30 April 2021
Context:
SSP-MRTC-UNGW-BMNS-NCR-0005 – Request for Re-evaluation & Acceptance
Present
1. Event time:
We refer to your rejection of our response to maintain the 7 nos. stumps Present
(1) refer
Context:
th
which you conveyed vide your NCR response sheet dated 24 April 2021. Past
(2) convey 2. Event time:
Past
Context:
Our design consultant a technical assessment and
(3) conduct
3. Event time:
that the constructed stumps structurally adequate
(4) conclude (5) be* 4. Event time:
for the purpose of connecting the future TOD columns, based on the following basis: 5. Event time:
ii. Grade 40 used for the stumps the same as the approved type used 7. Event time:
(7) be
for the station structural walls & roof slab and with the water 8. Event time:
(8) comply
penetration and water permeability test requirements.
Context:
In view of the above justification by our design consultant, we
(9) request
9. Event time:
that you our NCR response for the acceptance of proposal.
(10) reconsider
10. Event time:
We a copy of our NCR response with the technical assessment
(11) enclose
11. Event time:
for your review and approval.
Question 2
Objective:
24 August 2022
The result of our recent interim evaluation conducted in July 2022 for the period
2. Event time:
January – June 2022 that the performance rating of your office
(2) reveal
3. Event time:
into the Grade D category. This that the
(3) fall (4) indicate
4. Event time:
performance of your company to meet with our requirements.
(5) fail 5. Event time: