT DESCRIPTION

RAS-AL KHAIR OIL TO CHEMICALS


MIXED FEED STEAM CRACKER &
PYROLYSIS GASOLINE HYDROTREATER UNIT
6 P-21855 DRAWING TITLE
PIPING & INSTRUMENTATION DIAGRAM
OILY WATER SKIM OIL DRUM PUMP 218 - UTILITIES
Service: A 24/11/23 MC WASTE WATER COLLECTION
Type:Sump pump REV DATE AUTHORISED OILY WATER SKIM OIL DRUM
Suction Discharge Pressure: PLANT NAME AREA/UNIT SIZE

Surface Area: 214992C ROC MFSC 218

upon right of use.


A1
Project
Material of Construction: A.I.D. DRAWING NUMBER SHT. NO. REVISION
218-PID-0031-2230 A
Unit Doc.Type Disc Subj Ser.No
218-I-2230 1of 1
FILE NAME:

A B C D E F G H

You might also like