100 million m³ 12km 1.2 million
increased water storage main transfer estimated population
capacity tunnel impacted

Irati 50m Drop Shaft Model


The Northern Collector Tunnel is a critical infrastructure project
that will have a significant impact on the water supply to Nairobi.
The project will increase the city’s water storage capacity by
100 million cubic meters p.a. and will provide a reliable source of
water for the city’s growing population.
SMEC’s scope of work included detailed design,
preparation of tender documents, project monitoring
and construction supervision. The project faced
several challenges, including geological complexity,
and environmental and social constrictions.
Approximately 40%
of flood water from
the three rivers will
be captured and
diverted to the tunnel
and then to Ndakaini
Dam before being
piped to Nairobi.