You are on page 1of 1

8 7 6 5 4 3 2 1

POS M.A. QTY'. DESCRIPTION LENGTH MATERIAL WEIGHT REMARKS

¶ 2 3 4
F ELEV. +543.93m F
EQUATOR
5 6
MIN. 2270 mm ¬*
()

B
3739
1070 ± 2
´= TOTAL WEIGHT: 599 kg
795

00
00
=1
US
A A

DI
GENERAL NOTES :

RA
130

ER
1.- BEFORE STARTING THE ASSEMBLY, SEE GENERAL ARRANGEMENT

NN
-1-
13380

I
DRAWINGS OF THE SPHERES
-1-
2.- MEASURING POINT.- EACH DISTANCE WOULD BE MEASURED BETWEEN COLUMNS;
(2) ANCHOR BOLTS ORIGIN OF MEASUREMENT SHOULD BE TAKEN FROM EACH COLUMN.
E 200 E
9641

B
3.- FILL WITH NON-SHRINKAGE MORTAR AFTER THE COLUMNS ARE LEVELED AND AFTER
ADJUSTMENT
WELD BETWEEN BASE PLATE AND SLIDING PLATE. NON-SHRINKAGE MORTAR UNDER
TO ¶ SPHERE COVER SET
THE COLUMNS SHALL BE DON AND MUST BE SET, BEFORE HYDROSTATIC TEST.

TO ¶ SPHERE 4.- GAP: 50 MIN.


500 (MIN.)

(*) THE FINAL VALUE WILL BE DEFINED BY


THE CONTRACTOR OF CIVIL WORKS ADJUSTMENT COVER 5.- THIS DIMENSION SHALL BE STRICTLY OBSERVED BY THE CIVIL WORKS CONTRACTOR.
(LOCATION AND DETAILS) 6.- ANCHOR BOLTS WILL BE SUPPLIED BY CIVIL SUBCONTRACTOR
TOC. +530.50m FOUNDATION DETAIL
7.- WORK WITH DRAWING A3-106304-02022-01
GAP (NOTE 4)

8.- ADJUSTMENT COVERS WILL BE SELECTED AND PROVIDED ACCORDINGLY REQUIRED


FOR DETAIL SEE DRAWING:

MIN. 50
THICKNESS OF ADJUSTMENT.

GROUT
A3-106304-02325-01
120
ADJUSTEMENT COVERS 9.- ALL DIMENSIONS IN mm, UNLESS OTHERWISE OTHERWISE SPECIFIED
(4 Sets per column)
2 3 4 5 6
´ 1300 10.- TOLERANCES:

115
D D
a) FOUNDATION UPPER SIDE, SHOULD BE LEVELED WITHIN A MAXIMUN RANGE
´ 900 COLUMNS - SUPPORT OF ± 6mm. REFERRED TO THE THEORIC ELEVATION
GENERAL ARRANGEMENT (ELEVATION) BASE PLATE
b) ANCHOR BOLTS SHOULD BE WITHIN A RANGE OF ± 6mm. REFERRED TO THE

GAP (NOTE 4)
THEORIC POSITION AND SHOULD BE PLUMBED 3mm. IN 300mm.
SLIDING PLATE
DETAIL -1-
c) ANCHOR BOLTS PROJECTION OVER THE FOUNDATION SHOULD BE
SEE NOTES 3 & 5 ± 13mm. THE SPECIFIED HIGHT

165
1
6 d) DIFERENCE BETWEEN THE TOP FACE LEVEL OF TWO (2) CONTIGUOUS
.36° TOC. +530.50m
FUNDATIONS SHOULD NOT BE GREATER THAN 3 mm.
12
600

110
32 11.- SETTLEMENT TOLERANCE:

115
.
73
TY °
(
a) DIFFERENTIAL SETTLEMENT REFERRED TO THE ADJACENT FOUNDATION CAN NOT
P)
55 EXCEED 8 mm. OUT OF THE REFERENCE PLANE
08
±5 SHEAR PLATES
C 12.- BILL OF MATERIAL FOR (1) SPHERICAL TANK, (5) REQUIRED. C

13.- HOT DIP GALVANIZED


SECTION B-B
32.
(
10

TY

73°
57

P)
0

´ 33 COLUMNS - SUPPORT
±5

BASE PLATE BASE PLATE


1
477

A 24-11-2023 ISSUED FOR REVIEW DE PM EM


SLIDING PLATE
SLIDING PLATE

REV DATE ISSUE, SCOPE OF REVISION PREPARED CHECKED APPROVED


8.

PROJECT TITLE:
5

18°

DESIGN, SUPPLY AND CONSTRUCTION OF NEW LPG STORAGE B


270° 90° FACILITIES IN FIVE SPHERICAL VESSELS AT
217
1

217
7783 ±5

ZARKA REFINERY SITE PROJECT


TOC. +530.50m
COMPANY:

75
500
B
GRADE LEVEL JORDAN LIQUEFIED PETROLEUM GAS MANUFACTURING
+530.00m & FILLING COMPANY
5 T.O.C.
77
50 MIN.

15

=9
GROUT

EPC CONTRACTOR:
917

R
MID CONTRACTING
TETCO GROUP

´ 1070 CONSULTANT:
700

ILF CONSULTING ENGINEERS


SECTION A-A
A
SUBCONTRACTOR:
28

DURO FELGUERA ENERGY STORAGE


180°
69

Energy Storage
A
FI-825 8251 S-309
COLUMN CIRCLE DIAMETER= 19550 DRAWING TITLE :

FI-825 8252 S-310


FI-825 8253 S-311
ANCHOR BOLTS FOR COLUMN SUPPORTS
TOP VIEW
ORIGINAL SHEET SIZE - A3

ANCHOR DETAIL POS 1 (S-309 / S-310 / S311 / S-312 / S-313)


FI-825 8254 S-312
PROJECT No. - 15488

(NOTE 6) "Copying ofthis documentand giving itto others and the use
FI-825 8255 S-313 or communication of the contents thereof are forbidden SCALE: DRAWING NO: SHEET OF REV.
withoutexpress authority.Offenders are liable to the payment

JOB Nº SERIAL Nº EQUIPMENT ofdamages.Allrights are reserved in the eventofthe grantof


S/E A3-106304-02021-01 1 1 A
a patent or the registration of a utility model of design"

8 7 6 5 4 3 Printing:06.11.2023 1

You might also like